1 Transportable Array 9 th Annual Team Meeting TA Team Meeting La Jolla, CA Nov 9-10, 2015 Bob Busby TA Manager.

Slides:



Advertisements
Similar presentations
1 U.S. Department of the Interior U.S. Geological Survey Earthquake Monitoring and Reporting through the Advanced National Seismic System Briefing for.
Advertisements

Volcano Seismology & Infrasound Summary Breakout Group Report.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
U.S. Department of the Interior U.S. Geological Survey USGS Tsunami Activities 5 Year Review Craig Weaver David Oppenheimer May 16, 2007.
Mike Stickney Montana Bureau of Mines and Geology Earthquake Studies Office Montana Regional Seismograph Network ANSS IMW RAC 21 August 2006.
August 14, 2006 Seismic Monitoring in the Utah Region — Status and Needs Walter Arabasz.
29 deaths, destroyed infrastructure, and made permanent changes in Yellowstone geysers. $15M in damage (‘59 $) and $100M+ (2006 $)! Rupture of the 1959.
Презентація за розділом “Гумористичні твори”
Центр атестації педагогічних працівників 2014
Галактики і квазари.
Характеристика ІНДІЇ.
Процюк Н.В. вчитель початкових класів Боярської ЗОШ І – ІІІ ст №4
Walter Arabasz Regional Coordinator Aug. 15, 2006 Closure: Review of Desirable Outcomes of Meeting.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
1  Wisconsin Height Modernization Program (HMP) Update  WisDOT Survey Equipment Information  Central Office Survey Equipment Inventory Jacob J. Rockweiler,
The Indistar Network MOVING FORWARD. Members, Costs, Services  Members: State Education Agencies  Cost: $10,000 per year, unlimited districts, schools.
Facilitate – Collaborate – Educate CoCom April 9, 2012.
The following figures show three modeled measures of network capability 1) Minimum magnitude threshold 2) Network detection time 3) Earthquake Location.
CISN: C alifornia I ntegrated S eismic N etwork The Program Management Group (PMG): Tony Shakal – CGS David Oppenheimer – USGS Menlo Park Peggy Hellweg.
Tim Ahern The FDSN and IRIS GSN and PASSCAL “Networks”
A U.S. Sponsored Observing System of the Global Earth Observing System of Systems  Focus on the Network –Data Management –Products Global Seismographic.
CISN: C alifornia I ntegrated S eismic N etwork The Program Management Group (PMG): Doug Given – USGS Pasadena Egill Hauksson - Caltech Peggy Hellweg &
CoCom F2F meeting Chicago April 9-10, Expectations for April – 15 month Plan and Budget – Final budget to submit to BoD – Plan for.
The Australian National Seismic Network (ANSN)
PG&E and CISN: An Earthquake Country Partnership Stu Nishenko CISN Advisory & Steering Committees Meeting October 13, 2010 Sacramento CA.
Seismograph Networks in China: Present State and Development Program Yun-tai Chen, Gong-wei Zhou and Rui-feng Liu Institute of Geophysics China Earthquake.
Some Thoughts on IMW And Opportunity We represent a big area of the ANSS national program Bob Smith Univ. of Utah.
GSN Budget CoCom meeting Chicago April 9-10, 2012.
Духовні символи Голосіївського району
50 years of global seismology: USGS Albuquerque Seismological Lab.
Walter Arabasz Regional Coordinator Aug. 14, 2006 Goals & Desirable Outcomes of Meeting.
Tim Côté, Canadian National Seismic Network Jesus Perez, Mexican National Seismic Network Tim Ahern, Seismic Network Activity in the United States EarthCube.
