Florida Inland Navigation District: Broward County Deepening Project Dredging Challenges – Permitting the Dredging of the Intracoastal Waterway, Dania.

Slides:



Advertisements
Similar presentations
Navigation – Recreation – Wildlife Mitigation Management of Sediment Post-Hurricane – Beneficial Uses of Dredged Material.
Advertisements

Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Florida Inland Navigation District: Permitting and Construction of the M-5 Island Offloading & Crossroads Maintenance Dredging and the NA-1 Upland DMMA.
Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.
Garfield County Temporary Employee Housing May 3 rd, 2007 Energy Advisory Board.
Data integration: publications. Data integration: datasets Sediment core description sheets Sediment core description sheets Sediment core description.
1 Role of Local, State and Federal Agencies in E&SC Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Requirements for Individuals.
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Atlantic Intracoastal Waterway (AIWW)
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
ANRC AACD Arkansas Conservation Districts Training Program Power Point 12 Arkansas Natural Resources Commission.
Background Roundtable of Federal Hazard Mitigation Partners in the Pacific Islands (FHMPPI) (2002 – 2003) Pacific Risk Management `Ohana (PRiMO) (2004.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
MassDOT P3 Project Overview. MassDOT Project Mobility.
The Economic Effects of a Dredging and Maintenance Program for the AIWW in NC Chris Dumas, UNC Wilmington Jim Herstine, UNC Wilmington John Whitehead,
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Los Angeles District and South Pacific Division CERB June 4, 2009 Technical Tools for Regional Sediment Management Susan Ming – USACE, Los Angeles District.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Lake Apopka Restoration Proposed projects for Legislative Appropriation.
Dredging Engineering: Building & Maintaining Underwater Highways
Oregon Department of State Lands Annual Land Management Report October 2009 An annual report to the Land Board on land management activities, including.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
DateDecisionCommentsStatus 10/03/2013 High level workflow logic diagram for ePermits approved Gabbie Drice will provide overview to each subcommittee and.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
JACKSONVILLE ODMDS DESIGNATION M. Rau, J. Seitz, C. Smith, N. Lombardero – ANAMAR Environmental Consulting, Inc. Chris McArthur – USEPA Region 4 P. Griffin,
CLEAN WATER ACT Section 319 Grant Funds Robin F. “Rob” Rung Contracts / Grants Officer Water Quality Planning Bureau Department of Environmental Quality.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Planning the Path Forward Institute for Water Resources Website Communications.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
PIANC USA and ASCE-COPRI DREDGING 2012
Role of Voluntary Sector in Public Service Delivery : Estonia Jon Ender, Estonian Law Centre Foundation, analyst.
Soil & Water Conservation Districts HELPING LAND OWNERS PROTECT, MAINTAIN, AND ENHANCE THEIR NATURAL RESOURCES.
Strategic Planning for Contaminated Sediment Projects: Setting the Course for Proper Project Execution Howard L. Cumberland Geosyntec Consultants October.
Brazoria County RESTORE Act Projects
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
1 The Economics of Coastal Economies: A Recreational Diving Perspective Bob Holston June 6, 2007.
General Water Obstruction and Encroachment Permits Presented by NCRO Watershed Management Program.
DUE PROCESS, MEDIATION & AGENCY COMPLAINTS Elvin W. Houston December 7, 2011.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
PLANNING FOR THE CIS WORK PROGRAMME PART 3 – NEW AND EMERGING ACTIVITIES SEDIMENTS WFD SCG May 2006.
Engineering Surveys & KGPS. Outline Problem Example Applications / uses of KGPS Project Example.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Environment Mick Borwell Environmental Issues Director.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Florida Inland Navigation District (FIND) Capabilities and Potential Assistance for Muck Removal in the Indian River Lagoon (IRL) System.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Data Stewardship Program V Data architecture treats information as an enterprise asset. What is Data Architecture Provides the vision for information.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Office of Greenways & Trails
Treasure Coast Regional Planning Council
Central Basin Municipal Water District
The Florida Inland Navigation District:
The Clean Water Act By Adam Salem Period 4.
Florida Bivalve Aquaculture BMPs
Level 1B: Advanced Fundamentals Effective August 2018
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Presentation transcript:

Florida Inland Navigation District: Broward County Deepening Project Dredging Challenges – Permitting the Dredging of the Intracoastal Waterway, Dania Cutoff Canal, and the New River Presented by: Robert J. Wagner, P.E. Coauthors: Lori Brownell, P.E. and John Adams, P.E. October 2012

Florida Inland Navigation District (FIND) g

50-Year Dredged Material Management Plan

Broward County Deepening Project Objectives

Project Strategy Document necessary public support Acknowledge regulatory agencies’ duty to protect the environment Justify public money expenditures Resolve technical issues Foster cooperation between all team members  FIND administration  Broward County Board of Commissioners  Permitting and regulatory agencies  Dredging contractor & subcontractors  Design team

Technical Issue Resolution

Technical Analyses: The Foundation of Project Design Aerials Bathymetric surveys Previous dredging records Natural resource data Dredged material disposal options Marine Industry economic analysis Recreational boater surveys Subsurface geotechnical investigation Physical & chemical sediment analysis Hydrodynamic water quality modeling

Project Description and Location – New River

Project Challenges – New River Tunnel

Project Challenges – Seagrass Avoidance Intracoastal Waterway Profile

Project Challenges – Seagrass Avoidance Intracoastal Waterway Section

Project Description and Location – Dania Cutoff Canal

Project Challenges – Dania Cutoff Canal

Project Overview – DMMA Offloading

Project Overview – DMMA Overview