SM SOUTHERN CALIFORNIA EDISON® CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY Composite Load Model Validation July 24, 2004 FIDVR Event at SCE Valley Substation Jun Wen Southern California Edison June 17, 2015
SM SOUTHERN CALIFORNIA EDISON® Page 2 CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY July 24, 2004 FIDVR Event 5:02 PM July 24, 2014, 115 kV bus connection equipment at Valley Substation failed resulting in a phase to ground fault. The fault cleared in four cycles isolating the number three 500/115 kV transformer bank. Immediately prior to the fault, Valley Substation recorded the load of MW of which 400 MW was lost during the event.
SM SOUTHERN CALIFORNIA EDISON® Page 3 CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY Valley 115 Composite Load Model LONG IDConditionHour (PST) SCI_RES 1 = Normal Summer 17:00 cmpldw "VALLEYSC " "1 " : #9 mva= "bss" "rfdr" "xfdr" "fb" "xxf" "tfixhs" "tfixls" "ltc" "tmin" "tmax" "step" "vmin" "vmax" "tdel“ "ttap" "rcmp" "xcmp" "fma" "fmb" "fmc" "fmd" "fel" "pfel" "vd1" "vd2" "frcel" "pfs" "p1e" "p1c" "p2e" "p2c" "pfrq" "q1e" "q1c" "q2e" "q2c" "qfrq" "mtypa" 3.0 "mtypb" 3.0 "mtypc" 3.0 "mtypd" 1.0 "lfma" "Rs" "Ls" "Lp" "Lpp" "Tpo" "Tppo" "H" "etrq" "vtr1" "ttr1" "ftr1" "vrc1" "trc1" "vtr2" "ttr2" "ftr2" "vrc2" "trc2“ "LFmb" "Rs" "Ls" "Lp" "Lpp" "Tpo" "Tppo" "H" "etrq" "vtr1" "ttr1" "ftr1" "vrc1" "trc1" "vtr2" "ttr2" "ftr2" "vrc2" "trc2" "LFmc" "Rs" "Ls" "Lp" "Lpp" "Tpo" "Tppo" "H" "etrq" "vtr1" "ttr1" "ftr1" "vrc1" "trc1" "vtr2" "ttr2" "ftr2" "vrc2" "trc2" "LFmd" "CompPF" "Vstall" "Rstall" "Xstall" "Tstall" "Frst" "Vrst" "Trst" "fuvr" "vtr1" "ttr1" "vtr2" "ttr2" "Vc1off" "Vc2off" "Vc1on" "Vc2on" "Tth" "Th1t" "Th2t" "Tv" Default data set from LCM tool was used, no data tuning. Fma = , Fmb = , Fmc = , Fmd = Fel = , Fzip =
SM SOUTHERN CALIFORNIA EDISON® Page 4 CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY Measured versus simulated (3 seconds) Total MW of Valley 115 kV load shed experienced : 400 MW Total MW of Valley 115 kV load shed by cmpldw model: 386 MW
SM SOUTHERN CALIFORNIA EDISON® Page 5 CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY Measured versus simulated (30 seconds) Total MW of Valley 115 kV load shed experienced : 400 MW Total MW of Valley 115 kV load shed by cmpldw model: 386 MW
SM SOUTHERN CALIFORNIA EDISON® Page 6 CONFIDENTIAL: FOR INTERNAL PURPOSES ONLY --P--Type-MdName---BUS----NAME----KV---SPREAD fuvacmpldw24160VALLEYSC fuvbcmpldw24160VALLEYSC fuvccmpldw24160VALLEYSC fuvdcmpldw24160VALLEYSC fthAcmpldw24160VALLEYSC fthBcmpldw24160VALLEYSC Simulated Load Loss at Valley Substation