V Energy Facility Contractors Group (EFCOG) Safety Working Group Regulatory & Reporting Technical Subgroup Enforcement Letter: Suspect Documentation October.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Tips to a Successful Monitoring Visit
(Individuals with Disabilities Education Improvement Act) and
Program Management Office (PMO) Design
Radiopharmaceutical Production
1 Government-Industry Data Exchange Program GIDEP as a Resource Presentation for the Code 300 Orientation June 15, 2012 Presented by: Michael J. Sampson,
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
Workplace Safety and Insurance Board | Commission de la sécurité professionnelle et de l’assurance contre les accidents du travail 2014 Safety Groups Advantage.
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
Final Determinations. Secretary’s Determinations Secretary annually reviews the APR and, based on the information provided in the report, information.
Evaluation and Reporting ENTC 4060 Project Scheduling.
Correction of Non-Compliance Prior to Notification Monitoring and Supervision March 11, 2013.
Idaho National Engineering and Environmental Laboratory EFCOG – Feedback & Improvement Subgroup Extent of Conditions Extent of conditions (EOC) are generally.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
What SMS means for an Operator’s relationship with the CAA
MyFloridaMarketPlace Roundtable August 6, 2003 MyFloridaMarketPlace.
WHS Management Plans.
Protection Against Occupational Exposure
U.S. Department of Energy’s Consolidated Audit Program (DOECAP) U.S. Department of Energy’s Consolidated Audit Program (DOECAP) Dr. Todd L. Hardt DOECAP.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Incident Reporting Procedure
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
1 State of Michigan Department of Community Health Bureau of Health Systems Division of Operations Roxanne Perry February 28, 2008.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Day Weighted Resident Rosters New Jersey Department of Health and Senior Services AND July-August 2010.
ISO 9001: 2000 Certified Audit Process What to do.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
NuPAFP Conference October 13-14, 2010 Operational Adjustment Grants.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Operational Experience Metrics Task Team August 7, 2009.
U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Safety Culture in Cooperative Agreements Prepared by Tom Williams Office of the Senior Advisor for ES&H August, 2009.
NCLB Monitoring September 19, 2012 Webinar.
ORNL is managed by UT-Battelle for the US Department of Energy Enforcement Lessons Learned Ergonomic Manual Lifting and Material Handling Investigation.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED Classified Information Security Event EFCOG Fall Workshop.
ORNL is managed by UT-Battelle for the US Department of Energy Enforcement Lessons Learned Unexpected Airborne Release Presented to EFCOG Regulatory &
OSHA Safety and Health Program Management Guidelines
Assessment and Causal Analysis: Enforcement Lessons-Learned ISM Workshop 2007 Tony Weadock Office of Enforcement.
Finance and Administration Developed Using The CAP-USAF Pamphlet 12 and CAP ES materials 6/7/2016NESA 2012 phm1.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Overview of SACS-COC Reaffirmation Process Prepared for Reaffirmation Steering Committee April 10, 2006.
Update on Revision of DOE Order 456.1, The Safe Handling of Unbound Engineered Nanoparticles DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
External Provider Control
Incident Reporting And Investigation Program
Transportation of Class 7 materials: Compliance & Regulatory issues
Readiness Review Course
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Industry Guidance on Part 21 Evaluation and Reporting
Office of Nuclear Materials Safety and Safeguards
School Cleaning Update
Incident Reporting And Investigation Program
Julie Woosley, Division of Waste Management
Chemical Purchasing.
Julie Woosley, Division of Waste Management
Trending Requirements and Results
Quality Assurance in Clinical Trials
Radiopharmaceutical Production
Presentation transcript:

v Energy Facility Contractors Group (EFCOG) Safety Working Group Regulatory & Reporting Technical Subgroup Enforcement Letter: Suspect Documentation October 21, 2015 Alan Duncan Enforcement Coordination Consolidated Nuclear Security, LLC

Event Reporting ORPS NA- -PS-BWP-PANTEX , Discovery of Suspect Supplier Documentation On May 14, 2014 in support of evaluation of a specific container for off-site shipment of components, the Packaging Engineer determined that reports received from the manufacturer were inconsistent and suspect. Subsequent investigation by the Supplier Quality organization determined that inadequate quality controls were in place with regard to the quality assurance documentation system and in particular that the questioned record included a signature from an individual no longer in the employ of the manufacturer. One of several issues raised with the manufacturer was lack of date associated with the signature and inadequate change control practices with regard to the certifications. 4C(2) – Discovery of any other suspect or counterfeit item or material (i.e., not found in a Safety Class or Safety Significant Structure, System, or Component) that is found in any application whose failure could result in a loss of safety function, or present a hazard to public or worker health and safety. NTS-NPO—CNS-Pantex submitted October 2,

Event Reporting ORPS NA- -NPO-CNS-PANTEX , Discovery of Noncompliant Containers As a part of an extent of condition review for the May 2014 noncompliance, certification documentation was reviewed and the review determined that documentation described differing testing conditions between lots. When the requirements were investigated it was determined that some testing results were not in conformance to DOT requirements. 4C(3) – Discovery of any defective item or material, other than a suspect/counterfeit item or material, in any application whose failure could result in a loss of safety function, or present a hazard to public, or worker health and safety. Additional information added to NTS-NPO- -CNS-Pantex

