Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Jan Uythoven For discussion
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Thursday 10th May - morning
Week 36 plan Todo’s: And also: 12+b injection.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
New page for summary of test status
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Presentation transcript:

Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking tests RB12 heater discharging need access 21:30 LBDS finished at high energy 21:35 RB tripped. 21:40 LBDS test at 450 waiting the RB 45 New squeeze function tested in IP 1 23:00 Q9 in 2 and 4 faulty, RB12 qps not ok 23:00 we decide to postpone the BIC loop and the MKI test. Heat run 81

Beam on TI 8

LBDS BETS at 3.5 TeV

LBDS LBDS tracking test. During this test check the SMP energy sent around (Bruno). It should be coherent with the different failure modes forced below. During the energy ramps we should, at least on some ramps, also ramp TCDQ and collimators and check coherency. – With B1 and B2 armed 450 GeV trim RB 4 – 5 up (or start ramp on only this circuit): check dump 3.5 TeV ramp RB 7 – 8 down: check dump 450 GeV trim RB 6- 7 up: check dump 3.5 TeV trim RB 5 – 6 down: check dump – B2 armed at 450 GeV Trim up Q4.R.B1: nothing should happen. Trim up Q4.R.B2: provoke beam dump – B1 armed at 3.5 TeV Q4.L.B2 Trim down / off: nothing should happen Q4.L.B1 Trim down / off: Dump TEST RF frequency (with Andy) – Test LBDS triggers when RF signal is cut. – Test connecting to the correct RF frequency B1 / B2. XPOC latching with SIS Inject & dump mode. Start ramp, injection should stop.

90 meter optics tested

78 Sector 56/67/78 heat run PGC loaded

67

56

Progress of the day Beam on TI8/TI2 TI8 looks all OK (not touched during the TS) BPM problems in TI2 - BPMI.215 and BPMI.291 have H and V planes inverted - BPM.231 has a sign error for the H plane. - BPMI.284 is very noisy, multiple triggers BIC – BSRT ready – connection problem solved. Timing – Did real injection requests under LHC mastership with injection sequencer double threaded. BPMs triggered fine with pre-pulse - concentrators fine with it (picked up by IQC, YASP). BT pre-pulses arriving synchronously at MKIs (checked on OASIS). IQC reacting fine. – Potential issues with the BCTs in IQC Checked with BI solved – real dedicated filling tested ok – Frev distributed – Machine check out tests started

Progress of the day BT – MKQ MKA AC-DIPOLE tested OK – MKI pulsing Frev present Prepulse trigger observed on OASIS Impossible to close BIS loop – LBDS energy tracking Q4L6 Q4R6 RMSD.LR6B1 RMSD.LR6B2 S45,56, 67,78 ramped to 3.5 TeV Tested at 3.5 TeV To be completed at 450 GeV

Progress of the day Vacuum interlock test – Ring and Exp’s ready – Valves opening today – Interlock tests Done PC – heat run – Few issues to be checked by MPP

LSA New LSA functionality – Tested the incorporation process with the new parameters: – START-OF_BEAMPROCESS – END_OF_BEAMPROCESS – PREVIOUS and NEXT optics for the incorporation rules. Works fine for matched optics and for intermediate stopping points. – Greg has the green light to release the new functionality – Laurette modified the sequencer tasks related to the SMP changes(FORCE/UNFORCE SFB and RELAXED THRESHOLD)

BLM Completed checks: Sent triggers for the - Post-Mortem, - XPOC (both beams checked), - Capture data: IQC and Study buffers (new feature) Verified the following continuous features: - Serials for all electronics are correct - Integrated dose calculation and storage (new feature) - Monitor filter values propagation (new feature) Verified the Sanity Checks complete successfully. - MCS online check (new parameters have been included) - Internal check of the beam permit lines - Connectivity check thresholds Verified the Generation and Drive of the system parameters (has been modified to include new features). Not completed checks (ongoing): - Lost packet statistics between the concentrator and FESA class - Communication/Optical links performance between the tunnel and surface installation. - Noise analysis of the acquisition system - Perform 6 hours of HV modulation test to gather more values for better determination of the connectivity check thresholds (tonight after your confirmation).

Open issues & Access Handshake done – Few issues found continue on Friday morning CO – BE/CO and IT/CS are asking for a network intervention tomorrow Thursday in the shadow of the PS POPS intervention. 2 minute network cut should be performed at 9:30am. BT – LBDS Bets to be completed at 450GeV PC’s – After first real heat run – Several pc’s tripped see sector status

Open issues & Access Vacuum – Validation of TOTEM and ALFA interlock logic need detailed tests and as they use the collimator control system, need to be coordinated with Stefano. RF – Prepulse tests Alice and LHCb ?

Planning