Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008 Integration close Safe operation OK Grounding Tolerable Firmware Needs to.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Marzo 2004Flavio Dal Corso INFN-Pd1 Results from May 2003 Test Beam First test of all the electronics integrated in a MB1 Minicrate Items tested: Hardware.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Computing and LHCb Raja Nandakumar. The LHCb experiment  Universe is made of matter  Still not clear why  Andrei Sakharov’s theory of cp-violation.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Muon System Safety Issues Burkhard Schmidt.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Integration of Forward Detectors, ZDC, and CASTOR into CMS Experiments Kevin Reynolds Michael Murray, Mentor David d'Enterria, Co-mentor 2006 Michigan.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ZDC Status A.Mestvirishvili Iowa. Quite while we had some problems with ZDC, QIE saturations, Reflections, Noise etc. To improve the situation several.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Aug 4, 2005 Hcal sx5 status/issues. overview CCM temperature readout DAQs for sx5hcal HCAL installation status SATOCRICH.
Detector status and commissioning: LUCID
HF Test station at P5 A.Mestvirishvili.
Injectors BLM system: PS Ring installation at EYETS
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
CMS Preshower: Startup procedures: Reconstruction & calibration
Level 1 (Calo) Databases
DT Infrastructure: LV, HV, Gas
07/07/2014 * status, all * AccTest framework
LHC LUMINOSITY (RATE) MONITORS
Presentation transcript:

Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008 Integration close Safe operation OK Grounding Tolerable Firmware Needs to be tested Luminosity After HF Software Started but lots to do Lift fixture Working on final design

ZDC HiVolt Vertex LVDS GT Laser QIECCM RBX manager S2E13 Lumi Server S2C07 S2F18 DQM Tunnel LHC Integration HV LoVolt S4F02 DCS signal DSS RecHits 141ns - HTR Map HLX DCC E+,E- GCT Timing S2F07 S1E04 LUT

Safe Operation After “technical inspection” in August we have covered all action items except for “High Voltage” signs in tunnel. In addition we will install a safety ground between ZDC and TAN based on zener diodes. This will be done during shutdown. Alain Cordonnier has installed DSS interlocks for low and high voltage. Michael has submitted some procedures to Archana Cables have official numbers that are listed in database

Grounding Layout was designed to minimize radiation load –Signal and HV cables connect S2E13 and tunnel We had a “coffee meeting” with Laza, Magnus et al Magnus would prefer that we not get HV and LV from S24F02 but rather keep everything at S2E13 We would like to work on this over the winter shutdown. In the meantime Michael can write a simple procedure for disconnecting the ZDC if it is thought to be contaminating other detectors.

Firmware Drew Barden and John Jones have written firmware to great E+, E-, Multiplicity+ - and coincidence of + and - for Lumi –This still needs to be tested. We still need LUTs to linearize ZDC based on parameters used in test beam. –Michael has started talking with Greg Landsberg and Gena Kukartsev and will try to finish this week

Luminosity ZDC E+ and E- should now be available to server. Testing can start once Lumi group feels that the rest of the system is under control Oleg Grachov will work with Princeton group on this when he comes in October. ZDC, like HF, will be incorporated into lumi function manager so that it can be continuously providing lumi data.

Software From Cruzet4 Mayda, Steve found significant noise ~ 1-2GeV on pedestal. This is comparable to that seen in test beam. It is not from splitter box but probably from pickup on 208m of cable. For beam splash events near ZDC, 10m!, was saturated but far one 290m from collimator saw nothing. Urgent need now to set timing of ZDC wrt beam clock –We could start with dead reckoning and also look on scope. Jason StJohn setting up ZDC DQM framework, Alexi Mestvirishvili will be looking at data We are requesting that raw data also be stored offline We need help on defining offline packages to make ZDC physics objects.

Lift Fixture Paul Debbins is finalizing design. We hope to have make a presentation to Austin & TS group early October. We will also have to lift out BRAN. Sarchophagus will be mostly marble. Aiming to have this in for February.