ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
CHOCOLATE MOLD If there is anything missing from this PowerPoint beyond what is acknowledged, please tell Grant Dunbar. Thanks!!!
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
BPM support and beam pipe length FD support status A.Jeremie.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
November 19, 2008 SLAC Linear Collider Department Slide 1 ILC Superconducting Quadrupole Characterization J. C. Sheppard, Cherrill Spencer, et al. SLAC.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Air condition installation
IP Tuning Task Updates Glen White, SLAC January
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
Procurement, Measurement and Installation of 2 Octupoles for ATF
Tolerances & Tuning of the ATF2 Final Focus Line
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 IP Tuning Task Simulation Updates
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
Brief Status Report on Fabrication of ATF2 Quads
High Precision Magnet Production for NSLSII at IHEP
IP configuration session
Presentation transcript:

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2 quads and 2 sextupoles. Progress since my report of 27 th March th May 2008 Cherrill Spencer, SLAC Member of ATF2 Magnet Team With fine assistance of SLAC Mechanical Technicians, Magnetic Measurement Group & John Amann

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 2 QF1 ready to be put into shipping crate, 24 Apr 08 Requirements for the final doublet quads: QF1: K1=.737 ∫G.dl = Tesla Bore diameter = 50mm QD0: K1 = ∫G.dl = Tesla Bore diameter = 50 mm Effective lengths < 0.48m Measured effective length = meters

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 3 Chosen method for enlarging an old SLAC “QC3” quad’s bore diameter Placed a very flat and precise thickness shim in each split plane to “explode” the quad and enlarge the bore diameter. Shim is low carbon steel, ground to ” flatness Hyperbolic pole-tip is moved, along a radius, further out than it’s equation says it should be. XY= r 2 /2. Consequence: the 12-pole component increases, ~17 times predicts POISSON. ATF2 has very tight tolerances on the multipoles in QD0 & QF1 from 35mm to 50mm

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 4 Drawings of the modified core with ground shims in place Sextupole component is very sensitive to poletip being at wrong radius or the poletip being offset “azimuthally” INITIAL GOAL :Adjacent pole distances (red arrow above) “gaps” adjusted, by moving quadrants, to be same to +/ mm. Many efforts, but not possible to achieve this with 4 bore diameters & 8 gaps values simultaneously on both quads- see later

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 5 In order to achieve the very small multipoles : specification for the bore diameters and gaps between the ends of the adjacent hyperbolas In fact the actual value of the gaps is less important than their being the same to within +/-0.001”. We predicted that to achieve the very small sextupole component requirement the equivalency of the gap values would need to be: approx <+/ ” Units = inches

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 6 So I designed some pole-side shims to reduce the 12 pole. Shims have to be shorter than pole so can access end of hyperbolic poletip for QC of gaps 1.97Q17.72

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 7 Specification for the gap distances between the pole- side shims: found to not be a reliable measurement for determining if the 4 poles were symmetric as in slide 5 The variation in shim-to-shim distance was not a reliable guide to the variation in the distance between the ends of the hyperbolae.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 8 Photos showing the pole-side shims on QF1. They have been pinned into proper position. These shims are a little shorter than the poles, so a gauge block can be inserted between the ends of the poletips, to measure the gap between them.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 9 Worked with mechanical technician to improve adjacent poles’ & diameters’ symmetries Dowel pin holes adjusted then main bolt [holding 4 quadrants together] torque settings adjusted iteratively, distances and aperture diameters re-measured, until best values achieved Tried several mechanical configurations, measuring multipoles after each try, repeat until good enough. The spot size at the IP is very sensitive to the sextupole components in QD0 and QF1 –The unwanted sextupole is mostly a skew sextupole, it affects the spot size. We kept improving the adjacent pole distance symmetry. The pole gaps in QF1 have some final asymmetry, ~0.12 mm : QD0 final gap asymmetry was 0.025mm. –See slide 13 for measurements of the final multipoles

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 10 QD0 in final mechanical config. ∫G.dl v. I measured at SLAC with rotating coil

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 11 QF1 integrated strength measured by SLAC rotating coil set-up between 50 and 150 amps. Final mech. config.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 12 QF1 integrated strength measured between 80 & 220 amps

