HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on: https://twiki.cern.ch/twiki/bin/view/CMS/HF_FE_2015irradAtCHARM.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
WORKFLOW IN MOBILE ENVIRONMENT. WHAT IS WORKFLOW ?  WORKFLOW IS A COLLECTION OF TASKS ORGANIZED TO ACCOMPLISH SOME BUSINESS PROCESS.  EXAMPLE: Patient.
Melcotel TM Features and Benefits Melcotel - Introduction New features –Links with up to 250 room units –Settings reset –Automatic switch OFF –Setback.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Irradiation Test of the Omegapix2 Digital Tier May 18-22, 2015, CERN Olivier Le Dortz, LPNHE Paris Juin 2015.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Status of the NA62 network R. Fantechi 23/5/2012.
Highlights from rad-hard measurements DC-DCs in different DC-DCs have been tested so far. Three of them are commercial and were released in May.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
CMS HCAL optical links Eric Hazen (BU), Tullio Grassi (UMD) OptoWG - 28 Sept 2011.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Integrating part of the ATLAS Radiation Monitor will measure
Cabling for LHCb Upgrade
Irradiation test of Commercial (BASLER) digital cameras
Status of the FPGA Firmware of the HF FE
M. Hansen, CERN S. Lusin, CMS TC / UW
Institute of Nuclear Physics Polish Academy of Sciences
HF/HE Electronics Radiation Testing
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
Tile Upgrade Workshop (CERN- February and 9)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
T1 Electronic status Conclusions Electronics Cards:
CMS November Upgrade Week
LHCb electronics, 12th June 2014
Integration – preliminary ideas on routing and tests
CNRAD dosimetry and Summary of the TS
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
Radiation Monitoring in LHC Experiments
TileCal ROD Commissioning Counting Room Installation
Plans for the 2004 CSC Beam Test
Presentation transcript:

HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:

Goals Irradiation test of a HF FE crate with one ngCCM and one or more RM Connections and operations similar to the final system Radiation field similar to operation environment; we asked for: – Dose: 100 Gy – 1-MeV neutron equivalent fluence : 5 x E12 / cm2 – High Energy Hadron fluence : 2 x E10 /cm2 Monitor the behavior during irradiation 2

Plans First irradiation run: June 15th to 19 th ; use one pre-prod RM and one pre-prod ngCCM. Second irradiation run: ~ Oct 2015; use a few production RMs and one ngCCM (pre-prod or prod ?) 3

Arrangement will be similar to Point 5 4 CHARM irradiation area CHARM technical room CHARM pre- installed cables, 30-meter Power supply with I, V logging

Irradiation area 5 Cable chain (carries the cables) Rail for cart (carries the Unit- Under-Test) Cables and Unit-Under-Test are moved to their final position simultaneously.

patch-panel of irrad area 6 We must use the installed cables and connect via existing patch panels (we must adapt to that). UUT (HF FE) Patch panel in irrad area Patch panel in tech room computer Our custom cables CHARM cables Our custom cables HF BE

Garages for multiple chains Loading our cables into a chain is not trivial. Normally one full day is allocated for this operation. After doing that we can leave the cables, in a chain and park it in a garage, for future irradiations. 7

CHARM installed cables end up in the “Technical room” 8

Dry Run Area: has clones of patch-panels 9 = clone of tech room = clone of irrad area Already available to us

CHARM Monitoring & Dosimetry Online measurement of: TID 1-MeV neutron equivalent fluence HEH and thermal neutron fluence A dedicated monitoring tool will allow to: visualize the radiation levels in real time archiving of levels for different runs 10

Schedule for June run As soon as we are ready: begin of dry run 11 June: end of dry-run 12 June : installation of cables into the chain 15 June : start of irradiation 20 June : end of irradiation 11

Manpower We are short on manpower. Sasha no more available after June 11. Josh K. no more available after June 14. Stephen will arrive June 10. Not much volunteering so far. 12

Task list Crate with backplane: take one from bld 904 Turkish QIE-card: at least one available at CERN Pre-prod ngCCM: being prepared at U.VA Optical fibers: arrived, not tested (Tullio) Power cables and connectors: in progress (Sasha) ngCCM “remote jumpers over copper links”: status ? (Stephen +) TMR on QIE-card FPGAs: done, partly tested (Tullio) TMR on ngCCM FPGAs : done on baseboard; mezzanine ? (Stephen) Power Supply: rented from pool (Sasha) Real-time monitor of current, voltage: GPIB SW done (Sasha, Josh) Computer with SLC6: waiting for CERN IP address (Sasha) Move computer to dry run room  new IP address request HCAL DAQ installation: waiting for computer (who ?) ngccm client and server installation: waiting for computer (Alan) Scripts for monitoring: will start from existing scripts (Tote ?) Move computer to technical room  new IP address request Oscilloscope with proper wiring: not started (who ?) 13

The End 14