Working Group 1 Synchrotrons/LHC Summary Report Mike Brennan Philippe Baudrenghien Four Talks, and much discussion (LHC)

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Bunch Merging at 24 GeV Goal: 16 Tp per bunch The scheme Set-up problems Result Future work to increase bunch intensity.
S. N. “ Cavities for Super B-Factory” 1 of 38 Sasha Novokhatski SLAC, Stanford University Accelerator Session April 20, 2005 Low R/Q Cavities for Super.
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
AB-RF-FB LLRF Developments at CERN Historic Overview, Highlights, Future Challenges Flemming Pedersen.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
RF Cavity Simulation for SPL
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Simulation of Microbunching Instability in LCLS with Laser-Heater Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
LHC RF re- commissioning for run 2 with planned operation at 6.5 TeV/c and 0.55 A DC current P. Baudrenghien BE-RF with contributions from J.E. Muller,
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
BCC-35 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), S. Rey, D. Stellfeld, D. Valuch, P.Baudrenghien.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
P. Baudrenghien CERN-BE-RF T. Mastoridis California Polytechnic State University, San Luis Obispo, CA Nov 19th, th HiLumi LHC-LARP Meeting1.
LLRF Activities at KEK/J-PARC Zhigao Fang 1 SuperKEKB 2 cERL (compact Energy Recovery Linac) 3 STF (Superconducting RF Test Facility) 4 J-PARC LLRF workshop.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
RF acceleration and transverse damper systems
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
Harmonic system for LHC
Bocheng Jiang SSRF AP group
J. Alexander + Cornell accelerator group Cornell University
Working groups status report on Feedbacks
Longitudinal beam parameters and stability
RF and Sequences Andy Butterworth BE/RF
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Low Level RF Status Outline LLRF controls system overview
Synchronization Process PSB example
Low Level RF Status Outline LLRF controls system overview
Explanation of the Basic Principles and Goals
RF Parameters Calculation for JLEIC Colliders (e Ring)
Presentation transcript:

Working Group 1 Synchrotrons/LHC Summary Report Mike Brennan Philippe Baudrenghien Four Talks, and much discussion (LHC)

1.Development of LLRF control system for J-PARC RCS, by Dr.Tamura Rapid cycling implies 1. High gradient cavities 2. Fast frequency sweep 3. Finemet cavities are the solution 4.Two harmonics are imposed on the cavities simultaneously (Q=2) Direct Digital synthesizers are used to generate the waveforms Feedforward beam loading compensation is used DDS is used to extract the harmonic component of the beam current, up to h=6

2. Experiments of Low Level Control Based on Analog IQ Technique, by Mr. Zhao 1.At the Shanghai Synchrotron Radiation Facility both analog and digital I/Q processing are being considered 2.So far an analog prototype system has been built and tested 3.Some suggestions were proposed on how to extend the bench tests to better simulate a real cavity

3. An IQ-based low-level RF prototype for ALBA, by Mr. Hassanzadegan ALBA is the light source being built in Spain (near Barcelona), 350 meter 3.5 GeV ring Tests of the IQ hardware demonstrate 1% amplitude and 1 degree phase regulation A high-Q pill box cavity has been built and will soon be added to the test setup

4. (Digital version of IQ control for ALBA), by Angela Sarasqueta 1.Rather similar to IQ board reported on by Tony Rohlev 2.Angela invited suggestions by the experts in the house

Issues of particular interest to LHC 1.RF noise and longitudinal emittance control 2.Klystron gain saturation and phase noise remedies 3.Beam Control topics (not presented in talks)

RF Noise Is there an optimal value for rf noise –Too much costs luminosity (bunch lengthening) –Some rf noise may balance synchrotron radiation damping (too small emittance enhances IBS) –There were many opinions about if controlled noise can be beneficial in emittance blow-up –Consensus (perhaps?) that the noise spectrum should be shaped in a controlled way

RF Noise J. Tuckmantel reported on his study (via simulation/analytic calculation) of noise versus synchrotron radiation damping

RF Noise We discussed if narrowband noise and can cause de-bunching Lebedev, “In theory… it’s impossible” Brennan, “In practice…I’ve seen it” Linnear has seen something similar in the SPS (ICFA 2004) Probably some other mechanism is involved, such as IBS or instability De-populated spot in momentum distribution First synchrotron sideband at 4 GHz

Klystron Gain/Noise All agree that the klystron makes phase noise, and we must have feedback to reduce it J. Fox showed how to keep the gain high even when the klystron saturates (linearizer) Philippe B. showed results of tests of direct feedback in reducing phase ripple the “polar loop” has basically the same effect at the linearizer

Beam Control for LHC Loops (store with open or closed loop?) –Phase, programming the gain, opening the loop,… –Radius, used only in commissioning –Synchronization, conflict with phase loop? AC coupled phase loop Cogging –Keeping it adiabatic –Operations interface –Direct measurement (WCMs) of vertex phasing

Beam Control for LHC Technology –Noise floor of phase detecor –Phase noise in VCXO vs state-of-the-art DDS Diagnostics –How do you reduce the flood of data on a fault (post mortem) –Out-of-range trapping should be engineered into firmware designs –Templates of good system states should be readily available Beam Inhibits (not a casual matter) –A 100 Hz frequency jump would de-bunch the beam