Alain Blondel 4 March 2011 NEU2012 summary NEU2012: towards a concrete proposal by the neutrino community (emphasis on long baseline accelerator expts)

Slides:



Advertisements
Similar presentations
J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Advertisements

ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Alain Blondel MAP review Chicago 2010 International Contributions to Neutrino Factory and Muon Collider Studies R&D Experiments:
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
A. Blondel c/o A. Rubbia NNN06, Seattle Neutrino Beams in Europe -- potential LHC injector upgrade -- CNGS and upgrade considerations -- Superbeams from.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
SPC 17 March 2009 Alain Blondel European Neutrino Oscillation Experiments Towards a roadmap.
Report of the SPC panel on Future Neutrino Facilities R.Aleksan, A.Blondel, P.Dornan, K.Meier/T.Nakada, A.Zalewska, F.Zwirner SPC meeting, Report.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Neutrino Physics Opportunities for Fermilab Steering Group 6/12/07 Andy Lankford UC Irvine.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
Staging of a Neutrino Factory (and beyond…) Mark Palmer Director, US Muon Accelerator Program NuFACT 2014, Glasgow, August 25-30, 2014 NUFACT2014 XVIth.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
NUFACT’06 Summary of working group 1 Neutrino Oscillations Experiments Mark Messier Indiana University August 30, 2006.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Accelerator R&D for Future Neutrino Projects
Alain Blondel. LAGUNA meeting CERN 3-5 March 2011
Alain Blondel 11 October 2010 GDR NEU2012 summary
European Detector R&D: AIDA
EUCARD WP3 -- NEU2012 EUROPEAN NEUTRINO STRATEGY FOR
Accelerator R&D for Future Neutrino Projects
Alain Blondel. EUCARD meeting NEU April 2010
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Alain Blondel 4 March 2011 NEU2012 summary NEU2012: towards a concrete proposal by the neutrino community (emphasis on long baseline accelerator expts) (or: Laguna, EUROnu and others together) NEU2012 is a Network Activity (NA) of the FP7 Integrated Activity EUCARD (European Coordinated Accelerator R&D) Some history: started in 1998 with ECFA study groups Prospective Study of Muon Storage Rings European study of European Neutrino Factory Complex Then BENE network of CARE)  International Scoping Study and input to CERN strategy now NEU2012

Alain Blondel 4 March 2011 NEU2012 summary

Alain Blondel 4 March 2011 NEU2012 summary Prospective study of muon storage rings at CERN, ECFA-CERN CERN (1999) First study group discussion of CP violation in neutrino oscillations ECFA-CERN study of a Neutrino Factory Complex A.Blondel et al., eds. CERN ECFA March First discussion of superbeam/beta-beam/neutrino factory road map ISS reports Accelerator design concept for future neutrino facilities JINST, 4:P07001, 2009 Detectors and flux instrumentation for future neutrino facilities. JINST 4:T05001,2009. Physics at a future Neutrino Factory and super-beam facility Rept.Prog. Phys., 72:106201, Systematic performance comparison, first serious look into detector technologies European Strategy for Future Neutrino Physics YELLOW REPORT CERN Organized by CERN Oct as imput to SPC study (SPC document is given as appendix) Kickoff at CERN March Neutrino detector studies and possible experiment at CERN PS NEU Doing the best of existing infrastructures in Europe and at CERN References and Links

Report of the SPC panel on Future Neutrino Facilities R.Aleksan, A.Blondel, P.Dornan, K.Meier/T.Nakada, A.Zalewska, F.Zwirner Report from the SPC: CERN/SPC/940 CERN/ Relations between CERN and the ongoing development work regarding future neutrino facilities. I. Summary -- Annex: Relations between CERN and the ongoing development work regarding future neutrino facilities. II. Supporting document The final report is signed by the SPC as a whole and published as conclusions of the workshop on European Strategy for Future Neutrino Physics YELLOW REPORT CERN

The work of the panel: The initial observation (March 2009) was as follows: 1.there is no more a neutrino physics group at CERN 2.there are a number of accelerator activities -- CNGS -- EUROnu-related -- Linac4, SPL and other LHC injectors design but they are not coordinated 2’ and detector activities (MINOS, OPERA, T2K, AIDA, (GLACIER, LENA, MEMPHYS) LAGUNA) 3. there are quite strong activities happening outside of Europe: T2K, NUMI (MINOS and NOvA), DUSEL, NFMCC 4. even inside Europe there are activities in neutrino oscillation physics with which CERN has little association (DCHOOZ, solar neutrinos, MICE, UKNF etc…) Yet Neutrino physics is important and Europe should remain major player

