Myanmar: Toward Universal Access to Electricity by 2030 - Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.

Slides:



Advertisements
Similar presentations
U Khin Maung Win Director General, Department of Electric Power
Advertisements

UK-Malawi Trade & Investment Forum March 20, 2013 Energy Sector Perspectives Rob Mills World Bank.
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS 1 Reflections on Achieving Universal Access to Electricity in Myanmar Q1:
A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS Nay Pyi Taw, Myanmar November 22, Development of Myanmar National.
National Electrification Planning for Myanmar (NEP):
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
The Renewable Energy Development in Cambodia
Climate Change and Energy Access in Island States -
Somin Mukherji Senior Financial Analyst ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Electrification for Rural Yemen Rural.
National Electrification Program Investment Prospectus (2015–2019) Draft Final Results Alex Sundakov, September 2014.
Hydropower Development: Experience of Nepal
Cambodian Energy Sector Development Ministry of Industry, Mines and Energy Vietnam, Ho Chi Minh, 11 November, 2011 Greater Mekong Subregion Fifth Meeting.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS Electrification Planning and Technology Options: the Case of Latin America.
Outline of JICA’s Assistance prepared for
Rural Electricity Access by MOLFRD
International Cooperation in China’s Poverty Reduction Jiang Xiaohua Director General Foreign Capital Project Management Center Of LGOP October 19, 2007.
A Bridge to Universal Energy Access
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 11 Renewable Energy Module 11: DISTRIBUTED GENERATION: OPTIONS AND APPROACHES.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
ADDRESSING CHALLENGES FOR GREEN ENERGY AND CARBON MARKET DEVELOPMENT Presented to The High Level Workshop on Public Private Partnerships Implementation.
Environment and Energy Htun Paw Oo 1 June Content Environment and Energy Ecosystem services The role of energy Myanmar energy context Way forward.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
E8-GEF-UNDESA-UNESCAP Financing Sustainable Electrification South-East Asia Dialogues Bangkok, Thailand, September 8-10, 2009 Pro-Poor Public-Private Partnership.
Implementation Road Map for National Electrification Program Draft Final Recommendations Alex Sundakov, September 2014.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS Nay Pyi Taw March 20, Development of Myanmar National Electrification.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
OPPORTUNITIES AND CHALLENGES OF POLICY AND REGULATORY REFORMS IN THE POWER SECTOR IN UGANDA (Cogeneration Development and the Private Forestry Sector Participation.
Workshop for EUEI Facilitation and Policy Dialogue By Ghirmai Abraham (PhD), Ministry of National Development and Semereab Habtetsion (PhD) Department.
Road Map and Investment Financing Prospectus Peter Hoogland, November
Institutional Structures and Processes for High-Quality, Scaled Implementation Mini-hydro power for energy access Oliver J. Haas.
The NEP Workshop on Off-Grid Electrification in Myanmar Nay Pyi Taw, January 2015 South-South Cooperation to Power Rural Communities through Renewable.
Institutional Framework for Implementing Myanmar’s NEP Interim Options and Recommendations Alex Sundakov, March 2014.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Rural Electrification Access by Department of Rural Development
Financing Energy Access: The GEF Experience Dimitrios Zevgolis, Climate Change Specialist Global Environment Facility.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
ESCAP’S Pro-Poor Public-Private Partnership (5P) Approach Presented by: Mr. Kohji Iwakami, Economic Affairs Officer, EDD, ESCAP.
1 Introduction on GEOSIM© Vientiane 03 April 2007 Denis RAMBAUD-MEASSON, IED Capacity & Institutional strengthening for rural electrification & development.
Jie Tang Lead Energy Specialist South Asia Region, The World Bank
Missionary Electrification in the Philippines
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Developing a Philippine Water Supply Roadmap an IWRM Approach by Ramon Alikpala Executive Director National Water Resources Board November 2007 by Ramon.
Presented By: Dr. Thi Thi Soe Deputy Director
Global Environment Facility Climate Change 14 May 2004 Siv Tokle GEF Monitoring and Evaluation Unit.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
REDUCING POVERTY AND ENHANCING ACCESS TO RESOURCES MAY 24, 2010 Best Practices for World Bank Energy Investment in Central Asia.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
VANUATU Renewables Readiness Assessment Report November 2015.
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
Indonesia NEP - Least cost electrification investment plan coordinated grid & off-grid access rollout, technology choice Prepare a least-cost electrification.
Energy and Environment Partnership with the Mekong Region Dr. Ludovic LACROSSE EEP Mekong Chief Technical Advisor Vietnam-Finland Aid for Trade Forum Hanoi,
Technology Options & Cost of Increasing Access to Electricity in Taraba State, Nigeria Uduak Akpan +, Salisu Isihak, and Sanusi Ohiare
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
CURRENT STATUS - ENERGY TRANSITION
Off-grid Electrification Department of Rural Development
Engaging the private sector
Highlights of the Ethiopian Energy Sector
Critical Review of the Malawi Community Energy Model
Conditions for viability of minigrids
Arun P Sanghvi Naypyidaw May 31 – June 1, 2013
Presentation transcript:

Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015

Roadmap to Achieve Universal Access by National Electrification Rate 30% 50% 75% 100%

20 Note: This map shows all settlement points the same size (regardless of population), overstating electrification with non-grid options (mini-grid and off-grid / solar home systems) Least-cost recommendation for By 2030, the majority are grid connections This represents 7.2 million households Total cost is estimated at US $5.8 billion (US$800 per connection, average) This is additional to investments needed for generation & transmission

More than 1.3 million HH will not get grid access in the next 10 years and are recommended for pre-electrification (purple dots) Shan, Chin, Kayah and Kachin States represent major areas for pre-electrification Appropriate pre-electrification technology depends on village size, including solar, minihydro, renewable and diesel hybrids, biomass, etc. 14 Recommendations for off-grid pre-electrification

A Bridge to a Sustainable Energy Future A B RIDGE TO U NIVERSAL E NERGY A CCESS 5 Myanmar National Electrification Plan (NEP) Serves as comprehensive action plan for developing, financing, and implementing electricity access scale-up program nationwide, with the target of achieving universal access by Aligns support from different stakeholders to implement national access targets and syndicate financing on a timely, ongoing and programmatic basis.

35kW 200 HH Private own 200W 1 HH

300kW > 2000 HHs ESE owned Mechanical power For small industry Private owned

Distribution line 300VA voltage stabilizer

A B RIDGE TO U NIVERSAL E NERGY A CCESS 9 Strengths - Local manufacture and engineering expertise - Villagers willing to pay/invest - Community driven Minihydro in Myanmar: SWOT Weaknesses -Inefficient, substandard technology -Unreliable power supply -Lack of national policy and regulations Opportunities -Very large hydro power potential -Proven technologies and business models in other developing countries -Readily available financial and technical assistance support Threats -Competing water uses -limited potential in some villages which may not be adequate to electrify the whole village -Seasonal and annual variation

From Plan To Action

A B RIDGE TO U NIVERSAL E NERGY A CCESS 11 - WB is committed to provide $400 million to help increase access to electricity in Myanmar - Expected outcomes include: New household connections in urban and rural areas Coordinated, sector-wide institutional framework for electrification Strengthened institutional capacity of implementing agencies National Electrification Project: Objectives

A B RIDGE TO U NIVERSAL E NERGY A CCESS 12 - Component 1: Grid rollout (US$ 300 million) - Component 2: Off-grid electrification (IDA US$ 80 million) - Component 3: Capacity building and technical assistance (US$ 20 million) - Component 4: Contingent Emergency Response (US$ 0 million) National Electrification Project: Proposed Components

A B RIDGE TO U NIVERSAL E NERGY A CCESS 13 Project Preparation Schedule MilestoneDate World Bank approves project conceptOctober 2014 World Bank appraises projectJune 2015 Parliament approves project requestAugust 2015 Government and World Bank negotiate project termsAugust 2015 World Bank Board of Directors approves projectSeptember 2015 Project implementation beginsOctober 2015

A B RIDGE TO U NIVERSAL E NERGY A CCESS 14 Bottom-up Approach Viable Needs further investigation Screening by PMO (union level) SHS Not viable Feasibility study Projects identified by developers List of Mini- grid project proposals Projects identified by DRD Pre-feasibility study Viable PMO evaluation Not viable Mini-grid construction & commissioning Input from VECs Project proposals Input from VECs

A B RIDGE TO U NIVERSAL E NERGY A CCESS 15 Principled, Evolving Process for Scale-up Basic principles: - The village is not among those listed for early phases of grid extension; - The village has not received SHS for more than 40% of village households from a prior DRD program; -The village appears able and willing to pay electricity tariffs; - The village has productive uses – more than household lighting; - The village has promising demographic characteristics: at least 50 households and clustered homes; - There are strong indications of community’s ability to work together; - Demonstrated renewable resource potential: year-round hydropower resource, plentiful source of agro-waste for biomass, solar resource, etc.

A B RIDGE TO U NIVERSAL E NERGY A CCESS 16 Principled, Evolving Process for Scale-up (continued) - DRD/NEP support includes:  Grant support for pre-feasibility and feasibility studies on a cost-sharing basis  Grant support for business plan development  Capacity building and training for DRD, local technical advisors, VECs, private companies, financial institutions  Partial grant support for construction and commissioning - DRD/NEP maintains a participatory and open process which is subject to continuous adjustments.

A B RIDGE TO U NIVERSAL E NERGY A CCESS 17 World Bank Engagement in Myanmar: NEP reports and project materials can be found at: Achieving_Universal_Access_to_Electricity_in_Myanmar Discussions and Q&As