Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer.

Slides:



Advertisements
Similar presentations
Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM.
Advertisements

The Very Large Array Past and Future Dave Finley.
Loránt Sjouwerman, Ylva Pihlström & Vincent Fish.
EVLA Data Processing PDR Proposal Handling Honglin Ye, NRAO.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
Radio Telescopes Large metal dish acts as a mirror for radio waves. Radio receiver at prime focus. Surface accuracy not so important, so easy to make.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Transient Science with the Allen Telescope Array Geoff Bower Berkeley.
Users' Committee, 25 Oct 2010 Chandra Director’s Office Cycle 12 Peer Review  June 2010, Hilton, Logan Airport  No major changes in Cycle 12 
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
Preparing for Science Brief introduction to the page T-4 Years Timeline This would be a new high level graphic that puts all of our milestones.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
Portal and Proposal Submission Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler EVLA Computing Division Head.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
VLA Archive Image Pilot Pilot to create images from VLA archive data Loránt Sjouwerman National Radio Astronomy Observatory.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Asymmetric Planetary Nebulae IV La Palma, Canary Islands Water Fountains in Pre-Planetary Nebulae Mark Claussen NRAO June 19, 2007 Hancock, New Hampshire.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Radio Interferometers’ Data Archives how to find, retrieve, and image radio data: a lay-person’s primer Michael P Rupen (NRAO)
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
E-MERLIN & EVLA P.J.DiamondP.J.Diamond MERLIN/VLBI National Facility Jodrell Bank Observatory University of Manchester MERLIN/VLBI National Facility Jodrell.
Fermi Users Group Meeting Goddard Space Flight Center, February 6, 2009C. Shrader, NASA/GSFC 1 Fermi Users Group FSSC News Chris Shrader, Fermi Science.
GBT Future Instrumentation Workshop Fixing the frequency coverage hole in C-Band Jagadheep D. Pandian Cornell University.
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers & Jim Ulvestad NRAO 15 Oct 2009 USSKA Consortium Meeting.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Mapping the U.S. Scientific Future in VLBI ftp.aoc.nrao.edu/pub/VLBIfuture VLBI Future Committee: Shep.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Short Spacing.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
The North America Array Technology Development and the Realization of the SKA-High Steven T. Myers NRAO 14 May 2009 USSKA Consortium Meeting Washington,
Bryan Butler EVLA Computing Division Head
EAC Butler - SSS Software
EVLA Overall Software Design
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Gustaaf van Moorsel September 9, 2003
Software Requirements
Shared Risk Science with the EVLA
Observatory Science Operations
IEEE IMT-Advanced Review Process
EVLA Operations Jim Ulvestad
IEEE IMT-Advanced Review Process
Observatory Science Operations
IEEE IMT-Advanced Review Process
EVLA Construction Status
IEEE IMT-Advanced Review Process
Transition Observing and Science
The Karl g. jansky Very Large Array
Presentation transcript:

Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer

Outline Proposal writing – Generic – EVLA and VLBA Demonstration of NRAO Proposal Submission Tool (PST) Questions NRAO EVLA Twelfth Synthesis Imaging Workshop 2 NRAO VLBA

Outline Proposal writing – Generic – EVLA and VLBA Demonstration of NRAO Proposal Submission Tool (PST) Questions NRAO EVLA Twelfth Synthesis Imaging Workshop 3 NRAO VLBA

Generic Start with scientific idea and target list Draft a scientific justification – Write to astrophysically-literate but non- expert reviewers – Give science context and motivation – Pose specific science questions – State specific science goals – Describe target selection criteria – Say how proposed observations will … Answer the science questions Achieve the science goals 4 Twelfth Synthesis Imaging Workshop 200 kpc HI Ring in Leo Group Arecibo 1.4 GHz S. Stierwalt Primordial versus tidal ring? Look for dark halos in dwarfs 

Generic Specify required … – Angular resolution – Largest angular scale – Observing frequency – Observing bandwidth – Stokes parameters Select trial array – EVLA, VLBA, MERLIN, EVN, GMRT, SMA, CARMA, ATA … 5 Twelfth Synthesis Imaging Workshop Radio Galaxy Fornax A VLA 1.4 GHz 1.0d x 0.7d R. Ekers NRAO Image Gallery

Generic: Evaluate Trial Array Special needs – Redshifted HI ? – Redshifted CO ? Geometry – Target above elevation limit ? – Snapshot or full u-v coverage ? Interferometer sensitivity – Signal-to-noise to self-cal target ? Image sensitivity – Enough signal-to-noise on target ? – Dynamic-range limited ? Twelfth Synthesis Imaging Workshop 6 Supernova Remnant Crab Nebula VLA 5GHz 7’ x 5’ M. Bietenholz

Generic: Evaluate Trial Array Enough field of view ? – Primary beam attenuation – Bandwidth smearing – Time-average smearing – Non-coplanar baselines Optimal timeframes ? – Time of day – Season – Year ~ sunspot number If trial array fails, pick another If trial array passes, search its archive for suitable data – If none, complete scientific and technical justification, submit proposal Twelfth Synthesis Imaging Workshop 7 Sun TRACE X-rays

EVLA/VLBA Proposals See NRAO Call for Proposals at Add cover information via NRAO Proposal Submission Tool (PST) – Access NRAO PST at – For EVLA, VLBA, GBT or any joint combination thereof Add scientific and technical justification as a pdf file – 4 pages for a regular proposal – 6 pages for an EVLA resident shared risk proposal – 10 pages for a large proposal (200 or more NRAO hours) NRAO staff co-author optional Submit via NRAO PST 8 Twelfth Synthesis Imaging Workshop

EVLA/VLBA Proposal Handling Received for deadlines 1 Feb, 1 Jun, 1 Oct for trimesters B, C, A Classified by scientific categories Sent to category’s referees Referees return ratings and comments Ratings and comments sent to Proposal Selection Committee (PSC) – David Hough, Deidre Hunter, Stan Kurtz, Ylva Pihlstrom, Arnuj Sarma, Russ Taylor, Stephen White, Min Yun – Barry Clark, Mark Claussen, Bob Dickman, Dale Frail, Joan Wrobel PSC meets Apr, Aug, Dec PSC results ed to proposers 1 May, 1 Sep, 1 Jan Details at Changes to this scheme are coming in Twelfth Synthesis Imaging Workshop

EVLA/VLBA Proposals and Students Consider submitting a deadline early – Use referee feedback to prepare, re-submit improved proposal Are proposed observations for your thesis ? – If yes, amend your user profile at Add Plan of Dissertation ~ timeline + NRAO resources Update graduation year Are you eligible for funding ? – US universities and colleges – Regular or Large proposals – Apply via NRAO PST Donate thesis copies to NRAO – Twelfth Synthesis Imaging Workshop 10 VLBA 22 GHz A. Brunthaler

Other Proposal Types and Routes EVLA/VLBA rapid response science – Exploratory Eg, quick follow-up of recent discovery – Target of opportunity: Eg, unpredicted phenomenon – Joint proposal routes – Chandra/EVLA/VLBA – Fermi/EVLA/VLBA Twelfth Synthesis Imaging Workshop 11 Binary Black Hole Candidate VLA 8.5 GHz J. Wrobel Chandra Fermi

Outline Proposal writing – Generic – EVLA and VLBA Demonstration of NRAO Proposal Submission Tool (PST) Questions NRAO EVLA Twelfth Synthesis Imaging Workshop 12 NRAO VLBA