NCSX SHIM ISSUES NOV 5 2007. Outer shim permeability (316L certified) Machining of the initial lot of shims increased the permeability from 1.02 to 1.1-1.3.

Slides:



Advertisements
Similar presentations
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
Advertisements

CanPRO Compact from Nemco The only commercial can opener in the world that opens cans from the side leaving smooth edges on the lid!
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Lucas Air Mass Meter Stripdown sequence and technical information.
Weld Geometry A-B Flange:A Possible Alternate to the Extended Shim/ Double Fillet Weld For welds with overlaps – consider the above to make TIG welding.
Fractography Resource - 1 Examples of Fractography in Other Materials Professor M Neil James Department of.
M ATERIALS E NGINEERING – D AY 7 Complete Strengthening Mechanisms Cold Work Annealing.
Project: – Several options for bid: Bid our signal Develop several strategies Develop stable bidding strategy Simulating Normal Random Variables.
Simulating Normal Random Variables Simulation can provide a great deal of information about the behavior of a random variable.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
Gage Blocks.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Selection Criteria Properties Availability Cost Manufacturability
STA Lecture 111 STA 291 Lecture 11 Describing Quantitative Data – Measures of Central Location Examples of mean and median –Review of Chapter 5.
What is the most Important system on your vehicle?
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
Selection Criteria Properties Availability Cost Manufacturability
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
HKS Analysis Status Report HKS Analysis Status Report Liguang Tang (Hampton/JLAB) Hall C User Meeting, Jan. 15, 2011 HKS has data taken in 2005 (E01-011)
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
NSTX CSU Preliminary Assessment of PFCs Art Brooks December 8,
KDEMO Structural Analysis P. Titus June ! KDEMO coil axisymmetric analysis pfcb 21 1, 1.52,0.70,.9,1.3,8,10 !CS1 2, 1.52,2.10,.9,1.3,8,10 !CS2.
UPDATED Notes from the June 22 Conf. Call on Weld Details, Bushing Details, and C-C Bolts.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Biostatistics Case Studies 2015 Youngju Pak, PhD. Biostatistician Session 1: Sample Size & Power for Inequality and Equivalence Studies.
ME Session #4 Need help - Need a grader Remember about Monday –Be prepared to disclose information sources –Prepare a handout for class if possible.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
ME Session #5 Selection of term projects Assignment#4 : Review of manufacturing processes Presentations of PDS work Material selection Questions.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
One of the more common problems Suppliers can experience is having missing or stuck documents in Caplink. Suppliers usually become aware of the issue.
1 Psych 5500/6500 The t Test for a Single Group Mean (Part 1): Two-tail Tests & Confidence Intervals Fall, 2008.
5.4. Costs, revenues, and profitsQuestion 1 Price of wheat4$ / bushel Price of nitrogen0.1$ / lb Fixed costs50$ / acre Other variable costs60$ / acre Review:
Section 10.1 Confidence Intervals
Copyright © 2006 Pearson Education Canada Monopolistic Competition and Oligopoly 14 & 15 CHAPTER.
HARDWOOD LUMBER.
1 Chapter 9 Hypothesis Testing. 2 Chapter Outline  Developing Null and Alternative Hypothesis  Type I and Type II Errors  Population Mean: Known 
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
Afterglow Studies Eric Torrence University of Oregon 183 nd LMTF Meeting 10 October 2013.
Purpose and Goals of the NCSX Conference Call on Modular Coil Analyses February 25, 2004 ??
Initial Dip testing fiber optic gages in LN2 at MDL
BoltJoin ppt P. Rogoff 3/24/2011. NSTX Supported by P. R. 3/9/2011 Update Ring Bolted Joint Design and Recommend the Joint Geometry using bolts.
SkipLists and Balanced Search The Art Of MultiProcessor Programming Maurice Herlihy & Nir Shavit Chapter 14 Avi Kozokin.
LARP Collaboration Meeting Racetrack Coil Fabrication
NCSX Friction Coating Peer Review March 16, 2007 NCSX.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
Dan Cheng, Maxim Marchevsky 9/9/2014 Copper Plated Trace Development Update.
Status of work on the HOM coupler. 2 nd Harmonic cavity Meeting 11/II-2016 Thermal analyses with shims (Y.Terechkine). Gennady Romanov On behalf of Y.Terechkine.
Factors Affecting Tool Life In Machining Processes
NCSX June 29,2007GJG1 Supporting Slides for D. Williamson & K. Freudenberg Modular Coil Outboard Shims Testing.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Data Screening. What is it? Data screening is very important to make sure you’ve met all your assumptions, outliers, and error problems. Each type of.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
NCSX Major Procurement Status July 20, Steady Progress on C1 and C2 The C1 was transferred to the 5 axis machine last Saturday; finish machining.
First Wall Panel - Overview
MACH 122: Abrasive Machining
Transversal calibration of Geiger Cells
CLIC Common RF-girder study
- How to place an order for standard products -
FRESCA2 Update on the dipole design and new calculations
Selection Criteria Properties Availability Cost
Heat Treatment of Steels
Theory of Industrial Organisation
Cross-section of the 150 mm aperture case
Presentation transcript:

