ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © 1997-2014 V&R Energy.

Slides:



Advertisements
Similar presentations
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Advertisements

1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
RPEWG Meeting, Salt Lake City August 21, 2013 Milorad Papic IEEE PES PSACE Panel Mitigation and Prevention of Cascading Outages:
Using Synchrophasors for Preventing Cascading Outages
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Marianna Vaiman, V&R Energy
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
PacifiCorp-CAISO EIM Initiative Overview
Using Synchrophasor Data to Diagnose Equipment Mis-operations and Health Alison Silverstein WECC JSIS Meeting, September 10,
Introduction to Phasor Measurements Units (PMUs)
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Phase Angle Alarming in ROSE for Steady-State Stability Analysis Marianna Vaiman V&R Energy JSIS Meeting Salt Lake City, UT March 5, Copyright ©
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved.Rev 5058-CO900E PUBLIC INFORMATION L19 - Combining the Latest Rockwell Automation® Hardware.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
Macomber Map Demonstration
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
PHAAUG – Peak Reliability
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January 2004 Jeff Dagle, Pacific Northwest National Laboratory.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Peak RCCo Performance Metrics Draft –November 2013.
WIRAB Comments to the Peak Reliability Interim Board Doug Larson, WIRAB December 4, 2013.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Global City Teams Challenge September 29-30, 2014 Report Out: Project X.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Page 1 California ISO – Internal Use Only – DRAFT CAISO’s Market and Reliability Operations, September 21, 2015 EMMOS Users Conference Indianapolis, IN.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc.
FERC Staff’s Report on Demand Response and Advanced Metering.
PJM Interconnection Smart Grid Investment Grant Update
How Markets Fared this Summer and What to Expect in 2007 IEP 25 th Annual Meeting October 9, 2006 Steve McClary MRW & Associates, Inc. Oakland, California.
FAILURE FINDING TASK Module 5 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
2017 WECC JSIS Report March 21, 2017.
Phase Angle Limitations
Order from Chaos: Improving Quality of Care in a Resident/Faculty Practice Through Integrated Team Meetings Jennifer Leiser, MD, Sonja Van Hala, MD, MPH,
Grid Integration of Intermittent Resources
ISO New England System R&D Needs
Terry Baker Peak Reliability
James D. McCalley, Iowa State University, System Stem Leader
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Cascading Failure Working Group of
NASPI PMU Data Application Classification
Enhanced Curtailment Calculator (ECC)
PacifiCorp-CAISO-NVE EIM Initiative Overview
Motion for the WECC-0135 Standard Drafting Team Option #2 21 Sept 2018 PRESENTATION TO WECC-0135 SDT DJORDJE Atanackovic, Ph.D.
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
Project WECC-0100 Update Reliability Subcommittee
NASPI PMU Data Application Classification
Hongming Zhang EMS Applications Manager, PEAK RC
Basic Matrix Operations
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Chapter 20 Assisted Reproductive Technologies
Presentation transcript:

ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy Systems Research, Inc. All rights reserved. 1

Grid Operator’s Monitoring & Control Assistant DOE Award to Advance Synchrophasor Technology - part of Peak’s Team – Project Participants - BPA, CAISO, IPC, Peak, SCE, SDGE – Scope includes: Demonstration of Linear State Estimator for voltage stability analysis; Determining of real-time corrective actions; Displaying data and results on situational awareness wall. – Real-time analysis based on the ROSE platform – Schedule: A 2-year project that should be starting in October 2014 Copyright © V&R Energy Systems Research, Inc. All rights reserved. 2

Evaluation of Potential Cascading Outages and their Prevention at SCE Project with SCE – Scope includes: Identifying potential cascading modes from steady-state and transient stability perspective; Adjusting existing controls in the SCE system that prevent occurrence of potential cascading modes; Adding new control devices to SCE network model in order to prevent occurrence of potential cascading modes. – Implementation for planning environment – Schedule: A 2-year project that started in September 2014 Copyright © V&R Energy Systems Research, Inc. All rights reserved. 3

Use of Potential Cascading Modes (PCM) for Automated IROL Analysis Project with ISO NE – Scope includes: Automating IROL analysis process using the PCM module Performing cascading analysis for every State Estimation solution every 3 minutes considering a broad set of N-1 and N-2 contingencies and the system wide monitoring; Performing analysis of cascading failures for any historical SE solutions in study mode Real-time analysis based on the ROSE platform – Schedule: A 1-year project that started in August 2014 Copyright © V&R Energy Systems Research, Inc. All rights reserved. 4