News Welcome Florence Friebel fellow in laser beam line Coordination Package Gennady Plyushchev Project Associate at CERN, plasma simulations First discussion with Frederic Bordry on setting up the Steering Board 2
Follow-Up of Last TB Risk analysis ongoing ! – Plasma cell: oil and rubidium – Electron source: oil handling RF specifications for laser system to Menlo: – Done, waiting for comments from Menlo Compressor has been ordered. Plasma cell: – Tests in EHN1 done! – Plasma cell end flange design ongoing Electron spectrometer system: – Test of optical system – Test of screens 3 see Patric’s talks today See Stefano/Lawrence’ talks today
Follow-Up of Last TB Interlock – General: interlock team work on this – Laser: Valentine, Josh to find a solution how it can be clearly defined in which power mode the laser system is. – BTV screens: the proton beam line to be confirmed! 4
AWAKE EDMS, WPs 5
WP/Engineering Specifications 6 WorkpackageWork-Package Documents EDMS link to document 1SPS Beams 2RF Synchr 3e- sourcehttps://edms.cern.ch/document/ /1 4p linehttps://edms.cern.ch/document/ /1 5e-linehttps://edms.cern.ch/document/ /1 6Shieldinghttps://edms.cern.ch/document/ /0.1 7Laser BeamLine and Clean room 8SMI Measurementhttps://edms.cern.ch/document/ /1 9Secondary Beamlinehttps://edms.cern.ch/document/ /1 10Plasmas Simulationshttps://edms.cern.ch/document/ /1 11Magnets 12Power Converters 13Vacuumhttps://edms.cern.ch/document/ /1 14.1BI.BPM 14.2BI.BTVhttps://edms.cern.ch/document/ /0.0; BI.BCT 14.4BI.BLM 15.1Beam Interlockhttps://edms.cern.ch/document/ / Magnet Interlockhttps://edms.cern.ch/document/ /1 16Mechanical Design 17Civil engineeringhttps://edms.cern.ch/document/ /1 18Cooling and Venthttps://edms.cern.ch/document/ / Electrical Serviceshttps://edms.cern.ch/document/ /1 19.2Cablinghttps://edms.cern.ch/document/ /1 20Transp+Handling 21Access 22Fire+Gashttps://edms.cern.ch/document/ /1 23Surveyhttps://edms.cern.ch/document/ /1 24Ethernet 25Control 26.1RP Monitoringhttps://edms.cern.ch/document/ /1 26.2RP Simulationshttps://edms.cern.ch/document/ /1 Institute's WPs I1Plasma Cellhttps://edms.cern.ch/document/ /1 I2SMI Diagnosticshttps://edms.cern.ch/document/ /1; I3Laserhttps://edms.cern.ch/document/ /1 I4Electron Spectrometerhttps://edms.cern.ch/document/ /0.5 I5DAQ(Who writes?) I6Accelerating Structurehttps://edms.cern.ch/document/ /1 I7Electron Line Diagnostics TRIUMFhttps://edms.cern.ch/document/ /1 I8Laser Dumphttps://edms.cern.ch/document/ /2
Document Release Procedure 7
WP/Engineering Specifications 8 Owner/main author of the WP send the document for engineering check to check list! (Deadline: now!) Include all comments. (Deadline: end of August) Then ready to send out for approval. (Beginning of September) For questions, please ask Marlene!
Next Meetings Next TB/PEB: 28/30 September 2015 (Collaboration Meeting at CERN) 4/5 November /10 December