SPC meeting, Main Conclusions Neutrino physics provides unique window on physics beyond the Standard Model; what is learned with neutrinos cannot be learned at the high energy frontier (LHC, LC), although we may be very lucky and discover a connection between the TeV energy frontier and the neutrino paradigm. and There is a large active European community taking this challenge MINOS OPERA ICARUS DCHOOZ T2K EMMA, MICE, MERIT, EUROnu (LE superbeam, Beta-beam, Neutrino Factory) GLACIER, MEMPHYS,LENA (LAGUNA) AIDA(MIND&TASD) (Count at time of SG2006 was around 500 physicists)

T2KK: T2K 1.66 MW beam to 270 kton fid volume Water Cherenkov detectors in Japan (295km) and in Korea (1050 km); DUSEL: a WBB from Fermilab to a 300 kton WC in Dusel (1300km); SPL 4 GeV, EU-BB and BB+SPL: CERN to Fréjus (130km) project; NF bl is the Neutrino Factory baseline (4000km and 7000km baselines) and NF Py+INO represents the concrete baseline from CERN to Pyhasalmi mine in Finland (2285 km) and to INO in India (7152 km); PS2-Slanic is a preliminary superbeam study at 1500km based on an upgrade of PS2 to 1.66MW and a 100kton Liquid Argon TPC SPC meeting, Figure 2 A representative compilation of sensitivities of some future long baseline projects. Here the fraction of  CP where CP violation can be observed at 3 standard deviations is plotted as a function of  13.

Similarly for the sign of  m 2 13 From the IDS-NF draft report clearly the neutrino factory is very powerful – optimization of distance and muon energy is still open

Long term strategy planning It is unrealistic to expect to have a high intensity neutrino source of any kind in Europe before early 2020’s. By this time it is reasonable to expect that there will be many years of operating and upgrading Superbeams in Japan and in the USA. This should be closely followed. Thus if Europe is to be competitive in the 2020’s it should concentrate on the R&D for a new intense source, i.e. the Neutrino Factory or the Beta Beam. It would be advisable to systematically review the progress and prospects of this work. SPC meeting, SPC report

Nominal performance p.o.t./yr = 324 kW x 10 7 s

Operating a High Intensity Facility

NB similar limitations apply to beta-beam using SPS achieved =

comments on CNGS 1.CNGS is the most super of today’s superbeams. However…. there seems to be little interest in the CNGS beam as is beyong OPERA. Main limitations being a) absence of near detector, b) high energy and c) intensity limitations. Beam needs to be rebuilt for e.g. electron neutrino search. 2. May as well build a new one pointing at either -- location >>1000km (where CP violation and matter effects can be separated)  fine grain detector: segmented scintillator or liquid argon may as well foresee neutrino factory-type baseline (> 2000km) energy ~ 4 GeV  PS2 superbeam and/or neutrino factory -- or << 300 km where matter effects are small and water Cherenkov is very good also consistent with beta beam energy < 600 MeV  SPL superbeam or/and beta beam summary:

E_peak d off (m) Most likely Energy vs off axis distance at 127m ND station

12m 4m 8m 1m Magnetized Iron Muon Spectrometer Fully active segmented scintillator Could be vertical WHAT IS THE FID. VOLUME? A very sketchy and “obvious” proposal for near detector

INO (Mondal)

Conclusions on PS neutrino beam associated questions 1. a more general dual issue: -- can near-detector be identical from far-detector? -- can near-detector be different from far-detector? 2. to do the sterile neutrino search right is a very substantial effort (~10y) and may divert from the long term goal

Test beam in H8 beam line will come back to this in AIDA talk

TEST BEAM Seems an obvious case: around H8 magnet test WC, LArg and TASD prototypes with the MIND prototype as muon catcher/spectrometer -- TASD (and LArg?) in magnetic field? Already some money from AIDA for some basics action: draft proposal by end of november 2010 submission end of year closure of CERN beams in 2013 forces us to recast program 2010 write proposal to CERN for use of test beam before Xmas 2011-Q1 kick off meeting first test with baby-INO but need muons of 1-2 GeV… construction and cosmic tests of TASD and MIND detectors 2014 fuller tests in NH

EURO EURO superbeam (pion decay) Beta-beam rad-ion decay Neutrino Factory (muon decay) key question for CH groups: can any of this be at CERN?

