Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Fire Tax Remains at.505 Mills 2013 Fire Tax Remains at.505 Mills 2014 Fire Tax Increases to.655 Mills Increase of.15 Mills on the Fire Tax ($15.
Proposed New Police Station Proposed New Police Station Article 4, 2007 Annual Town Meeting.
Baltimore, Maryland May 31, 2014 – June 4, 2014 Donald R. Austin Executive Fire Commissioner, Retired Detroit Fire Department.
Advertisement GFD Duties –Plan, coordinate, and direct all activities of the Department –Responsibility for the operation of all phases of the Department.
CITY OF YORK, PENNSYLVANIA DEPARTMENT OF FIRE/RESCUE SERVICES.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Ossining Ambulance District September Current Situation The Greater Ossining Community has enjoyed 24 hour emergency medical care and transport.
Presentation on Sustainable Fire Services.  The Problem:  Fire Department Operations are Unsustainable.  Two Things have changed:  Operations  Loss.
Fire & Emergency Services Administration Chapter 1 The Past.
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class April 9, 2008.
Wasatch County Fire Protection SSD Proposed Tax Increase.
FIRE DEPARTMENT ORGANIZATION State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Planning for the Future History of Apparatus City Incorporated 1999: All County apparatus associated with the Palm Coast Fire Department became the possession.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
“To respond to calls for service from the community with the goals of saving lives, property, and protecting the environment. We will provide a cost-effective.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
As developed by the Gilford Facilities Planning Committee.
CHAPTER 2 Copyright © 2007 Thomson Delmar Learning 2.1 Fire Department Organization, Command, and Control.
City of Leon Valley Town Hall Meeting. Background Since 1972, when the original City Hall was built, the City of Leon Valley has grown by over 8,900 residents.
CALAVERAS CONSOLIDATED FIRE Calaveras LAFCo Update July 20, 2015.
West Skagit Regional Fire Authority Planning Committee.
OPTION 2 - NO ADDITION CONCEPT PLAN ALTERATIONS TO THE HARTLEY DODGE MEMORIAL HOLT  MORGAN  RUSSELL ARCHITECTS FIRST FLOOR PLAN.
Overview The National Fire Fighter Near-Miss Reporting System is a voluntary, confidential, non-punitive and secure reporting system with the goal of.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
Strategic Plan December 10, 2008 CONTINUOUS IMPROVEMENT…CUSTOMER SERVICE.
25. Exeter Township Building Reading Hospital Building Exeter Ambulance Building Reading CC – 12 th Hole DeMoss Road Gibraltar Road Exeter Emergency Services.
FIRE RESCUE DEPARTMENT FY Budget Worksession July 21, 2009.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Facility Update Citizens Capital Budget Advisory Committee February 6, What is Medic? 2.How we use the space 3.Growing pains 4.What it means.
Dispatch – Summer Study Committee Long Term Recommendations –The Department of Public Safety should be provided funding to hire an outside consultant to.
Operating Budget Funding Sources State Appropriations - General Revenue Formula Funding, Special Items, Benefit Cost Sharing THECB Transfers TX Grant,
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
South Greenville Recreation Center and Park Master Plan.
Alice Baker Memorial Library Report to Town and Village Board March 2, 2016.
Board of Selectmen Meeting April 14, Outline  Overview of problems  Overview of original plan  Overview of new plan Highlights Cost Timeline.
Site & Building Assessment Study Conducted by: Caolo & Bieniek Associates, Inc. Fire Station Study Committee Report to Select Board September 18, 2006.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Evansville Fire Department Insurance Services Office (ISO) Findings.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Financial Savings for the (Town/Agency/etc. Name) Add Your Logo Here Prepared by (Department Name)
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
SPRING 2006 TOWN MEETING Bernard Lynch Town Manager April 27, 2006 Continued from April 24, 2006.
1 Fire & Emergency Services Committee Fire Master Plan Consolidation of Recommendations Implementation Plan – Part B August 2014 – Revised September 24,
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
OPA 15 – What is it? OPA 15 – “Hwy 400 Strategic Industrial Employment Area secondary plan” secondary plan prescribes the nature of development within.
Consolidated Central Office Building
Fall 2017 Update: Physical properties and sinking fund
Design A Healthy finished basement
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
TOWN OF CHESTER PROPOSED BUDGET
John Wood John Reed Mark Purple (Town Admin)
Town of Newbury Proposed New Fire Station
MIDLAND FIRE DEPARTMENT OPERATIONAL COVERAGE
Newbury Safety Services Facility June 2017 Public Forum
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Most incidents are small in nature, with a correspondingly small response organization, consisting of an IC and a handful of individual resources.
The Asset Management Journey for Building Assets
Charlton Fire District 2018 Budget
Financial Considerations
TUESDAY, APRIL 3rd.
WELCOME WELCOME.
Stoughton Public Library
Building Committee FIRE DEPT. MEMBERS
Presentation transcript:

Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg

Fire Station

Fire Department History Current station built in 1972 with additions in 1976 and 1999, all from fund raising and volunteer labor Current station built in 1972 with additions in 1976 and 1999, all from fund raising and volunteer labor Planning for expanded facility started in 2005 Planning for expanded facility started in and 2009 plans developed and construction costs estimated and 2009 plans developed and construction costs estimated. 2010/2011 plans refined and construction costs updated. 2010/2011 plans refined and construction costs updated.

Current Fire Department Area Fire Department currently in 3 areas: Fire Department currently in 3 areas: Fire Station 4,671 sq ft Old Fire Station 346 sq ft Rented Storage 300 sq ft 5,317 sq ft total

Need for Additional Fire Department Space Increased Call Volume/Demand for Services Increased Call Volume/Demand for Services Insurance Services Office (ISO) Public Protection Classification (Insurance Rating) Insurance Services Office (ISO) Public Protection Classification (Insurance Rating) Adequate Space for Training- Mutual Aid Adequate Space for Training- Mutual Aid Centralized Location of All Equipment & Apparatus Centralized Location of All Equipment & Apparatus More Energy Efficient Building More Energy Efficient Building EMT Quarters EMT Quarters Long-Term Facilities to Address Current and Future Needs- Adequate space for future apparatus (ladder truck and ambulance) Long-Term Facilities to Address Current and Future Needs- Adequate space for future apparatus (ladder truck and ambulance)

Police Department Area Police Department Currently in 2 Areas: Police Department Currently in 2 Areas: Police Station:1,300 sq ft Police Station:1,300 sq ft Old Fire Station 445 sq ft 1,745 sq ft Total 1,745 sq ft Total Note: Cruisers currently stored at Chief’s home

Existing Police Station Purchased in 2001 as interim Police Station, value of property recognized as proximity to Fire Station Purchased in 2001 as interim Police Station, value of property recognized as proximity to Fire Station Building consists of original section with 2 subsequent poorly constructed additions with serious foundation/settlement issues. Building consists of original section with 2 subsequent poorly constructed additions with serious foundation/settlement issues. Wet basement with constantly running sump pump. Wet basement with constantly running sump pump. Handicap accessible on first floor only. Handicap accessible on first floor only. Up to 4 officers can be on duty at any given time. Up to 4 officers can be on duty at any given time.

Need for Additional Police Department Space Provide Secure Facility (Processing, Detention and Storage) Provide Secure Facility (Processing, Detention and Storage) Centralized Location of All Equipment & Apparatus Centralized Location of All Equipment & Apparatus Adequate Office Space Adequate Office Space Adequate Interview/Conference Area Adequate Interview/Conference Area Long-Term Facilities to Address Current & Future Needs Long-Term Facilities to Address Current & Future Needs Adequate Training/Incident Command Area Adequate Training/Incident Command Area

Existing Police Station Uneven and Rolling Floors-First Floor

Existing Police Station Floor Settlement-Second Floor

Existing Police Station Office Space for up to 4 Officers

Existing Police Station Wet Basement with Dirt Floor

Existing Police Station Crumbling Foundation and Sill

Existing Police Station Second Floor Settlement

Existing Police Station Crumbling Garage Foundation

Existing Police Station Crumbling Garage Foundation

Existing Police Station

Lot 1 Committee Formed by Selectboard in 2010 to evaluate uses/designs for Lot 1 (all town owned property around Fire and Police stations) and make recommendation to Selectboard Formed by Selectboard in 2010 to evaluate uses/designs for Lot 1 (all town owned property around Fire and Police stations) and make recommendation to Selectboard Hired Broadleaf as consultants; they developed options reviewed by committee Hired Broadleaf as consultants; they developed options reviewed by committee Selected plan presented at public meeting Jan 2011 Selected plan presented at public meeting Jan 2011 Plan incorporated with proposed building Plan incorporated with proposed building

Lot 1 Plan