HPMP PREPARATION EXCOM POLICY AND ELIGIBILITY ISSUES AND INFORMATION REQUIREMENTS.

Slides:



Advertisements
Similar presentations
1 HCFC Phase –out in Air Conditioning Sector Background, Challenges and Progress Sidi Menad SI AHMED 17 TH October 2012.
Advertisements

United Nations Development Programme Elements of HCFC Phase-out Management Plan Sri Lanka HPMP Inception workshop 31 March 2011.
HFC Phasedown Under the Montreal Protocol OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER Mexico, D.F. Canada, Mexico and The United.
INTERNATIONAL SCENARIO HPMP APPROVALS AND TECHNOLOGY.
Technology Options and HPMPs Montreal Protocol and Chemicals Unit UNDP.
FEDERATED STATES OF MICRONESIA Proposition of Policy 1.Necessity 2. Practicability (Feasibility) ; 3. Beneficiality.
Moving existing CFI projects to the ERF. What will be covered in this webinar Main changes in moving from the CFI to the ERF Preparing to participate.
Data Reporting Decisions A presentation prepared by the Multilateral Fund Secretariat Joint Meeting of the Latin American and Caribbean Networks of Ozone.
Global Poverty Action Fund Community Partnership Window Funding Seminar January 2014 Global Poverty Action Fund Community Partnership Window Funding Seminar.
1 New Staff Grants and Returning from Parental Leave Grants: An Overview.
Erik Pedersen, Independent Consultant HFC Management Workshop, UNEP, Paris, July 11-12, 2014.
Developments on the Phase- in of Low GWP Chemicals In Various Polyurethane Sectors Kultida Charoensawad PolyUrethanes Industry Group, Thailand UNEP workshop.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
ROADMAP FOR IMPLEMENTATION OF HCFC PHASE-OUT IN INDIA OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS.
1 UNITED NATIONS DEVELOPMENT PROGRAMME HCFC PHASEOUT PROGRAM INTERDEPENDENCY A COMPLICATION IN HCFC PHASEOUT IN FOAMS.
Welcome to Your Technology Centre SYSTEM HOUSES AND DEVELOPMENT OF low-GWP TECHNOLOGIES HCFC ALTERNATIVES FOR THE FOAM SECTOR TECHNOLOGIES AND EQUIPMENT.
Environmental Coordinating Unit Ministry of Environment, Natural Resources, Physical Planning and Fisheries.
Montreal Protocol Implementation in Sri Lanka- Current Situation and HCFC Phase out challenges Dr W L Sumathipala Senior Technical Advisor Ministry of.
1 North American Proposal for Phasing Down HFCs under the Montreal Protocol Presentation by Canada, Mexico and the United States Main Meeting of Ozone.
Update on alternative technologies and international developments in the Polyurethane Foams Sector.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
1.4.2 Poverty Alleviation Project Planning 1 POVERTY ALLEVIATION PROJECT PLANNING UPA Package 1, Module 4.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
1 POLICIES AND REGULATORY FRAMEWORK FOR ODS PHASE-OUT OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS.
Institutional Arrangements for HCFC Phase-out G.M.J.K Gunawardana G.M.J.K GunawardanaDirector Promotion, Environmental Education & National Ozone Unit.
Research Call Information Seminars Research and Codex Division University Limerick, Thursday 11 th April DAFM Offices, Backweston, Monday 15 th.
INDIAN INDUSTRY PERSPECTIVE ON PHASE DOWN OF HFC S REFRIGERANT GAS MANUFACTURERS ASSOCIATION (REGMA) INDO-US WORKSHOP ON HFCs 18 th February, 2011.
Mahendra Senevirathne Project Coordinator National Ozone Unit Sri Lanka 17 September
Availability of Low-GWP Alternatives Options for Near Term & Longer Term Transitions OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER 6-8.
Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007.
T E A P R T F S u p p l e m e n t R e p o r t, M O P - 2 0, D o h a 1 Supplement to the Report on the Replenishment of the Multilateral Fund for the Period.
M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y , P a r i s 1 TEAP Replenishment Task Force Report Assessment of.
UNEP DTIE OzonAction Branch Compliance Assistance Programme HPMP issues Jim Curlin UNEP DTIE OzonAction Programme Annual Joint Meeting of the OzonAction.
1 Addressing HFC Consumption Under the Montreal Protocol Dr. John E. Thompson Deputy Director Office of Environmental Policy U.S. Department of State.
Presented By: Mukesh Bhuta Vice Chairman - IPUA Stakeholder Workshop on HPMP – 21 st / 22 nd October’ 11.
INDIA HPMP STAKEHOLDERS WORKSHOP OCTOBER 2011, NEW DELHI HPMP OVERARCHING STRATEGY.
© 2015 Universal Service Administrative Company. All rights reserved Applicant Training Fiber Options.
1 IEEE Technology Selection Process Presentation of Contribution C Dan Gal Berlin, September 14, 2004.
Review of decisions of the 64th meeting of the Executive Committee of the Multilateral Fund Presentation by the Fund Secretariat Main Meeting of the National.
Information System Project Management Lecture three Chapter one
Maximising the climate benefits of the HCFC phase-out European Commission 36th OEWG, Paris, 20 July 2015 Lunch time Meeting: The EU amendment proposal:
1 OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS INDIA’S PERSPECTIVE ON PHASE DOWN OF HYDROFLUOROCARBONS (HFCs) UNDER THE AMBIT OF VIENNA.
Item #11 Alternative Approaches for Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s 1 TEAP XXV/8 Task Force Report SUPPLEMENT to the Assessment of.
Update on decisions from the 62 nd Meeting of the Executive Committee with special reference to decisions regarding HCFC phase-out for LVC countries A.
T E A P, R e p l e n i s h m e n t T F, P r e s e n t a t i o n a t O E W G TEAP Replenishment Task Force Report Assessment of the Funding Requirement.
One Team One Vision With Pride The Association of Mine Surveyors of Zimbabwe AGM KARIBA The Association of Mine Surveyors of Zimbabwe AGM KARIBA.
Air Quality Governance in the ENPI East Countries EMISSION INVENTORY September 2012 Chisinau, MOLDOVA.
Training Module: APD Template County APD Process Training November 16, 2007 California Health and Human Services Agency - Office of Systems Integration.
John E. Thompson Deputy Director Office of Environmental Quality U.S. Department of State.
1 Service Center FY2007 Billing Rate Proposal Preparation Training Proposed Policy Revisions & Guidelines for Preparing FY2007 Billing Rate Proposals.
Managing 6(f) Conversions: The Good, the Bad, and the Ugly Greenville, SC September 8-11, 2015.
Update on HPMP preparation Art. 5 and CEIT ECA Network meeting - May 18-22, 2009 Yerevan, Armenia.
INTRODUCTION TO THE MONTREAL PROTOCOL Liana Ghahramanyan NOU of Armenia October 2009 Budapest, Hungary.
Seite MOP and ExCom Decisions on HCFCs Paul Krajnik Federal Ministry of Agriculture, Forestry, Environment and Water Management Chemicals Policy.
UNEP DTIE OzonAction Branch Current work related to ozone- climate linkages HCFC Phase out Management Plans (HPMPs) Information, education, communication.
HPMP PREPARATION IN PROGRESS CONTACT GROUP MEETING ON CERTIFICATION OF REFRIGERATION SERVICE TECHNICIANS AND HPMP PREPARATION IN RUSSIAN SPEAKING COUNTRIES.
Opportunities to Leapfrog High-GWP HFCs when Phasing out HCFCs
TEAP XXV/8 Task Force Report
State Environmental Protection Administration
Overview of Sabbatical Leave Policies and Procedures
What is Project Cost Management?
Pedro Cruz Yábar Brussels, 21st June 2016
DORSETT HOTEL, PUTRAJAYA
Overview of Technical and Policy Challenges in meeting 2020 phase-out targets Annual 2017 Network Meeting of National Ozone officers of South Asia Countries.
ON ALTERNATIVES TO HCFC-141b IN PU FOAM MANUFACTURING SECTOR
CHALLENGES IN MEETING 2020 HCFC PHASE OUT TARGETS
Introduction to HPMP.
South Asia Ozone Officers Network Meeting
Surveys on ODS alternatives
Presentation transcript:

