Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
CricketSat Assembly.
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
The MAD chip: 4 channel preamplifier + discriminator.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
Recap Analysis RIKEN/RBRC Itaru Nakagawa. Conductive Rubber Attempted to cut in RIKEN using super sonic cutter. Achieved Precision ~ ± 0.8mm 抵抗値 富士高分子.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Trigger Bias Study at Test Bench Data RIKEN/RBRC Itaru Nakagawa.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Timing Jitter and Cross Talk in the SRS + Xray scan of FIT zigzag board Michael Phipps, Bob Azmoun, and Craig Woody 1.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Atsuhiko Ochi Kobe University
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Performance of PHENIX High Momentum Muon Trigger.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
1 R&D status report of LST technology (2) Changguo Lu Princeton University BaBar IFR Workshop SLAC, December 8, 2002.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Update of Prototype AT-TPC May 6, 2010 Weekly meeting Daisuke Suzuki, NSCL.
A proposal to equip the high eta muon stations with High Rate GRPC
RadLab PHENIX Meeting Feb
IHEP group Shashlyk activity towards TDR
Preliminary Performance of the L2 Chamber (Side A)
News on second coordinate readout
FCPPL, Clermont-Ferrand , 8-10 April, 2014
M. Alexeev on behalf of Torino TIGER Test Group
Pre-installation Tests of the LHCb Muon Chambers
Seyoung Han / Ewha Woman’s Univeristy
(On Behalf of CMS Muon Group)
Resistive Plate Chambers performance with Cosmic Rays
Presentation transcript:

Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao (RIKEN) Yoshimitsu Imazu (RIKEN) Kentaro Watanabe (Rikkyo) 1

MuTr Cross Talk 2 HV (1800 V) 1 M  Anode wire 1 M  100 pF.... Cathode strips (96 strip) ~0.1 pF/strip Rise time of anode signal ~ 10 nsec Removed to reduce HV trips Anode Readout 100mV 3V3V 3V3V Serious Issue for Big Pulse Pointed out by Tsutomu Decap Doesn’t exist.

Solution 3 HV (1800 V) 1 M  Anode wire 100 pF.... Cathode strips (96 strip) ~0.1 pF/strip Rise time of anode signal ~ 10 nsec R<<1M  1 M  Additional Circuit to let anode current escape to ground.

Pads for surface mount capacitors Left over Solder + Coating Pads for surface mount capacitors Left over Solder + Coating To Anode Wire MuTr Station-3 Anode Card Capacitor (Removed) 4

North Station-3 Anode Gap 5 25mm 28mm Geometrical Constraint Anode cards are only accessible from their back. Front pattern can only be visible using an inspection mirror.

Mounting A Clamp on Anode Card Probe 6 Gap-1 Station-3 Anode Card Screw Station-3 Chamber Capacitor Pad Gap-2 Station-3 Anode Card 28mm MuID Side IP side Anode card Clamp

Recap Clamp Prototypes 半田の残りかす (C) ShinEtsu Rubber Co. : EC-BM300 (2.5  cm) (A) 4 pin probes (B) single pin probe 7

Advantage/Disadvantage of Different Prototypes Single Pin Probe Low resistivity. Strength against stress is not too strong 4 Pin Probes Stronger against stress More Chances to make contact. Uncontacting pin can behave as unwanted capacitor between pad Conductive Rubber Probe Absorb surface structure. Stable Contact Removing Anode Coating Required Resistance depends on stress of rubber volume Advantage Disadvantage 8

Effect of Recap 9

Test Bench Setup 90Sr Source Anode wire 10 Strip #22 w/ and w/o Clamp

Comparison w/.vs w/o Terminator Trigger w/o Clamp Strip# w/ Clamp Trigger w/o Clamp

Comparison w/.vs w/o Clamp w/o Clamp With Clamp Strip Number Average ADC [channel] Conductive Rubber 12

Towards Successful Installation 13

14 Fiber Scope Alignment Spacer determines Transverse direction within ~ 300  m. Spacer determines Transverse direction within ~ 300  m. Possible misalignment can be found by visual inspection using a fiber scope Possible misalignment can be found by visual inspection using a fiber scope Fiber scope shot

Electrical Contact 15 Readout socket Readout Board Electrical Contact will be confirmed by measuring Voltage using temporary readout tool. Electrical Contact will be confirmed by measuring Voltage using temporary readout tool. To be removed after the measurement.

ClampCoatingMax CurrentAverage Current w/ow/<1uA w/w/o>100uA Tripped after 2 min. w/ 1uA w/w/o>100uA Tripped after 1min. w/ 2uA 16 Extreme Breathing Test HV=1900V Duration 2min

Installation Proposal Single Pin Probe x 20 4 Pin Probes x 20 Conductive Rubber x To be installed North Bottom Octants

Summary We have developed prototype clamps for re- capacitation to MuTr St-3. Good Contact was established more than 90% channels with present design in North MuTr. We propose to install 3 different prototypes (each 20) to North bottom Octants for Run11. They can be uninstalled during Run if they cause trouble in HV operation. 18

Backup Slides 19

20 ADC MIP Event Display of ADC Distribution Strip Gap 1 Stereo Gap 2 Stereo Gap 3 Stereo Gap 1 NonStereo Gap 2 NonStereo Gap 3 NonStereo