PHENIX UPGRADE -2005 Stony Brook Project Hadron Blind Detector Facilities 31Aug05.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

GLOVE BOX For HADRON Blind Detector Upgrade for Phenix Richard W Hutter,5 July 2005 with thanks to Bill Anderson.
Inert Atmosphere Systems in OLED Research and Fabrication Copyright, 1996 © Dale Carnegie & Associates, Inc.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
CsI Photocathode Production and Testing
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Sasha Milov HBD upgarde Feb 8, Assembly and testing facility. Sasha Milov Feb 8, 2005 Glove Box Other needs Testing.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
Hadron Blind Detector:
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Jason Kamin May 17 th, Title Slide!! HBD. Jason Kamin May 17 th, Di-lepton Physics Diverse Physics: –Vector Mesons –Dalitz –Correlated semi-
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
1 Alexander Milov CIPANP06 June 02, 2006 Hadron Blind Detector for PHENIX experiment at RHIC Alexander Milov (for the PHENIX collaboration) Jun 02, 2006.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Sasha Milov Phenix focus HBD June 20, 2006 Hadron Blind Detector for low mass di-leptons in PHENIX Sasha Milov (PHENIX focus on HBD) Jun 20, 2006.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
Initial Performance of the PHENIX Hadron Blind Detector at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration N IEEE Nuclear.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
1 Update from the Tent Thomas K Hemmick for the Tent People.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Stony Brook Update: Ready to Start…
Presentation transcript:

PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05

HBDTasksNotes TENT Cleanout Dc StandsMoving one out DC PrototypeGoing on Display Dc Test TubeRepositioning Change Air Filters First FilterDoneB Gutchow HEPA LightsChange all BubsDoneB Gutchow Air conditionerRepairDone Clean Tent walls Sept Clean Tent Floor Sept

Target Room BigMacOperationalOperational -Kamin/Lefferts Full Solidworks model DoneB. Anderson Chiclet Station Tests done - Working on ImprovementsJ. Kamin Argon Gas System

BigMacOven J. Kamin Designin Process Machine Install Boat Shield Instrumentation Quantum TestDesignHow Many Test PointsB. Anderson Machine Install Electronics CarouselDesignin ProcessR. Hutter Machine Install Modifications Big MACTables rebuild Carriers DesignHow Many Test Points Machine Transfer Box Designin Process Machine Gas System

Glove Box R.Hutter Specifications Done Request for Quote Done Order Installation Testing Gas System N2 Design Machine Cradle R.Hutter Design Machine Install Lighting System R.Hutter Storage R.Hutter Tools Gem Parts HBD Parts Amplification Testing GasHow Many Test Points HV Signal