NCSX SHIM ISSUES NOV

Outer shim permeability (316L certified) Machining of the initial lot of shims increased the permeability from 1.02 to Going to a anneal-machine to fat shim (0.010 oversize)-grind to size- alumina coat would reduce the permeability significantly, but probably some would still be above –Zenex uses double disc grinder with ceramic abrasive. –Re-grinding costs ~$30/shim.~800 shims in total; $24K total cost. + $10K for annealing costs –Cannot anneal finished shims – they warp ”. Larry will try machining some 316L shims in house to gain some understanding about why these shims appear to work harden through the thickness. Will re-check Colin’s permeability measurements, also. –May need to set max. cut size for Zenex and may need to visit Zenex to observe how they machine the shims. General plan: proceed with 2 nd and 3 rd bullet –Art will consider results and then we will consider if we should change requirements or not. Art looks at field errors & tries to keep total field in sub-gauss range for permeability effects. ALARA is used for guidance. Alternative: Inconel, but $28/lb, and 30% COE mis-match. Alumina coating might have problems with adhesion.

Shim thickness spectrum adequacy 2 lots of 214 shims uncoated are here (the ones with permeability problems). Cost ~$180 each! –Need about 60 for the first 3 pack. –200 annealed by tomorrow. –Send 200 to Zenex in Patterson. –2-3 wks to grind –4 wks. For coating –2nd batch will follow by a few days. –Should have coated shims roughly by the Holidays. Spectrum of thicknesses per our spreadsheet – biased towards nominal thickness. –URGENT - MV requests A-B predictive gaps to get a handle on thicknesses needed. Tom sent info to Mark; he’s working on it. Art and Tom will review. What if we don’t have enough of the thickness needed? Time to get more is probably ~1 month. –MV thinks he could insert temporary shims and then wedge the castings apart locally to replace them. BUT would delay nose welding until shims are in place. –Larry suggests ordering a second batch after we analyze what we receive in the first batch. Time: probably 1 month.

Flex shim material Av. Sect. stress Peak sect. stress ksi ksi AA AB ~30 39 BC Allow The average section stress has an allowable of 2/3 yield -i.e. 39 ksi; the peak stress has an allowable of 1.5 of 2/3 yield, or yield, which is 58 ksi at 77k., so we're fine with 316L for the present operating scenarios. Also, Kevin is still refining the analyses so these are not absolutely firm numbers. The A-B doesn’t have the same margin – we should make the puck smaller or eliminate it where the local peak stress is. Shoot for matching with A-A.

PF/TF support material ~14,000 lbs. of SS used in structure Stellarator symmetric Current Al structure has insulating breaks. –Cost of fabrication is approx. equal. –Titus raised issue of “squirming” due to COE mismatch. Also listed in Constr. Report as an issue. Free stainless steel plate is available - we think it’s 304L – mu probably around 1.1, but this is “old” plate when Ni wasn’t so high in price – it might have lower mu. Measuring it tomorrow. –Need to check on quantity.