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 13 Final Multipole Measurements on both FD quads at r=1cm, in % Magnet Name Sextupole/ quad Octupole/quad10pole/quad12pole/quad20pole/quad Tolerance (tightest)* <0.03<0.025<~0.01<0.05<0.12 QD0 at amps QF1 at 77.5 amps * Multipole tolerances arrived at by many iterations between magnet engineer and beam dynamics experts. E.g. original sextupole tolerance was too small to be measured even. If keep below quoted tolerances will have acceptable beam spot size- see next slide.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 14 Magnetic measurements also measure the angle of the first south pole of any multipole, relative to horizontal axis The multipole angle measurements indicate there is significant skew sextupole mixed in with the normal sextupole. Glen White has modelled the beam passing through QF1 & QD0 [mean and rms from 100 seeds]: –36.7 +/- 0.4 nm spot with perfect quads -> 42 +/- 4 nm with these multipoles, and no re-tuning –Glen is confident that when the FD sextupoles strength and roll (using their magnet movers) are adjusted to compensate for the unwanted sextupoles in QF1 & QD0 then the spot size will be restored.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 15 Measured Diameters and Adjacent Pole Gaps on QF1: final values measured on a CMM at SLAC & gauge blocks at LAPP No-lead end Downstream Lead end Upstream Units=Inches Units= mm SLAC data LAPP data The diameters and gaps in the table were measured on a CMM, precise to ”. These values agreed with our SLAC gauge block measurements, precise to ” [ mm]. The 4 diameters are within ” [0.0185mm] of each other- this is very good. But the gaps vary by up to ”, this is ~2 times the desired variation. We tried many different bolt torque settings to reduce this variation but could not manage it AND keep the diameters within 0.001”. After air shipping to France, gaps measured again with gauge blocks precise to 0.01mm

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 16 Measured Diameters and Adjacent Pole Gaps on QD0: final values measured on a CMM at SLAC and with gauge blocks at LAPP No-lead end Downstream Lead end Upstream Units = inches Units = mm SLAC data LAPP data The diameters and gaps in the table were measured on a CMM, precise to ”. These values agreed with our gauge block measurements, precise to ” [ mm]. The 4 diameters are within ” of each other- this is very good. The gaps vary by up to ”, this is better than the desired variation of +/-0.001”. The sextupole is a little less in QD0 than in QF1. Indicating less dependence of the sextupole on the gap variation than we predicted. NOTE-names of poles, A,B,C,D are in different positions on QD0 to QF1. After air shipping to France, gaps measured again with gauge blocks precise to 0.01mm

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 17 Mimic a beam based alignment set of currents, measure Y coord of magnetic center at each current Change current here by >20% 105 amps 132 A, 10x 118 A Back to 132 A See next slide for proof the Y coord change is caused by temperature change

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 18 Y coord of magnetic center (microns) variation caused by temperature variation in supports of the rotating coil. X center coord hardly varies during this sequence. Rotating coil is moving during the run- makes it look like magnetic center is moving, but it is not!

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 19 Mimic making small changes in FD quad currents around nominal I Start with I= 132 amps, measure integrated strength, then change current in this sequence: 131,131,132,133,133,132,132 amps and measure integrated strength at each current with rotating coil Result: integrated strength varies by, at most, %-- quite acceptable

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 20 Tooling Ball sockets added & fiducialization has been done Tooling ball sockets tack welded to various surfaces. Some holes to accommodate tooling ball sockets already drilled on top. Fiducialization: worked out where tooling balls are relative to mechanical center. Data will be sent to KEK soon. Top of quads kept clear so MONALISA can be installed later

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 21 An old FFTB sextupole which is now an ATF2 FD sextupole- 2 now at LAPP

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 22 The 2 cooling circuits developed to slip over the coils of the FD sextupoles- shipped to LAPP at end of April. Undo these nuts in order to split the circuit into 2 halves. 1 st circuit had yellow insulating tape over the copper sheets, decided it was not necessary, so 2 nd circuit does not have yellow tape. See next slide for orientation of the circuits and lead pipes

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 23 Photo of cooling circuit installed on a similar sextupole at SLAC Hold the copper plates tight against the coils’ sides with cable tie-wraps Push the custom- made cooling circuit into place by hand (install one half at a time) SLAC sextupole has smaller bore, otherwise exactly same as magnets sent to LAPP from KEK

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 24 Photo of the electrical terminal end of a sextupole with the cooling circuit installed Synflex cooling hoses hook up to these 2 fittings via swivel couplings on hose ends Previously proved that these cooling circuits will keep these sextupoles cool enough.

ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 25 Conclusions on the ATF2 FD magnets designed, prepared & measured by Spencer et al at SLAC; shipped to LAPP at end of April, 2008 Two FD quads have –met their ∫G.dl requirements with small enough ∆temperature –met their stringent multipole requirements; –their magnetic center behavior during beam based alignment is acceptable –their ∫G.dl behavior during 1 amp variations around the operating current is acceptable –Detailed instructions will be provided to KEK to re-assemble the quads after splitting to install the SBPMs- so mechanical symmetry is regained and multipoles kept within specs Two FD sextupoles have –Met their integrated strength requirements [ use old data from when they were measured at SLAC many years ago] –Met their thermal behavior requirements with new cooling circuits