02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August 2006 1 LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.

Slides:



Advertisements
Similar presentations
Study of the Central Tracker for Huge Detector at the Linear Collider Takashi Watanabe Kogakuin University The 7th ACFA Workshop on Physics & Detector.
Advertisements

Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
D. Peterson, “Gaseous Tracking”, Review of US Program for Detector R&D for the ILC, Argonne Nat. Lab., Gaseous Tracking Daniel Peterson, Cornell.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
UTA, Jan. 9-11, 2003M. Ronan LC-TPC R&D1 LC-TPC R&D GEM, MicroMEGAS and MWPC techniquesGEM, MicroMEGAS and MWPC techniques Preliminary studiesPreliminary.
Linear Collider TPC R&D in Canada Madhu Dixit Carleton University.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
Marseille – January 17 th, TPCs for High Energy Physics David Attié Max Chefdeville,Paul Colas, Arnaud Giganon, Marco Zito,
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Large prototype goals Endplate design P. Colas. General ideas We have to agree first on the goals to understand how to build the endplate We have to agree.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
23/08/2005 Ron Settles MPI-Munich/DESY Snowmass2005 TPC Large Prototype1 TPC R&D, Tasks towards the Design of the ILC TPC LC TPC R&D Groups OUTLINE of.
Development of a TPC for the Future Linear Collider on behalf of the LC TPC groups Aachen, Berkeley, Carleton, Cracow, DESY, Hamburg, Karlsruhe, MIT, Montreal,
Micromegas TPC Beam Test Result H.Kuroiwa (Hiroshima Univ.) Collaboration with Saclay, Orsay, Carlton, MPI, DESY, MSU, KEK, Tsukuba U, TUAT, Kogakuin U,
17 October 2003TPC ALEPH TPC Ron Settles, MPI-Munich/DESY1 The Aleph Time Projection Chamber Ron Settles, MPI-Munich/DESY TPC
ILC TPC resolution studies with charge dispersion in MPGDs with a resistive anode Madhu Dixit Carleton University & TRIUMF IPNS KEK 14/05/2005.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
25/10/2006Ron Settles MPI-Munich/DESY 12th WP phonemeeting 25 October LCTPC/LPWP-12th phonemeeting –Date 25 October 2006 –Time 7:00 west coast 10:00.
LC TPC R&D Results May Selected LC TPC R&D Results for the DESY RPC Meeting 2003 May 07 The LC TPC R&D Groups of the PRC R&D-01/03 Proposal Carleton,
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
07/03/2008 Ron Settles MPI-Munich TPC B-field1 On the Magnetic-field Requirements for the LC TPC OUTLINE of TALK Status of Discussion.
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
Result of MWPC-TPC beam test ILC Detector Workshop 3-5 March 2005, KEK Osamu Nitoh, TUAT.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
19 Jan Ron Settles MPI-Munich LCTPC advanced-endcap for the ILD- LOI1 ILD Logo goes here Iteration on LCTPC “advanced-endcap” for the ILD LOI…
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Ron Settles MPI-Munich LCTPC integration model
Toward the final design of a TPC for the ILD detector
OUTLINE of TALK Overview of the question Framework, TPC R&D status
WP-conveners 3rd phone meeting
OUTLINE of TALK Overview Motivation, LC-TPC R&D Status
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
Presentation transcript:

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan – To join, Phone code 52872#

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August Agenda for 6th WP phonemeeting AGENDA -1.News Formation of the LCTPC/LP Collaboration WWS-R&D-panel tracking review at Beijing -2.WP meeting LCTPC/LP goals (RS) LP status (whoever is ready) -3.Future meetings -4.AOB

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -1a.Formation of the LCTPC/LP collaboration If your group has not yet sent us the name of your CB representative (Jan’s terminology), please do so a.s.a.p. I will circulate the list of names as soon as it is complete.  Here are the groups who have replied up to now: marked by 

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LP Groups (09 August 06) Americas  Carleton   Montreal   Victoria   Cornell   Indiana   LBNL  MIT Purdue YaleEurope LAL Orsay  IPN Orsay Saclay Aachen  Bonn  DESY  UHamburg  Freiburg  Karlsruhe MPI-Munich  Rostock Siegen  NIKHEF  UMM Krakow Bucharest Novosibirsk  PNPI StPetersburg Lund  CERN  Asia Tsinghua  CDC: Hiroshima  KEK  Kinki U  Saga  Kogakuin  Tokyo UA&T  U Tokyo  U Tsukuba  Minadano SU-IIT  …Other groups interested?

