BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

BE/CO Changes in LS1 to the Software Development Infrastructure and Widely Used Libraries Chris Roderick, Greg Kruk, Katarina Sigerud, Luigi Gallerani,
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
SPS New Wire Scanner Mechanics Review
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
BE-BI camera projects HS, SB, EB March outline New digital cameras New rad-hard cameras (vidicon replacement)
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Roles Committees Meetings
BI-TB on BST Systems Introduction (L. Jensen) Hardware for SPS/LHC masters and receivers (old and new) (JJ. Savioz) Software for masters and receivers.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Post ACCOR until LS2: End of Life for CMW products CO3 meeting, 25th June 2015 Wojciech Sliwinski for the BE-CO Middleware team.
CERN IT Department CH-1211 Geneva 23 Switzerland t WLCG Operation Coordination Luca Canali (for IT-DB) Oracle Upgrades.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Industrial Control Engineering ADE Rapid Application Development Environment.
JIRA in BE-CO for Exploitation Marine BI Seminar 20 November
Feedback on Controls from 2015 Operation Marine Pace, on behalf of BE-CO. Evian Workshop Dec 2015 Marine Pace, BE-CO -Evian Workshop 2015.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
V4.
SPS Applications Software issues - startup in 2006 and legacy problems
Accelerator Controls Renovation Project “ACCOR”
CONS and HL-LHC day Analysis of needs from BE-CO
Status and Plans for InCA
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Presentation transcript:

BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO Courtesy slides from S.Deghaye & S.Page M.Vanden Eynden - BE/BI TB - May 21st 20151

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platforms – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st 20152

Foreword – CO3 Some information is still “provisional” Most of the subjects and questions raised in the context of this BI-TB will be addressed by CO3 The Objectives and subjects to be covered by CO3 where presented and the LMC meeting on March 4 th, 2015 The CO3 membership is currently reviewed with the GLs from BE, EN and TE committee/Minutes/1/lmc_207.pdf M.Vanden Eynden - BE/BI TB - May 21st 20153

CO3 - Proposals for 2015 Already agreed – Follow-up of the remaining Injector complex renovations (10%) until LS2 (post-ACCOR) New proposals – Coordination of operational developments via CO3 (ECR-like approach) – Launch project for “Future Front-end platforms” – Launch project for “High-speed radiation tolerant field buses” M.Vanden Eynden - BE/BI TB - May 21st 20154

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st 20155

Operational devices distribution Devices not belonging to a TST accelerator and in FECs marked as operational M.Vanden Eynden - BE/BI TB - May 21st 20156

LHC devices distribution Operational devices belonging to LHC Very good FESA3 adoption but critical systems still in FESA2 M.Vanden Eynden - BE/BI TB - May 21st 20157

Injectors devices distribution Same as before but only devices belonging to an injector (Linac2  SPS) The majority of the FESA2 devices are in the injectors  LS1 was focused on LHC M.Vanden Eynden - BE/BI TB - May 21st 20158

FESA2 in LHC per group 6% of the operational LHC devices are FESA2 Based on the FEC responsible group, the distribution is as follows M.Vanden Eynden - BE/BI TB - May 21st 20159

FESA2 in LHC per group (LTIM fix) Not all devices in a eqp group’s FEC belong to that group but difficult to separate except for LTIM  a closer to reality distribution is  CO wins !! M.Vanden Eynden - BE/BI TB - May 21st

BE/BI LHC devices distribution from Lars J. BOBR (BST receivers): “Will look at it in 2015 but it’s complex (interrupts)” BOSTEP: Planned for 2016 (partial). Many FECs and some will stay in ppc until LS2 BLMLHC: LS2 at the latest M.Vanden Eynden - BE/BI TB - May 21st

FESA2 in injectors per group 39% of the operational INJ devices are FESA2 Based on the FEC responsible group, the distribution is as follows M.Vanden Eynden - BE/BI TB - May 21st

FESA2 in injectors per group (LTIM fix) Adjusting for LTIM (see LHC slide for details), a closer to reality distribution is  CO wins !! (again…) M.Vanden Eynden - BE/BI TB - May 21st

BE/BI INJ devices distribution OasisChannel => to reassigned to CO (planned for 2015/16 from Lars J. BXSCAL -> no plan BTVI planned for 2015/16 M.Vanden Eynden - BE/BI TB - May 21st

# of BI FESA2 classes vs # of instances E.g. 100 on x axis means up to 100 devices and more than 50 Less straight forward to find the classes to focus on BI plans stretches until LS2 M.Vanden Eynden - BE/BI TB - May 21st

GM/SL-Equip per eqp group M.Vanden Eynden - BE/BI TB - May 21st

Support level Framework support – Full support. Developer support and training. Bug fixes and new features released regularly. Development tools support – Tools are kept alive and working. Incl. FEC generation tools. No developer support nor new fwk releases (no bug fixes). Generic FEC Software (aka FES) support – As experts in FES, provide help and guidance on complex problems (memory leak, crashes…) – Available for any executable whatever the fwk. M.Vanden Eynden - BE/BI TB - May 21st

