Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January 2005 Genova Site - 2004 Report C.Gemme, G. Darbo, V.Kostyukhin INFN / Genova Copy of.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Investigation of Proton Irradiation-Induced Creep of Ultrafine Grain Graphite Anne A. Campbell & Gary S. Was University of Michigan Research Supported.
Conclusions on torque and grease1 Alexander Dierlamm, Michael Eppard (CERN) Measurements of thermal contact between TOB module and rod May 2004.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Chilled Water Piping Systems (VPF Focus)
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Slides for Jörn Talk IBL Sensor Review Kick-off Meeting CERN, May,
SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Magnus Pro Training Presentation
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Autoclaves in the School of Life Sciences at Warwick Janine Kimpton – Technical Services Centre Manager Dave Hibberd – Workshop & Infrastructure Manager.
1 TPC online  offline calibration November 2002.
Large Cameras Microphones – Plug in at top of camera – Put microphones away when finished Set camera to “Camera” 1.Audio Button should be on Channel 1.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
FNI 2B OM 1 Optical Microscopes. FNI 2B OM2 Outline Justification History Components of the Optical Microscope Theory of operation  Basic Microscope.
Swimmer’s Itch Survey 2015 Volunteer Sampling Protocols.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz PXD support (IFIC - Valencia) 26/7/2011.
ENCOMPASS Voucher Build Process
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
1 Activities in Wuhan TopMetal sensor & ALICE ITS upgade Xiangming Sun CCNU ALICE ITS Upgrade and O2 Asian Workshop 2014.
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz 8 th International Workshop on DEPFET Detectors and applications.
HIFU Technology History ABLATHERM ® Device Treatment Ablatherm Ablatherm ® INTEGRATED IMAGING The The HIFU Treatment for Localized Prostate Cancer Exit.
ITop Cooling Analysis by Chris Ketter. eLog Analysis 18.6mA each amp 80.9mA each ASIC Average boardstack temp.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - December 15, 2008 CDMS Status, Upgrades and Plans Summary of running at Soudan Cryogenic and.
Octobre MPI Munich VFCAL Report W. Lohmann, DESY Laser alignment system Infrastructure for sensor diagnostics Sensor test facilities FE design Labs.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
IPD Technical Conference February 19 th 2008 Automotive Electronics Shock Absorber Inspection Ohio Office.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
RVP vision probe for REVO-2. Non-contact measurement Surface finish 5-axis scanning and touch 2D scanning and 3D touch 3D scanning and touch The REVO-2.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
Electrical Measurements on stave S4028 Claudia, Fabrizio, Illona After loading, we have done a quick test (RECV) using a single module setup (MAC-based)
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Improving & combining the spatiale & temporal resolution
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
VEX IQ Mix & Match Curriculum
Pompa Tenaga Surya The Complete Efficient Solar Water Pumping System.
The Silicon Drift Detector of the ALICE Experiment
Prototype activities update
DT Infrastructure: LV, HV, Gas
The Stave Thermo-Conductivity QC Procedure Idea
RPC Detector Control System
Mean positions should be shifted by ~50m
MEG II実験 液体キセノン検出器の建設状況
RPC Detector Control System
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
Presentation transcript:

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January 2005 Genova Site Report C.Gemme, G. Darbo, V.Kostyukhin INFN / Genova Copy of this talk on the CDS Agenda:

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Status of Loaded Staves in Genova  Stave /08/2004 Pre-production stave, completely characterized, data summary available at:  Stave /10/2004 Initial production stave #1, completely characterized. On this stave we had a power fail on the chiller that had the consequence of over heating 6 modules that were powered. Temperature on the modules NTC reached 80÷90ºC. All the modules tested again after the accident and did not show damages. data summary available at:  Stave /11/2004 Initial production stave #2, LOAD test performed, Burn-in. STAVE test underway. The LOAD test have been performed with a new set of analysis cuts to overcome the effect of HV bias off in the SURF. Survey has been made, but there was large difference in temperature (~6ºC) between loading and survey rooms. Because all screws were left tight there is a suspect that this induced a deformation to the stave due to the large CTE of the aluminum cradle. The module position in Z is ±15÷20 µm, while in X there is a larger error that we think is partially induced by change of bow due to thermal effect. When the STAVE test will be finished a new survey will be made.Partially filled data summary tables:  Stave /12/2004 Initial production stave #3, stave loaded, now under survey.

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Robot Upgrade  To improve the precision of the loading robot, 3 additions to the setup are under way: 1)Temperature will be monitored by a temperature logger with 4 channels. Temperature probes have been put in thermal contact with support parts of the robot and also air temperature is monitored. 2)A linear encoder from Heidenhain, mod. LS-487C, having 5 µm precision, have been ordered. The encoder has a travel of 92 cm and will be used to monitor and correct the linear Z movement of the robot stage. The encoder parts will be in genova by mid February. 3)A digital measuring microscope has been bought and it will be used to measure the position of the modules in the garage position or on stave. The microscope is from Keyence, mod.VHX-100 with two zoom lens (25÷175 X and 100÷100 X). It has 18 MPixels resolution and calibrated measurements in the image plane. Also digital image processing are available in the system, like depth of focus increase and several options for image enhance.

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Stave T=10ºC, Room T=0ºC, Pump Speed 1… Pump Speed

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Stave T=-20ºC, Room T=0ºC, Pump Speed 1…8 Pump Speed

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Stave T=0ºC,-10ºC,-20ºC, Room T=0ºC, Pump Speed 6 Stave Temp. T = 0ºCT = -10ºC T = -20ºC

Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January Electrical Test  The electrical test for LOAD and STAVE is implemented using 2 SURFs boards. It is planned to add other 2 to completely automatize the system as soon we will receive them from LBL. The movement of the source is controlled under ambush.  For next stave the test should run in completely automatic way.  Some new analysis cuts have been defined to overcome to the "bias effect" on HV off when a module is tested with the SURF.