Compliance NFS Test Portal Results System Performance Issues & Resolutions Targets Enhancements System Availability YTD (Severity 1) = 99.51% Target for.

Slides:



Advertisements
Similar presentations
____ __ ____ _____ ____ ______ _____ _____ ____ _____ _____ _____ ____ _____ Click to edit Master text styles Second level Third level Fourth level Fifth.
Advertisements

Istanbul Forum Country Exercise: Standard slides for country delegations.
MASBO February Information to purchase Services Information to purchase Construction.
Leaders in Asset Management Managing by Metrics Valerie Rovine Sunflower Systems.
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
Alberta Occupational Health and Safety Update 2013.
Information Sharing 1. Overview Inquiries into sexual violence incidents are extremely sensitive. Collecting and sharing information on GBV can be dangerous,
FY 2013 Technical Assistance and Capacity Building under the Transformation Initiative OneCPD TA NOFA 1.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Core Performance Measures FY 2015
Tech Talk IT Guidance for Executives.  Information & Communications Technology is a key enabler to Customs reform and modernization  Already ubiquitous.
Chapter 14. To understand the process of project audit To recognize the value of an audit to project management To determine when to terminate a project.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
1 Next Generation ISO Susan LK Briggs Presented to EFCOG/DOE EMS Implementation, Lessons Learned & Best Practices Training Workshop, 3/05.
Occupational Support Services DEPARTMENT OF BUSINESS AND EMPLOYMENT Occupational Health & Safety Advisory Service (OH&S) Workplace Injury Solutions (WIS)
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Looking Back for the Future: Using Appraisal and Self-Evaluation to Guide Future Development.
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Monica J. Stern, Certified Public Accountant. What is an audit? An audit is a prescribed process a Certified Public Accountant applies to your financial.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Quality Control Project Management Unit Credit Value : 4 Essential
Ollie Ollewagen 7 August 2013 NFS Portal Testing Progress.
The Partnership to Enhance Nursing Education at JUST JEP
1 Working with EM Care Home Associations. Click to edit Master text styles Second level Third level Fourth level Fifth level East Midlands Continuing.
November 13, 2003 CMT Day 1 Kate Johnston Corporate Projects Consultant Halton Region CMT: The Halton Experience.
© Copyright 2005 In association with A division of Bytes Technology Group South Africa (Pty) Limited Client logo Partnership Models for Sustainable e-Government.
A Client-Centric Service Delivery Model June 17, 2005 PSSDC-PSCIOC Research Committee Improving the Telephone Channel for Canadians O-Canada.
 Project management is the organization and management of resources (i.e. people, information, tools and machines, materials, time, capital and energy)
Professional Development and Review Scheme (PDRS) for Teachers.
African Regional Director
PARTNERSHIP ACTION PLAN ON DEFENCE INSTITUTION BUILDING: CONCEPT AND IMPLEMENTATION SUSAN POND, NATO INTERNATIONAL STAFF, HEAD, PFP AND CO-OPERATION PROGRAMS.
Service Level Management SLM Concepts Explained Copyright 2002 Easytec Solutions.
1 Slide For Introduction PEMANTAUAN KEMAJUAN KERJA.
A GEO Label: Scope of Review Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
Population Health Janet Appel, RN, MSN Director of Informatics and Population Health.
Peer Evaluation of the Norwegian Board of Health Supervision (Statens helsetilsyn) First of its kind. Performed by EPSO Peer Evaluation Team Norway (July.
CHARTER – User Intelligence Groups Group Objectives Scope & Activities Key Areas For Success  Visibility of expenditure on goods and services across the.
Axios Systems IT Service Management Solutions TM Information Management Good Information Makes the Users Efficient and Positive Brian.
Knowledge Unplugged – The Deakin Portal Professor Brian Corbitt Deakin University.
© 2010 The Advisory Board Company – Assessing the Value of Care Management Services Wanting their Money’s Worth Jupiter Corporation Manufacturer.
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
Greening the Structural Funds Programmes Agata Miazga-Payne on behalf of GRDP partnership.
John Batty DEFRA UK Bratislava November Legal Background For any given surface water body, applying the MAC-EQS means that the measured concentration.
2 Bus Safety – It’s a shared responsibility About us: Bus Safety Victoria The Bus Safety Act 2009 Accredited and Registered Bus Operators Procuring a.
Evaluation Planning Checklist (1 of 2) Planning Checklist Planning is a crucial part of the evaluation process. The following checklist (based on the original.
Team Assignment Importance of the assignment Assignment details Team Allocations Presentation details Submission Requirements Feed forward into Assignment.
Devon & Cornwall Police Authority Performance Summary February 2011.
The Regulatory Assistance Project China European Union United States E, M&V role of the UK Energy Regulator (Ofgem) in Energy Efficiency.
Conclusions. EULIS offers you... Involvement Free entry Value for money.
Media Planning and Strategy
Continuing Professional Development Assessor Briefing
Operations Report capmetro.org | Operations Report.
MHSC TB, HIV/AIDS and Silicosis Initiatives
CHARTER – User Intelligence Groups
National Science Learning Network development day: Evaluation Workshop
Software Development Life Cycle
Change Network Timeline
A Guide to Determining Accident Preventability
Evaluate the effectiveness of the implementation of change plans
Information Technology Department IT Service Management Request Fulfillment & Knowledge Management Information Technology (IT)
Our New Integrated Business Management System [“IMS”]
Projects: In the Beginning
Global Technology Services
Failure Mode and Effect Analysis
Projects: In the Beginning
Configuration management
ISDS Service Support Performance – May 2019
Journey Centric Delivery Day 1 Live Plan
Presentation transcript:

Compliance NFS Test Portal Results System Performance Issues & Resolutions Targets Enhancements System Availability YTD (Severity 1) = 99.51% Target for System Availability = 99.80% (Source: ITS, 04 Feb ‘13) MNL YTD = 54% DSL YTD = 62% (Source: NFS Test Portal, 04 Feb ‘13)

Although system problems are experienced, it exceeded the acceptable System Availability of 85%. Actual System Availability YTD for Severity 1 incidents (as measured by ITS) = 99.51%. Compliance by NFS staff to use NFS Test Portal – as a tool to assist them & to enhance service delivery to customers – is problematic….  only 45% exceed usage/testing of 60% on MNL testing  Target 70%  only 47% exceed usage/ testing of 60% on DSL testing  Target 80% Users are not measured based on the failure rate ór the result of the test, but rather whether a test was done. If a test was done on the Portal and it fails due to a IT system or IRTMS, the technician gets the benefit that he/she has tested the service. Compliance – Pressure Point (!)

YTD compliance by all Users Source: NFS Test Portal Reports – YTD (Apr ‘12 – Jan ’13) Users : M6, OP1, OP2 & Contractors Users Users 45% 47% 55% 53%

Way forward Based on utilisation graph, we need to agree on target to be achieved for ePDMS evaluation. –Comply (Y) / Do no comply (N) –12.5% weighting –8 PEP measures Proposal: –DSL 60 % compliance for 2012/13 –MNL 50 % compliance for 2012/13 Social partners to encourage members to utilise the NFS Test Portal, in order to improve our service to customers; ensure that ‘quality’ work orders are completed; and effective utilisation of resources (ie. time; vehicles; labour & costs). Slide 4