AWAKE Technical Board, 19 August 2015 1 E. Gschwendtner, CERN.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
SPS Secondary Beam Experimental Areas Access System 7 September 2012.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Compressor status AWAKE Technical Board meeting 19 May 2015.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
AWAKE electron source New Electron Source WP at CERN
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Compressor status AWAKE Technical Board meeting 19 August 2015.
1 1. Some recent views ( ) 2 Linac tunnel
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Requirements for the Interlock System of the Phase1 beam line Janet Schmidt on behalf of CP3.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Update on the Laser Beam Line
Summary of Kick-Off Meeting: AWAKE Technical Board 9 April 2014 E. Gschwendtner, 11 April
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
News and hot topics Impedance meeting 14/04/2014.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN AWAKE Project Status. Outline Introduction Project organization West Area and CNGS AWAKE facility studies Required input from the Collaboration Summary.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Summary of the AWAKE Cost and Schedule Review Edda Gschwendtner, CERN Reviewers: Florian Sonnemann, CERN (chair); Ralph Assmann, DESY; Massimo Ferrario,
O. Kester, NuSTAR annual meeting, 27/02/2013
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
Crab Cavity Technical Coordination meeting:
Oleksiy Dolinskyy December 1st, 2014
East Area Renovation Project Team meeting # 2 – EDMS News
TE-EPC internal review of the ELENA project
EAAC, Isola d’Elba, September 2017, WG1
Equipment simplified model SMR UR safety
Plasma Wakefield Acceleration and a possible eP scattering Experiment MPP Retreat January 21, 2014 Allen Caldwell.
AWAKE proposals for BE/BI
The ELENA Safety Documentation «time to prepare the safety clearance»
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
EP Experiments safety validation process Safety Permits
LCLS Injector: Introduction D. H
Experimental Areas – LS2 planning
Powering and Safety day Underground access during powering tests
Review of hardware commissioning
SPS Injection BIS - Draft requirements
Presentation transcript:

AWAKE Technical Board, 19 August E. Gschwendtner, CERN

News Welcome Florence Friebel  fellow in laser beam line Coordination Package Gennady Plyushchev  Project Associate at CERN, plasma simulations First discussion with Frederic Bordry on setting up the Steering Board 2

Follow-Up of Last TB Risk analysis ongoing ! – Plasma cell: oil and rubidium – Electron source: oil handling RF specifications for laser system to Menlo: – Done, waiting for comments from Menlo Compressor has been ordered. Plasma cell: – Tests in EHN1 done! – Plasma cell end flange design ongoing Electron spectrometer system: – Test of optical system – Test of screens 3  see Patric’s talks today  See Stefano/Lawrence’ talks today

Follow-Up of Last TB Interlock – General: interlock team work on this – Laser: Valentine, Josh to find a solution how it can be clearly defined in which power mode the laser system is. – BTV screens: the proton beam line  to be confirmed! 4

AWAKE EDMS, WPs 5

WP/Engineering Specifications 6 WorkpackageWork-Package Documents EDMS link to document 1SPS Beams 2RF Synchr 3e- sourcehttps://edms.cern.ch/document/ /1 4p linehttps://edms.cern.ch/document/ /1 5e-linehttps://edms.cern.ch/document/ /1 6Shieldinghttps://edms.cern.ch/document/ /0.1 7Laser BeamLine and Clean room 8SMI Measurementhttps://edms.cern.ch/document/ /1 9Secondary Beamlinehttps://edms.cern.ch/document/ /1 10Plasmas Simulationshttps://edms.cern.ch/document/ /1 11Magnets 12Power Converters 13Vacuumhttps://edms.cern.ch/document/ /1 14.1BI.BPM 14.2BI.BTVhttps://edms.cern.ch/document/ /0.0; BI.BCT 14.4BI.BLM 15.1Beam Interlockhttps://edms.cern.ch/document/ / Magnet Interlockhttps://edms.cern.ch/document/ /1 16Mechanical Design 17Civil engineeringhttps://edms.cern.ch/document/ /1 18Cooling and Venthttps://edms.cern.ch/document/ / Electrical Serviceshttps://edms.cern.ch/document/ /1 19.2Cablinghttps://edms.cern.ch/document/ /1 20Transp+Handling 21Access 22Fire+Gashttps://edms.cern.ch/document/ /1 23Surveyhttps://edms.cern.ch/document/ /1 24Ethernet 25Control 26.1RP Monitoringhttps://edms.cern.ch/document/ /1 26.2RP Simulationshttps://edms.cern.ch/document/ /1 Institute's WPs I1Plasma Cellhttps://edms.cern.ch/document/ /1 I2SMI Diagnosticshttps://edms.cern.ch/document/ /1; I3Laserhttps://edms.cern.ch/document/ /1 I4Electron Spectrometerhttps://edms.cern.ch/document/ /0.5 I5DAQ(Who writes?) I6Accelerating Structurehttps://edms.cern.ch/document/ /1 I7Electron Line Diagnostics TRIUMFhttps://edms.cern.ch/document/ /1 I8Laser Dumphttps://edms.cern.ch/document/ /2

Document Release Procedure 7

WP/Engineering Specifications 8 Owner/main author of the WP send the document for engineering check to check list! (Deadline: now!) Include all comments. (Deadline: end of August) Then ready to send out for approval. (Beginning of September)  For questions, please ask Marlene!

Next Meetings Next TB/PEB: 28/30 September 2015 (Collaboration Meeting at CERN) 4/5 November /10 December