RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.

Slides:



Advertisements
Similar presentations
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Section L – Maintenance and Operational Planning A Presentation to the Transmission Workstream – November 2005 Steve Gordon, ScottishPower Energy.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Operating Margins UNC Sub Group Tuesday 4 th November 2008.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
National Grid: Gas Transmission System Operator
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Flow Flexibility Capacity Joint Office 7 th December 2006.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Review Group -140 Thoughts on additional information requirements.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Entry Capacity Overrun price calculation
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
SO Incentives from April 2010
MOD Flow Swap Scenario’s – Initial Thoughts
Transmission Workgroup June 7th 2012
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Stefan Leedham Transmission Workstream 2nd November 2006
195AV “Future work” – system flexibility
Exit Overruns in the Enduring Regime
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management incentive schemes

Introduction  Purpose of these examples is to show how the decisions regarding managing constraints on the system would be affected by adopting NGG’s proposed combined scheme for constraint management compared with the current arrangements  NGG proposed that sharing factors should be equal to the RIIO-T1 efficiency rate applied in the totex incentive mechanism  The examples include “NGG cost” and “Shipper cost” where “Shipper cost” relates to the generality of Users, rather than a specific User  These examples are for illustrative purposes only (i.e. the costs indicated are entirely fictional) and assume that the actions each have the same effect on the system (i.e. there is no consideration that some actions be more effective than others)  Note that the resultant costs/revenues (after application of the sharing factor) would be subject to the appropriate cap/collar 2

Example 1 3 Bi-directional site (Storage) (not entering or withdrawing) System Exit Point (CCGT) OptionAction cost NGG exposure NGG cost Shipper cost NGG exposure NGG cost Shipper cost 1Locational buy at Storage, balanced by locational sell elsewhere £100k (net cost) 50%£50k 45%£45k£55k 2Buy back capacity rights at CCGT £70k100%£70k-45%£31.5k£38.5k 3Locational buy at Entry Point, balanced by locational sell elsewhere £150k (net cost) 50%£75k 45%£67.5k£82.5k Proposed arrangements Current arrangements NGG incentivised by lowest NGG cost System Entry Point Low pressure Shipper cost reduced under proposed arrangements

Example 2 4 System Entry Point System Exit Point (DN Offtake) High pressure OptionAction cost NGG exposure NGG cost Shipper cost NGG exposure NGG cost Shipper cost 1Buy back capacity rights at Entry Point £50k50%£25k 45%£22.5k£27.5k 2Turn up demand at CCGT £60k100%£60k-45%£27k£33k 3Offtake Flow Reduction £30k100%£30k-45%£13.5k£16.5k 4Flow swap from this DN Offtake to another Not available in this example Proposed arrangements Current arrangements NGG incentivised by lowest NGG cost Shipper cost reduced under proposed arrangements System Exit Point (CCGT)

Example 3 5 System Entry Point High pressure OptionAction cost NGG exposure NGG cost Shipper cost NGG exposure NGG cost Shipper cost 1Buy back capacity rights at Entry Point £50k50%£25k 45%£22.5k£27.5k 2Buy back capacity rights at Interconnector £40k50%£20k 45%£18k£22k 3Locational sell at Interconnector (no related buy as NTS is long) £20k revenue 50% £10k revenue 45% £9k revenue £11k revenue 4Flow swap to this DN Offtake from another -50%--45%-- Proposed arrangements Current arrangements NGG incentivised by lowest NGG cost / highest revenue NTS is long (over-supplied) Shipper revenue increased under proposed arrangements System Exit Point (DN Offtake) Bi-directional site (Interconnector)

Example 4 6 Low pressure OptionAction cost NGG exposure NGG cost Shipper cost NGG exposure NGG cost Shipper cost 1Locational buy at Entry Point, balanced by locational sell elsewhere £50k (net cost) 50%£25k 45%£22.5k£27.5k 2Buy back capacity rights at CCGT £100k * 0% Flow swap from this DN Offtake to another Not available in this example Proposed arrangements Current arrangements System Entry Point System Exit Point over-running (DN Offtake) Shipper cost unchanged under proposed arrangements System Exit Point (CCGT) * Note all costs associated with Exit actions to manage a constraint caused by the over-running user are passed to that over-running user (TPD J7.4) hence are not borne by the generality of shippers NGG incentivised by lowest NGG cost

Example 5 7 Low pressure OptionAction cost NGG exposure NGG cost Shipper cost NGG exposure NGG cost Shipper cost 1Locational buy at Entry Point, balanced by locational sell elsewhere £50k (net cost) 50%£25k 45%£22.5k£27.5k 2Buy back capacity rights at CCGT £100k *100%£100k-45%£45k£55k 3Flow swap from this DN Offtake to another Not available in this example Proposed arrangements Current arrangements System Entry Point System Exit Point (DN Offtake) Shipper cost increased under proposed arrangements System Exit Point (CCGT) NGG incentivised by lowest NGG cost * Note the change from Example 4 is that there is no over-running user and therefore costs are not entirely borne by a particular shipper