HPMP PREPARATION EXCOM POLICY AND ELIGIBILITY ISSUES AND INFORMATION REQUIREMENTS

1  Consistent with HPMP Guidelines (ExCom Decision 54/39 and Document UNEP/OzL.Pro/ExCom/54/59, Annex-XIX)  Accurate data needed at enterprise-level: - Date of establishment of HCFC-based capacity -Baseline equipment details -Product details including production volumes -HCFC consumption details -Previous MLF assistance -Exports to non-A5 countries -Non-A5 ownership -Alternative technology selected

2 INFORMATION REQUIREMENTS (CONT’D)  Detailed project rationale, description and justification for the proposed conversion (why it is necessary for meeting the country’s compliance targets for 2013 and 2015)  Detailed calculation of incremental capital and operating costs and justification for each line item  Determining eligible costs and funding based on ExCom guidelines For large countries, the above work needs at least one month after all the accurate baseline data is available.

3 ELIGIBILITY  Only capacity established prior to 21 September 2007 is eligible for funding  Enterprise should be in operation for at least three preceding years  Funding is available only for costs in proportion to the A5 ownership.  Funding deducted for exports to non-A5 countries proportionately  Funding is for agreed, eligible and incremental costs, not for all costs

4 ELIGIBILITY (CONT’D)  “Incremental Costs” means costs directly related to phase-out of HCFCs  Enterprise must undertake to bear costs over and above the agreed funding  Total funding is limited by cost-effectiveness thresholds: o Rigid Foams – up to US$ 7.83/kg-ODS o Integral Skin Foams – up to US$ 16.86/kg-ODS o Refrigeration – up to US$ 15.21/kg-ODS o Air Conditioning – N/A

5 ELIGIBILITY (CONT’D)  Incremental operating costs (recurring costs of products before and after conversion), are limited to: o PU Foams – up to US$ 1.60/kg-ODS o Refrigeration – up to US$ 6.30/kg-ODS o Air Conditioning – up to US$ 6.30/kg-ODS  Cost-effectiveness thresholds for overall funding can be increased by 25% if climate-friendly (low-GWP) options are chosen  Funding is provided for permanent HCFC phase- out/reductions (HCFC phase-out has to be permanent at enterprise level – cannot come back again!)

6 THANK YOU! Comments, suggestions and questions welcome