CesrTA Status Report Mark Palmer Cornell University September 2, 2009.

Slides:



Advertisements
Similar presentations
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Advertisements

CesrTA Status Report Linear Collider Workshop of the Americas 2009 Mark Palmer for the CesrTA Collaboration October 1, 2009.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
ElectronsdFud Simulation Work at Cornell Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
C ESR TA R&D Program Mark Palmer for the C ESR TA Collaboration May 13, 2010 ILC PAC Meeting - Valencia.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
LCWA09 – October 1 st S. De Santis Measurements of the Electron Cloud Density by TE wave propagation in Cesr-TA M. Billing, J. Calvey, B. Carlson, S. De.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2nd International Particle Accelerator Conference September 4–9, 2011, San Sebastián, Spain LEPP, the Cornell University Laboratory for Elementary-Particle.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
CesrTA Status and Plans Joe Calvey 10/15/08. CesrTA Status and Plans- CLIC08 Introduction CesrTA is a program to reconfigure the CESR storage ring at.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA E-cloud Activities (Jan. 2009) J.W. Flanagan, KEK.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Mark Palmer for the CESRTA Collaboration
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
Oversea collaborators
CesrTA Status and Planning
Detailed Characterization of Vacuum Chamber Surface Properties Using Measurements of the Time Dependence of Electron Cloud Development Jim Crittenden.
RECENT DEVELOPMENTS IN MODELING
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Recent Electron Cloud Studies at CESR and Future Plans
CESRTA Measurement of Electron Cloud Density by TE Wave and RFA
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
Status of Low Emittance Tuning at CESR TA
CLIC damping rings working plan towards the CDR
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

CesrTA Status Report Mark Palmer Cornell University September 2, 2009

ILC AS-TAGL Meeting2 Overview Recent News –CesrTA Run #4 is in progress August 31 – September 8 14 collaborators visiting for this round of experiments –Next CesrTA Collaboration Meeting – Tuesday, September 8, 5pm US Eastern –The US NSF has invited us to submit a proposal for a continued accelerator R&D program with CESR continuing into FY13 –Next experimental run to take place from mid- November up to Christmas (Nov 17-Dec 23) Followed by Run #6 in early spring 2010 (exact dates to be finalized before LCWA09)

September 2, 2009ILC AS-TAGL Meeting3 CesrTA Run #4 Major Experimental Activities –Electron Cloud Build-up & Mitigation Tests of new EC-mitigating vacuum chambers –Wiggler chamber with grooves (CU-KEK-LBNL-SLAC) –Amorphous carbon coated chamber (CERN) –Grooved dipole chamber (SLAC) –Diagnostic quadrupole chamber Upgraded RFA detectors installed and tested Chicane Studies –Beam Size Monitors High energy x-ray coded aperture optics (4-5 GeV) tested for x-ray beam size monitor Commissioning of electron beam x-ray line underway Upgraded vertical polarizer and interferometer setups for visible light beam size monitors Bunch-by-bunch single-pass beam size measurements for EC instability studies –Ring Optics Commissioning (see summary following page) Provide a range of conditions for EC studies (radiation distribution and stability criteria) Characterization of IBS effects Range of emittances for hardware characterization –Low Emittance Tuning Digital BPM System commissioning (4ns bunch spacing) Integration of data from new instrumentation Machine and Power Issues (eg, 3 power failures)

Lattice [cta_]E[GeV]Wigglers (1.9T/pm)  x [nm] Polarity of Q0 Status 2085mev_ /02.5HFe+/e- inj & e+/e- xBSM bumps 4000mev_ /042VFe+ xBSM bump /no e- 4000mev_23nm_ /023VFe+ xBSM bump/ e- inj 2300mev_ /03.3HFe+ inj/ no xBSM bump 1800mev_ * 1.812/02.3HFe+ inj/ no ramp 3000mev_q0h_ /010HFe+ inj & xBSM bump 3000mev_q0v_ /09.8VFe+ inj & xBSM bump 5000mev_pmwig_ /290VFe+/e- inj, e+ xBSM 5000mev_40nm_ /040VFe+/e- inj, e+ xBSM Orbit/phase/coupling correction and injection but no ramp and recovery In all other optics there has been at least one ramp and iteration on injection tuning and phase/coupling correction All at Q h = 14.57, Q v = 9.62 CesrTA Optics

September 2, 2009ILC AS-TAGL Meeting5 A Few “Log Book” Snapshots center of pole, outer collector center of pole central collector 2500 G FS Cyclotron Resonances Stored Beam During Wiggler Ramp xBSM Single- Pass Measurement Resonant Excitation of Cloud via TE Wave Carrier Signal Amorphous C-Coated VC (CERN) vs Al VC Amorphous Carbon

September 2, 2009ILC AS-TAGL Meeting6 Further Updates More details will be presented at: –CesrTA Collaboration WebEx Next Week Topic: CesrTA Collaboration Date: Tuesday, September 8, 2009 Time: 5:00 pm, Eastern Daylight Time (GMT -04:00, New York) Meeting Number: Meeting Password: cesrta –Damping Ring Sessions at LCWA09