Doc.: IEEE 802.11-09/0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1462r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Advertisements

Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /0421r1 Submission May 2009 Bruce Kraemer, MarvellSlide 1 TGn Meeting Report - May 09 ‘09 Date: 2009-May-09 Authors: 5488 Marvell Lane,
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGai Closing Report
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z conditional approval report to ExCom
TGaf Waikoloa Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGs Montreal Closing Report
HTC 34; 5656 AE Eindhoven, the Netherlands
TGn Opening Report - Jan 19 ‘09
TGn Closing Report Vancouver, BC, Canada 802 Plenary
IEEE TGai Closing Report
TGaf San Antonio Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
802.11bd Timeline Date: Authors: January 2019
TGn Closing Report Los Angeles, CA, US 802 Interim
TGaf Waikoloa Closing Report
TGn Meeting Report - July 13 ‘09
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Opening Report - Jan 19 ‘09
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGaf Orlando Closing Report
TGn Closing Report Orlando, FL, US 802 Plenary – March ‘07
TGn Closing Report – September 24 ‘09
TGn Meeting Report - May 09 ‘09
PAR Extension Motions Date: Authors: July 2016 Name Company
January 2012 doc.: IEEE /0179r1 Jan 2012
IEEE TGai Closing Report
TGn Closing Report - July 19 ‘07
04 June 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4g SUN Timeline Proposal] Date Submitted:
TGbd Closing Report – Vietnam
Presentation transcript:

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell Lane, Santa Clara, CA, Name Company Address Phone Bruce Kraemer Marvell

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 2Bruce Kraemer, MarvellSlide 2 Status Summary Comment Resolution Complete Balloting Complete EC presentation package complete Preparing for July 31st submissions in preparation for Sept 9,10,11 PatCom,RevCom, Standards Board meetings

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 3 TGn - Sponsor Ballot Recirc #5 IEEE P802.11n 10 day Recirculation Sponsor Ballot #5 asked the question “Should P802.11n Draft 11.0 be forwarded to RevCom?” Ballot Opening Date: Tuesday June 23, :59 ET Ballot Closing Date: Friday July 03, :59 ET RESPONSES: 277 eligible people are in this ballot group. 199 affirmative votes 19 negative votes 17 abstention votes ======= 238 votes received = 86 % valid returns = 7 % valid abstentions APPROVAL RATE: 199 affirmative votes = 91.3 % affirmative 19 total negative votes = 8.7 % negative

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 4 Primary San Francisco Meeting Documents SB #0-5 Comment Composite r16 July Meeting Report r1 Closing Report r0 May Meeting Minutes r0 SB#3 Telecon minutes r0 SB#4 Telecon minutes r0 SB#5 Telecon minutes r0 TGn Draft 11.0 EC presentation r2

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide Timeline – July EC Unconditional JulyJunJulAugSepOctNov EC review Fri Jul 17 Prelim EC package Wed Jun 17 RevCom Package Fri Jul 31 RevCom Meeting Thu Sep 10 StdsBd Meeting Fri Sep 11 Dec Sep Nov Aug Oct Jul 40 days Oct days

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 6 TGn Timeline – Proposal Event NameAccepted Dates Actual Previously Published Proposal PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Dec ‘08 Recirculation Sponsor Ballot Jan ‘09 Final WG Approval Jul ‘09 Final EC Approval Jul ‘09 RevCom/ Stds Board Approval Nov ‘09Sep ‘09 Publication Jan ‘10Nov ‘09

doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 7 July ’09 to Sep ‘09 TGn Teleconference Plan Wednesday Blocking events Topic Meeting chairBridge #Passcode July 15Plenary July 22 EC result Bruce Kraemer July 29 RevCom Pack Bruce Kraemer Aug 05 Aug 12 Aug 19 Cont Process Bruce Kraemer Aug 26 Cont Process Bruce Kraemer Sep 02 Cont Process Bruce Kraemer Sep 09Stds Bd Sep 16 Stds Bd result Bruce Kraemer Sep 23Interim Call number: Call time: 11:00 – 13:00 ET