X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.

Slides:



Advertisements
Similar presentations
SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
SCU Measurements at LBNL
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Available thin solenoids with dimensions of about 1 m  X 1 mL with field about 1 tesla in KEK/IPNS KEK/IPNS Y.Makida 2005/March/28.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Superconducting Undulator (SCU) Development at ANL Efim Gluskin on behalf of the APS/ANL team Superconducting Undulator R&D Review Jan. 31, 2014.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
SCU1 Vertical Test Results Matt Kasa 9/16/2014. Vertical Cryostat Assembly Coil Training Record the current decay and the terminal voltage across the.
ILD solenoid magnet construction in Kitakami-site 17. December Tokusui Workshop KEK : Y.Makida, T.Okamura, Y. Sugimoto Toshiba : Nakamoto 、 Orikasa.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Optimized CESR-c Wiggler Design Mark Palmer, Jeremy Urban, Gerry Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
SBS Magnet John J. LeRose. Magnet: 48D cm gap, 2-3 Tesla*m Solid angle is 70 msr at 15 ° GEM chambers with 70 μm resolution Momentum resolution.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
January 22-24, LCLS Week 2 The Extruded Aluminum vacuum chamber…
Advanced Photon Source Undulator Technology for Ultimate Storage Rings (USRs) By Mark Jaski.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Summary of the 2014 Superconducting Undulator Workshop Jim Clarke STFC Daresbury Laboratory and The Cockcroft Institute Beam Dynamics Meets Magnets - II,
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Part 2: NbTi Magnet Performance Yury Ivanyushenkov for the APS SCU Team: S. Bettenhausen, C. Doose, M. Kasa, Q. Hasse, I. Kesgin, D. Jensen, S. Kim, G.
Summary of discussions
FEL SCU development at APS/ANL
CBM magnet overview of the BINP work
presented by Brett Parker, BNL-SMD
Summary of Session: Magnets and undulators for light sources 2
11 T Dipole Integration & Plans M. Karppinen
Status of the CLIC DR wiggler design and production at BINP
The CMS magnet superconducting coil
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
ELENA electron cooler and SEM grids status
Magnetic Measurements For The LCLS Undulator System
Spectrometer Solenoid Fabrication Status and Schedule
Summary of discussions
SCU Next Phase Meeting July 8, 2014.
Technical Summary - ANL
Magnetic gap calculation
A Cold SCU Phase-Shifter
Updated concept of the CBM dipole magnet
Budker Institute of Nuclear Physics,
Globus-M2 will be constructed by the end of 2015
Collaboration Meeting
Presentation transcript:

X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall probe in SCU1 20APR X ANL beam chamber full assembly complete X X 60K shield/MLI, 20K shield & 20K cryocoolers installed 17APR Anticipate ~2 week delay in cold test start Cold mass assembly begins this week    X X Magnet clamp system has been developed to correct core distortion after potting Vertical tests complete 17JUN

Results of Vertical Cryostat Hall Probe Measurements with Main Coil Current of 600A, Peak Field ~ 1.71 Tesla

Hall Probe Measurement Results cont.