BETA BEAM Idea born at CERN (Zucchelli) and very much studied at CERN within a Nuclear Physics design study, EURISOL see talk by Elena Benedetto. In SPS, only up to  = 150 ( 6 He) / 250 ( 18 Ne) can be accelerated  low energy (max 600 MeV) neutrinos. SYNERGY WITH SPL FREJUS. -- main issues  18 Ne production (getting there!)  irradiation in the various existing accelerators and in the storage ring (the nominal intensities of ~ per year and 18 nuclei per ion are similar to the CNGS per year… and all that is dumped in the storage ring – may require remote handling) 8 Li and 8 B are also considered Q~15 Mev instead of 3 for the baseline ions  higher energies but intensity needed is proportionally increased (see AB NUFAT07, Pilar Coloma NUCFACT10 )

High-power target. 4MW. good transmission MERIT experiment (CERN) Major challenges tackled by R&D expts Fast muon cooling MICE experiment (RAL) Fast, large aperture accelerator (FFAG) EMMA (Daresbury)

Alain Blondel NUFACT10 MUMBAI 23 October st June 15:55 21 st June 22:37 22 nd June EMMA Start-up EMMA Start-up YAG screen images Control room ~22:45 End of 4 sectors

Alain Blondel NUFACT10 MUMBAI 23 October 2010  Incoming muon beam Variable Diffuser Beam PID TOF 0, TOF 1 Cherenkovs Trackers 1 & 2 Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2, KL EMR RF cavitiesRF power Spectrometer solenoid 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils MICE Collaboration across the planet

Alain Blondel NUFACT10 MUMBAI 23 October 2010 m. apollonioNuFact10 - Mumbai7 Muon Cooling MICE Muon Beam Line Commissioning Phase Conclusions GVA1TOF0TOF1 Luminosity Monitor ISIS Sector 7 Beam Loss Monitor Ckov a,bBPM2TOF2KLBPM2 TOF1

Alain Blondel NUFACT10 MUMBAI 23 October 2010 Splash velocity – 24 GeV beam t=0 t=0.175 ms t=0.375 ms t=0.050 ms 20TP, 15TV = 65 m/s t=0 t=0.175 ms t=0.375 ms t=0.075 ms 10TP, 10TV = 54 m/s April I.Efthymiopoulos, CERN MERIT EXPERIMENT at CERN BNL, MIT, ORNL, Princeton University CERN, RAL Demonstrated liquid mercury jet technology for neutrino factory and muon collider up to 8MW on target Oct22-Nov

Alain Blondel NUFACT10 MUMBAI 23 October 2010 Powder –Rig at RAL contains 150 kg Tungsten –Particle size < 250 microns Total ~8,000 kg powder conveyed –90 ejection cycles –Equivalent to 15 mins continuous operation Batch mode –Test out individual handling processes before moving to a continuous flow loop Suction / Lift 2. Load Hopper 3. Pressurise Hopper 4. Powder Ejection and Observation Powder target: Possibly a solution for both Superbeam and neutrino factory

Alain Blondel 4 March 2011 NEU2012 summary TOWARDS A ROADMAP DOCUMENT to be delivered as input to strategy group work based on roadmap proposal by S. Pascoli

Alain Blondel 4 March 2011 NEU2012 summary 1.motivation for neutrino physics -- why we should study neutrino physics no matter whether there is supersymmetry, Higgs, at LHC – or not. -- LHC and neutrinos 2. Accelerator technologies towards future neutrino beams -- R&D development from present accelerator technologies -- far-reaching R&D that is done, planned and not done -- critical R&Ds and show stoppers. 3. Detector technologies in future neutrino experiments 4. neutrino installations and safety & environmental issues -- high power superbeam and neutrino factory targets -- beta beam accelerators and storage rings -- detector issues 5. Existing facilities -- CNGS and its future -- or another SPS-based power-beam -- other possibilities 6. European neutrino physicists in international collaborations -- running experiments -- R&D and design studies 7. Synergetic staged options exist in Europe (have both mid- and long term perspectives) -- Option I SPL Superbeam to Fréjus + Beta-beam to Fréjus -- Option II SPS Powerbeam then neutrino factory to Pyhasalmi 8 Process considerations. This will be very much the agenda of the next NEU2012 meeting at PARIS on 10 May Do come in numbers to form consensus.

Alain Blondel 4 March 2011 NEU2012 summary There is a large active European community working on neutrino long baseline experiments, and accelerator & detector R&D MINOS OPERA ICARUS DCHOOZ T2K EMMA, MICE, MERIT, EUROnu design study (LE superbeam, Beta-beam, Neutrino Factory) GLACIER, MEMPHYS,LENA (LAGUNA) AIDA(MIND&TASD) … (there is more than liquids!) CONCLUSIONS We are making some progress towards a more unified strategy for the future of European Neutrino experiments, to be carried out in Europe or elsewhere within international collaborations. The next step is to prepare the input to the CERN strategy process (we did quite well in 2006) It is a positive sign that synergetic staged options exist in Europe with both mid- and long term perspectives