Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Transfer & Trades Special Transmission Workstream
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Review Group -140 Thoughts on additional information requirements.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Congestion Management
Review Group 291- Ofgem Update
Exit Capacity User Commitment – Transmission Workstream update
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
Review of System Alerts
Discussion on Mod262 and next steps
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Transmission Workgroup 6th March 2014
Review Group 291- Ofgem Update
Transmission Workstream 2nd December 2010
Entry Capacity Transfer and Trade
Entry Overrun Calculation
Reinstatement of NTS Interruption
Deferral of Retrospective Updates Functionality
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Transmission Workstream 05 November 2009
Presentation transcript:

Mark Dalton 4 February 2010 Transmission Workstream Discussion slides

2 Gas Balancing Alerts Background of GBA Mods 67, 101, 257 Give NGG discretion to remove a Within day GBA once it has been called. Parallel with “NISM” in Power. Purpose: An additional tool to permit NGG to minimise the costs of balancing the system Experience to date has shown the system has ended up long on days when GBAs have been called. It is apparent that IF NGG had had the ability to withdraw a GBA following market response, they would probably have wanted to do so, to minimise balancing costs. Discussion at Ops Forum 10/2/10 and then Urgent Mod

3 Capacity Buyback timing Gas Day (hours) Primary measure Commercial capacity mgmt tools (Buybacks / locational actions) Secondary measure Terminal Flow Advice (TFA) Restricts flow (day rate) NGG manage the grid within pressure bands and have commercial and physical tools to manage it. NGG use TFAs (Terminal Flow Advice) to manage Gas Quality (offspec) issues and also for short term physical flow variations where EoD deliveries are not impacted. Capacity buy backs (CBBs) are NGG’s primary tool to manage within day capacity constraints Locational trades available Where NGG use a TFA in the end of the day, NGG will seek the volume that can’t be made up through CBB to compensate shippers. Current cut off on Gemini is 2am for CBB bids –This should be extended to 3.30am as TFA will have changed physical flow –CBB is then to compensate rather than to affect flow rate changes (which will have already occurred). –Change is required to reflect the faster Ramp rates available to LNG terminals. TFA 2am Gemini cut off for CBB 3.30am Close for nom activity Propose extend time for CBBs to 3.30pm

4 Capacity treatment subject to Force Majeure Mod 262 background and Ofgem guidance Tirley planning decision (2/2/2010) – unanimous No! Seek to amend FM provisions under NWC GT B.3 Necessary, but deal with in TPCR5 as changes NGG Risk/Reward Change the definition of Capacity where non-existent, so that buyer relieved. What other impacts would this have? NGG apply to Ofgem for IAE Amend the Capacity Buyback incentive to include Capacity impacted by FM NGG bear 50% of cost, Community incur 50% of cost Mod 262 Rebate – NGG would have recovered through SO Commodity Industry support, workable but rejected by OFGEM, guidance on way forward

5 Capacity treatment subject to Force Majeure A number of options with different impacts and timings Just about meets urgent criteria (timing, materiality) –Expect NGG 750GWh/d capability to be tested during Q –Significant commercial impact (circa £0.5m / month) Critical that protection is available from October 2010 as this situation is now likely to be an enduring issue. UNC change then Licence change or apply in parallel? Best way forward? Informal workgroup meeting during w/c 8 th February to develop options. Urgency of Mod or other commercial solution?