Significance of Conditions The Office of Enforcement guidelines considered the false record created by the vendor a willful act and were reluctant to believe it was isolated. The Office of Enforcement assigns greater significance to the actions of managers and supervisors. The occurrence report identifies the Quality Manager as the individual responsible for the false record. The vendor provides numerous containers in support of the NNSA mission. Customers include Pantex, Los Alamos, Sandia, Y-12, Brookhaven, and Oak Ridge National Lab. Joint investigation of record-keeping revealed that the wrong calculation had been used in support of United Nations stack weight certifications. Use of many containers was suspended pending recertification affecting shipments complex-wide. On May 30, 2014, the Pantex PAAA Department tracked the issue pending outcomes of the initial investigations, but facts in the initial occurrence report reveal a reportable condition, a willful act. Discussions with the Office of Enforcement began in July. A Noncompliance Tracking System report was submitted October 2, A delay in reporting may have been part of the Office of Enforcement considerations. 4

Timeline 2007 order containers June 2007 receive containers At some point after receipt of the containers the related project was removed from the schedule. April – May 2014 Packaging Engineer begins evaluation of containers in preparation for the rescheduled project. May 14, 2014 Packaging Engineer notifies Supplier Quality of suspect documentation. May 15, 2014 Shipments involving this container type were suspended. May 21, 2014 Site Investigation of Vendor May 29, 2014 Site Investigation of Vendor Published May 30, 2014 PAAA initial screening was to locally-track and monitor the PER for developments pending receipt of the site investigation. July 1, 2014 Transition to M&O Contractor Consolidated Nuclear Security is complete. July 1, 2014 CNS sustains the suspension of shipments. July 2014 PAAA revisits screening determination and recommends reporting to management. July – August 2014 discussions with management regarding reporting an issue for a previous M&O. 5

Timeline August 20, 2014 contact with the Office of Enforcement regarding reporting an issue for a previous M&O. August 21, 2014, following review of the Occurrence Report, Office of Enforcement requests additional information regarding the screening and reporting determinations. Questions directed at how a determination of “not willful” was made. August 22, 2014 provide additional information and receive request for the Investigation Report. Begin coordinating draft NTS report. September 2, 2014 provided Investigation Summary to the Office of Nuclear Safety Enforcement. October 2, 2014 submit NTS report. October 6, 2014 visit to contractor to discuss the Office of Enforcement interest and path forward. October 8, 2014 requests copies of causal analyses and corrective action plans from the M&O and vendor. October 29, 2014 Office of Nuclear Safety Enforcement requests a visit so that an open discussion may occur regarding potential container contents and hazards. November 12, 2014 occurrence report regarding testing methods. December 5, 2014 provided documents to the Office of Nuclear Safety Enforcement: Characterization of container content for containers provided by this vendor, Initial Causal Analysis, and Formal Causal Analysis and Corrective Action Plan 6

Pre-Visit Activities Obtained information regarding the Office of Nuclear Safety’s Areas of Interest. Use and potential use of the containers. Vendor recognition of significance Met with the Site Manager and Issue Owner to discuss the scope of interest. Worked through Procurement to notify the vendor and requested their participation. Identified Site Participants. Arranged a facility tour. Took the opportunity to provide Rich and Kevin with contextual information about Pantex including a site tour and meetings with personnel key to assuring Nuclear Safety at the Site. 7

Pre-Visit Activities Prepared a list of anticipated questions and gathered responses. Coordinated the responses to assure accuracy. Distributed the questions and responses to participants. Conducted a Dry Run. Dealt with last minute resolution of vendor concern regarding acceptance of their corrective action plan. 8

Conduct of Fact Finding Visit Discussions Office of Nuclear Safety Enforcement Participants Rich Day Kevin Mattern Site Participants NPO Enforcement Coordinator Representatives of Supplier Quality Representatives of Packaging Engineering Representatives of Transportation Logistics (responsible for DOT Compliance) Representatives of Contractor Enforcement Coordination Manager, Mission Assurance Pantex Site Manager (Welcome and Out Brief) CNS CEO (Out Brief) Legal Vendor Participants Owner Second in Command 9

Conduct of Fact Finding Visit Discussions Office of Enforcement provided a brief introduction. Introductions of Participants Summarized the timeline of discoveries Discussed the compensatory and corrective actions. Allowed a designated time for conversation between the Office of Nuclear Safety Enforcement and the Vendor. (Enforcement Coordinator and NPO Enforcement Coordinator were present) Discussion was free flowing with the Office of Enforcement asking questions throughout the discussion. Maintained focus of noncompliant conditions and their effect on safety. Very prepared and very professional. 10

Enforcement Process Timeline May 14, 2014 – Identify potential concern regarding paperwork May 21, 2014 – Submit Occurrence Report May 30, 2014 – Initial screening as locally-tracked, monitoring August 20, 2014 – Initial Contact with Office of Enforcement September 2, 2014 – Provided the M&O’s Vendor Investigation Report October 2, 2014 – Submit NTS report October 30, 2014 – Request for Visit December 5, 2014 – Provide Causal Analysis and Corrective Action Plan December 15-16, 2014 – Site Visit March 2, 2015 – Provided draft Enforcement Letter for review April 6, Enforcement letters to vendor and to CNS/B&W Pantex 11

Enforcement Letter Enforcement Letter to CNS commends actions taken by CNS and B&W Pantex to identify the issues, questioning attitude compensatory measures communication with other contractors using the vendor effective communication with the Office of Enforcement Intended and received as a “positive enforcement letter.” NPO counterpart encouraged the preparation of the letter to note the actions taken by B&W Pantex and CNS. The unique condition of a “positive enforcement letter” resulted in the opportunity for the M&O to review the draft. 12

Lessons Learned 1.Initial responses by the issue owner are the primary focus of the commendation from the Office of Enforcement. Most of these actions took place before screening and reporting determination. 2.We should have monitored the development of information more effectively and been more timely in reporting. 3.Report for the previous M&O contractor, especially if the new M&O contractor will be responsible for implementing any portion of the corrective actions. 4.Phone calls to the Office of Nuclear Safety Enforcement to request advice were very revealing regarding perceived significance and helpful in making the reporting determination. 13