1 Current Status of USArray and EarthScope Thanks to Bob Woodward USArray Director.
1 HPEC'02 Distributed Data Management Architecture for Embedded Computing The Problem: –Integrated real-time management of large, distributed, heterogeneous.
Veterans in Your Companies Future Unlocking Future Success APRIL 2014.
Catching Quakes in the Pacfic Northwest! Robert de Groot Director for Education, Experiential Learning & Career Advancement Southern California Earthquake.
TEC-P Partner Meeting January 6, AGENDA Performance & CoColo – Errors and corrections Reporting Updates February Meeting Agenda & Advisory Council.
Robotics Technology. What is the objective of this new course: To support and reinforce the content standards in Science, Technology, Engineering and.
DWR/O&M Earthquake Engineering Section FY2006 Update James D. Agnew, M.S. Senior Seismologist 17 Nov 2005.
USGS Tsunami Activities 5 Year Review
United States Coast Guard
CISN Steering and Advisory Committees
EPOS – ORFEUS Seismology Workshop Seismic Infrastructure in Spain:
Broadband Array in Taiwan for Seismology (BATS) Current Status
Проф. д-р Васил Цанов, Институт за икономически изследвания при БАН
ЗУТ ПРОЕКТ на Закон за изменение и допълнение на ЗУТ
О Б Щ И Н А С И Л И С Т Р А П р о е к т Б ю д ж е т г.
Електронни услуги на НАП
Боряна Георгиева – директор на
РАЙОНЕН СЪД - БУРГАС РАБОТНА СРЕЩА СЪС СЪДЕБНИТЕ ЗАСЕДАТЕЛИ ПРИ РАЙОНЕН СЪД – БУРГАС 21 ОКТОМВРИ 2016 г.
Сътрудничество между полицията и другите специалисти в България
Съобщение Ръководството на НУ “Христо Ботев“ – гр. Елин Пелин
НАЦИОНАЛНА АГЕНЦИЯ ЗА ПРИХОДИТЕ
ДОБРОВОЛЕН РЕЗЕРВ НА ВЪОРЪЖЕНИТЕ СИЛИ НА РЕПУБЛИКА БЪЛГАРИЯ
Съвременни софтуерни решения
ПО ПЧЕЛАРСТВО ЗА ТРИГОДИШНИЯ
от проучване на общественото мнение,
Васил Големански Ноември, 2006
Програма за развитие на селските райони
ОПЕРАТИВНА ПРОГРАМА “АДМИНИСТРАТИВЕН КАПАЦИТЕТ”
БАЛИСТИКА НА ТЯЛО ПРИ СВОБОДНО ПАДАНЕ В ЗЕМНАТА АТМОСФЕРА
МЕДИЦИНСКИ УНИВЕРСИТЕТ – ПЛЕВЕН
Стратегия за развитие на клъстера 2015
Моето наследствено призвание
Правна кантора “Джингов, Гугински, Кючуков & Величков”
Безопасност на движението
/ / / / / /27.
Murrayhill Recreation Association
Forth.
FDSN WG-1 FDSN Secretary to request updated station lists from members
Presentation transcript:

1 Transportable Array 9 th Annual Team Meeting TA Team Meeting La Jolla, CA Nov 9-10, 2015 Bob Busby TA Manager

TA Tasks 158 Stations 46 Stations, eventually Stations 20 Reference Stations, 20 EARN stations

Lower 48 Cascadia Stations, each with BB and SM, Pressure and Infrasound- ends 2015 Adoption of Equipment, Transfer of permits Training new operator 15 in Oregon, 5 in CA and 7 in WA CEUSN Stations, to 2017 EARN Stations, subscriber model Reference Net – 20 Stations, to 2019 Includes TUL1 and R11A upgrades 3

CEUSN See updates at: Stations operated by TA 115 with Broadband Sensors 43 with BB and Strong Motion 100 sps for BB and SM [200 sps for SM] 60 stations from ANSS, Refnet, GSN ~100 stations from Regional Networks 158 Stations Up to 2017: Supported by NSF With addon by USGS After 2017 ??? Engage DOE, NRC CEUSN WG

CEUSN See updates at: Lingering Tasks: Add (5) SM 200 SPS SM Event triggered Continuous Arkansas USGS Equipment Duplicate stations Budget: $7M replaced All the Sensors All the huts All the LiFePO4