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -1b.Tracking review at Beijing: As announced at the VLSW06, the WWS-R&D Panel is starting regular reviews of the different R&D projects for the LC detector. Chris Damerell informed me they want to start with tracking (Si and TPC) at the Asian LC meeting in Beijing (February 2007). First ideas are to submit a report (presumably an update of the May2006-PRC report will be appropriate), give a presentation at an open session and have short overviews from each country (including finances/manpower) at a closed session.

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -2a.Next iteration on the goals for LCTPC. Takeshi asked to list an overview with both LP and SP R&D possibilities. Here is a preliminary version of the items shown at VLCW06 + feedback from Dan; first the general idea: : SP (small prototype) tests, LP1 –> two endplates: Gem+pixel, Microm.+pixel : LP2 -> real LCTPC prototype endplate: Gem or Mm + carbon-fibre sandwich, gating grid, sector/panel shape, LCTPC electronics, gas, etc

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August TPC R&D breakdown (prel.) Gem, Micromegas, Pixel Large, small, odd-shaped panels Endplate alignment and stability Fieldcage Sandwich structure SP/LP2 Gating/max. space charge SP/LP2 ion feedback rate Point/2-track resolution Momentum meas. in inhomog. B-field dE/dx measurement Gas studies SP Pad shapes SimulationLP1,LP2 Jet environment Beams 1-6 GeV/c electrons 1-20 GeV/c hadrons (+dE/dx) SP, 100 GeV hadrons (+jets) SP,

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -2b.Electronics ideas (Leif,Luciano) Reminder: for Eudet 1000 altro channels available /2007 From last meeting, drawing from Leif of connector:

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -2c.Electronics ideas (Madhu) From last meeting, Madhu proposes for the LCTPC electronics: -preamp 25ns Trise (10%-90%) -no shaper-integrator -25MHz 10to12-bit FADC (2-track resolution can benefit from the somewhat faster Trise if the noise is still acceptable) To the electronics experts: please comment!

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -2d.Ideas for the endplate Reminder: most urgent point for LP is to design layout of endplate and finalize ~12/2006 Nothing new this meeting.

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -3.Future meetings - At Vancouver, it was decided that a phonemeeting every 2 weeks is the right frequency for now. After Vancouver there are (in addition to phonemeetings): -Paris Endcap meeting organized by Paul/Akira (12-15 September 2006) -Eudet annual meeting MPI-Munich (18-20 October 2006) -European LC workshop Valencia (6-10 November 2006) -Asian LC workshop Beijing (February 2007)

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -4.AOB

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August Back up slides, for reference Back up slides, for reference

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -1a.Formation of the LCTPC/LP collaboration Dean, Takeshi and RS have started working on this. First ideas: –1)Three coordinators, one chosen by each region. These spokespersons (SP) would coordinate the work of the following two boards: –2)The collaboration board (CB), consisting of the principle investigator (the group leader or other chosen member) from each group. Each CB member would take care of the resources for its group (money and people). –3)The technical board (TB), consisting of the existing workpackage (WP) conveners. The TB will ensure the technical integrity of their WP and compatibility with other WPs while maintaining close contact with the rest of the collaboration.

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August AGENDA -1b.Formation of the LCTPC/LP collaboration The SP will ensure that the coordination between the CB and TB is efficient and the work is carried out in a timely fashion. We also discussed that the CB and TB may each appoint an a kind of executive committee to steer the work, since this is a job more efficiently done with a small number of people. Details on the exact structure and how the steering is to be done still have to be worked out (feedback is welcome), but first: The interim-SP and the TB exist. A preliminary from of the CB is the groupleader’s mailing list which evolved during the last couple of years. For this organizational work, we need a more official list of names, which was the subject of our 12 July . Somewhat more than half have replied, so we need to get the rest in order to proceed. As soon as the full CB is known, we can start exchanging ideas between the SP, CB and TB.

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August Akira Sugiyama – GLD DOD

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August RS study - LDC DOD - together with Joel Pouthas Philippe Rosier (IPN Orsay)

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August Aleph Endplate

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August Some features Zigzag structure prevented loss of tracks > θ~22° Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. Alu sandwich structure stiff, lightweight to - contain 7mb overpressure - provide forced-air thermal insulation between electronics and TPC volume Water cooling of 1kW electronics/side in addition - 22K channels per side Combination water/air cooling blocked all heat to TPC Overall thickness ~ 25%Xo (average) w/o cables Bending of endplate -20 micrometers due to 7mb overpressure - 5 micrometers due to wire tension

02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August R&D Planning 1) Demonstration phase –Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase –Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. 3) Design phase –After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started.