GM & SL-Equip End of Life/Support When? Since end of LS1 Support? generic FES support. GM & SL-Equip obsolete  no specific operational support Development environment not supported anymore FEC generation script not supported  if it breaks, the FEC responsible group investigates M.Vanden Eynden - BE/BI TB - May 21st

FESA2 End of Life/Support When? From end 2015 Support? Development tools & generic FES support Last FESA2 version is No new version, bugs won’t be fixed since it works today. No developer support => read-only source code on NFS No new development in FESA2 allowed – block insert in CCDB? Minor fixes and improvements in existing classes allowed Development tools support until beginning LS2 – CVS, Shell tool, DB extraction, compilation… to maintain OP support: No FESA2 specific support but general FES support (gdb, valgrind,…) M.Vanden Eynden - BE/BI TB - May 21st

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st

M.Vanden Eynden - BE/BI TB - May 21st

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st

Project for “Future Front-end platforms” >1800 operational Front-end systems for the Accelerator complex M.Vanden Eynden - BE/BI TB - May 21st TIER 1 TIER 2 TIER 3 POWER CONVERTER FGCs POWER CONVERTER FGCs TIER 4 LHC QPS NanoFIP Agents LHC QPS NanoFIP Agents LHC CRYOGENICS BEAM INSTRUMENT HARDWARE BEAM INSTRUMENT HARDWARE POWER CONVERTER MIL-1553 POWER CONVERTER MIL-1553 RF HARDWARE RF HARDWARE KICKERS HARDWARE KICKERS HARDWARE WorldFIP MIL-1553 RS-422 RS-485 VMEBus64x PICMG1.3 HP ProLiants PXI LHC COLLIMATORS IEPLC WorldFIP LHC CRYOGENICS & VACUUM Profibus PLC

Project for “Future Front-end platforms” Proposed by BE-CO and EN-ICE Motivation – VMEbus The VMEBus technology is widely considered as “legacy” in the embedded market and core components such as VMEbus bridges are discontinued The LHC experiments at CERN and major European and US Physics Laboratories (DESY, SLAC) are already running prospective studies and prototyping activities in order to replace the VMEbus technology – PXI, PICMG1.3 : rationalisation and new roadmaps have to be defined – PLCs : present recommendation is 17 years old, new roadmap needed for the next 15 years – New technological opportunities (mTCA.4, IPC, cRIO, etc.) – Emerging “high availability” requirements from HL-LHC (R.Schmidt) M.Vanden Eynden - BE/BI TB - May 21st

Project for “Future Front-end platforms” Scope – Debriefing of current situation – Gathering of HL-LHC era requirements – Evaluation of new Technologies – Collaboration with other Labs and PH department – Proof of concept (pilot operational installations) Time Line – Project definition and approval by end Q – Project organization in place by Q – JCOP workshop outcome in 10/2015 – Requirements study for HL-LHC completed by Q – Technology survey, small prototypes with industry completed by Q – Recommendation for Candidate technologies ready by end 2016 – Approval and first pilot installations in 2017 Criticality – Choice of platform is critical as the investment in budget and manpower is extremely important (tens of millions, lifetime of at least 15 years) – Short/Medium term covered by new frame contracts through Finance Committee M.Vanden Eynden - BE/BI TB - May 21st

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st

MEN A20 VMEbus CPUs New Market survey + tendering process has started with FP in 11/2014 About 15 companies have received the MS Target contract award date: CERN Finance Committee 11/2015 New boards should be available early 2016 Problem with the TSI148 VMEbus chip (IDT) Last MEN A20 order placed 11/2014 MEN A20 Stock carefully monitored M.Vanden Eynden - BE/BI TB - May 21st

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st

Post-ACCOR Renovations until LS2 BE-CO (MCCs & PLs) will present the outline, including important End of Life (EOL) dates for HW and SW components (CO3 meeting Early June) Equipment groups will present their renovation roadmap + feedback (CO3 meeting End-June) A total budget estimation for the Front-End Hardware is currently made in view of trying to obtain the budget from the consolidation (M.Benedikt) M.Vanden Eynden - BE/BI TB - May 21st

Agenda Support for FESA 2 Support for LynxOS-PPC Future Front-End Platform – VMEbus? Replacement of MEN A20 VMEbus CPUs Post-ACCOR Renovations -> LS2 (Budget?) BE-BI Piquet access to BE-CO Stock M.Vanden Eynden - BE/BI TB - May 21st

BE-CO Hardware Stock Will be effective on 07/2015 Will be located in BA3 CERN access card required In the meantime BE/BI can have spare parts on its own premises M.Vanden Eynden - BE/BI TB - May 21st