Chris TuttAMS-02 Phase II Safety Review1 Tracker Alignment System Chris Tutt AMS-02 Project Manager.

Slides:



Advertisements
Similar presentations
Guards Design Specifications guards: Safety Work Instructions
Advertisements

Health & Safety Life Book AM ST p. 1 v.01 - may.05, 2011 Rail Safety Definitions Pedestrian crossing (PC); identified place where pedestrian.
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Chapter 11 Printers. You Will Learn… How printers work and how to troubleshoot them.
 HISTORY  CHARACTERSTICS  CONSTRUCTION  PRINCIPLE AND WORKING  LIMITATIONS  APPLICATIONS.
Series RLC Network An example on how to solve for A 1 and A 2.
POLICY Space Export Controls Update Since Delivering the 1248 Report to Congress - April 2012 −Congress added language into the FY13 National Defense Authorization.
Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.
Orientation Objectives Fundamentals of Laser Operation –film: laser classification system Overview of ANSI Standard for the Safe Use of Lasers Biological.
LASER L = Light A = Amplification S = Stimulated E = Emission R = Radiation.
Review of Helium Venting Analyses
Laser Safety Laser radiation versus “ordinary light” In contrast to light from an ordinary light bulb, laser radiation is generally very focused.  High.
1 LASER SAFETY NSC Clinical and Operational Conference Calls August 24, 2005.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
AAE450 Spring 2009 Kelly Leffel 3/26/09 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control (Day) Kelly Leffel Structures.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Laser Registration and Inspection Based on a building-wide inventory Judi Reilly and Meg Himmel.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Laser Safety Andras Kis Zettl group safety talk 11/16/2006.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
LASER and UV LIGHT SAFETY University of Notre Dame.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
The Spectrum of EM Waves According to wavelength or frequency, the EM waves can be distinguished into various types. There is no sharp boundary.
INTERAGENCY HELITORCH and MIXING SYSTEM TRAINING.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Payload Safety Review Plan and Issues Leland D. Hill.
Composite Overwrapped Pressure Vessels
Laser safety instruction – 2009
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
AdLIGO PSL Safety Plan Peter King LIGO Laboratory – Caltech LIGO/VIRGO March 2007 Lasers Working Group G D.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
1 Module 4 Support Systems. 2 Terminal Objectives Upon the successful completion of this module, participants will be able to explain methods organizations.
1 EstimationStrategies Press Ctrl-A ©2009 – Not to be sold/Free to use Stage 5 Year 9.
Holden Planning. Holden Reflectometry Quantitative Estimate scattering cross-section Selected deuterate Quantitative Estimate Scattering length density.
AMS-02 Ground Safety (Permanent Magnet) AMS-02 Design TIM May 5, 2010.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
Alignment of the CMS Tracker
Light-Matter Interaction
الفيزياء CHAPTER (3) LASER.
Developing Information Systems
Crane safety and inspections
Laser Components.
Systems Design, Implementation, and Operation
Crane safety and inspections
電磁波或光 但如此相干coherent的光很不容易形成! 不相干的光極易發散!
MERIT Beam Collimator Design
Crane safety and inspections
Crane safety and inspections
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
Standard Business Processes
Presentation transcript:

Chris TuttAMS-02 Phase II Safety Review1 Tracker Alignment System Chris Tutt AMS-02 Project Manager

Chris TuttAMS-02 Phase II Safety Review2 Review of Hazard  Hazard to be addressed is uncontrolled use of lasers causing optical damage to personnel or equipment.  Tracker Alignment System (TAS) uses a series of infrared lasers to measure relative movements of the tracker planes.

Chris TuttAMS-02 Phase II Safety Review3 TAS System Schematic

Chris TuttAMS-02 Phase II Safety Review4 Laser Safety Analysis  Nominal Optical Hazard Distance (NOHD) calculated for TAS lasers at three key locations in the system per ANSI standard.  Emission at diode window: 2.78 cm  Emission at LFCR output: 4.64 cm  Emission at LBBX output: 6.81 m  Only LBBX output is significant distance, but that beam is trapped in tracker inner volume.  Tracker inner volume has light-tight vents.  All TAS hardware underneath MLI blankets.

Chris TuttAMS-02 Phase II Safety Review5 Upper LBBXs Installed Position

Chris TuttAMS-02 Phase II Safety Review6 TRD/UTOF Installed Position

Chris TuttAMS-02 Phase II Safety Review7 Lower LBBX Installed Position

Chris TuttAMS-02 Phase II Safety Review8 Lower USS Installed Position

Chris TuttAMS-02 Phase II Safety Review9 LFCR Installed Position

Chris TuttAMS-02 Phase II Safety Review10 Proposed Safety Controls  TAS lasers are low-power, diffuse, and completely contained within tracker inner volume.  No special safety controls are needed during nominal operations.  LBBXs are inaccessible to ground personnel without dismantling payload.  LFCRs are accessible if MLI removed, but any maintenance operations would be done by trained personnel.  TAS system will only be powered on during most of KSC stay.  KSC concurrence documented in Use Authorization K-GU