Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.

Slides:



Advertisements
Similar presentations
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Advertisements

Ion Accelerator Complex for MEIC January 28, 2010.
Application of cooling methods at NICA project G.Trubnikov JINR, Dubna.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
17-Nov-2004G.S.F.Stephans Exploring the Phase Diagram of Strongly Interacting Matter Exploring the Phase Diagram: The RHIC Contribution  RHIC is currently.
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department Workshop on Future Prospects in High Energy QCD.
Winter Workshop, San Diego Mar 16, 2006Angelika Drees Short- and Long-term Future of RHIC Introduction Luminosity, Luminosity Limitations Runs so far and.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Copyright, 1996 © Dale Carnegie & Associates, Inc. Intra-beam Scattering -- a RHIC Perspective J. Wei, W. Fischer Collider-Accelerator Department EIC Workshop,
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
RHIC Low-Energy Au Test Run Summary Todd Satogata L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, B. Christie, A. Drees, A. Fedotov, W. Fischer,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Optimization of the Collider rings’ optics
Test of Optical Stochastic Cooling in CESR
Beam-beam effects in eRHIC and MeRHIC
Test of Optical Stochastic Cooling in CESR
Large Booster and Collider Ring
eRHIC with Self-Polarizing Electron Ring
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
MEIC New Baseline: Part 10
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Summary of Working Group 1
HE-JLEIC: Boosting Luminosity at High Energy
Alternative Ion Injector Design
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Some Thoughts on the JLEIC Ion Injector
SC Magnets with Small Apertures for JLEIC*
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover the QCD Critical Point at RHIC?” Workshop March 9, 2006 Scope and History Initial Machine Projections Operational Challenges Recommendations

March 9, 2006T. Satogata - RHIC Low-Energy Operations2 ScopeScope  The workshop is motivated by a growing body of theoretical and experimental evidence that the critical point on the QCD phase diagram, if it exists, should appear on the QGP transition boundary at baryo-chemical potential ~ MeV, corresponding to heavy ion collisions with c.m. energy in the range  s= GeV/u.  Beam total energy in RHIC of GeV/u RHIC momentum aperture typically 1-3x10 -3  Assume Au as the primary, but not necessarily only, species 2.5 GeV/u total energy scales very badly as Z/A increases  For reference, normal Au injection total energy is 9.8 GeV/u Can likely inject up to ~12GeV/u  Provide projections, identify primary challenges  Below injection energy: field quality, IBS, emittance, cooling  Above injection energy: ramping, transition energy

March 9, 2006T. Satogata - RHIC Low-Energy Operations GeV/u Au collisions  2 days of 9.8 GeV/u collisions  0.4  b -1 integrated luminosity   *=3m by necessity  minute stores  56 Au bunches, 0.6x10 9 /bunch  Hz ZDC rates  IBS and aperture dominated beam and luminosity lifetime  Another run at this energy may improve this by factor of 2-5  x10 9 /bunch  Raise  * to improve lifetime  RHIC is best used as a storage ring collider below beam energies of ~12 GeV/u

March 9, 2006T. Satogata - RHIC Low-Energy Operations4 Initial Machine Projections  Scaling laws apply above injection energies  When aperture dominated:  Peak luminosity   2  No clear scaling laws apply below injection energies  Injected beam already fills aperture  Magnetic field quality degrades very quickly  Power supply regulation  Strawman model  Peak luminosity   3-4

March 9, 2006T. Satogata - RHIC Low-Energy Operations5 Initial Machine Projections ModeBeam Energy [GeV/u] N bunches Ions/bunch [  9 ]  * [m] Emittance [  m] L peak [cm -2 s -1 ] Au-Au  Au-Au  Au-Au  Au-Au  Au-Au   Assumes expected luminosity scaling as  3 below 9.8 GeV/u   */aperture and integrated luminosity tradeoffs must be studied  Projections do not include potential improvements  Electron and stochastic cooling (peak and integrated luminosity)  Lattice modifications to mitigate IBS (integrated luminosity)  Total bunch intensity from vacuum improvements (peak luminosity)  Small set of specific energies (and species?) should be a workshop deliverable for planning

March 9, 2006T. Satogata - RHIC Low-Energy Operations6 Low-Energy Magnetic Field Quality  Magnet currents scale with rigidity B  which scale with   Field quality deteriorates rapidly at very low currents  Currently have no magnet measurements at very low currents, few at low energy  Must extrapolate field behavior for simulations  Low-current magnet measurements are a priority Total Energy  BB Dipole Current 9.8 GeV/u A 2.5 GeV/u A

March 9, 2006T. Satogata - RHIC Low-Energy Operations7 Power Supply Regulation Issues  Several power supply issues  Chromaticity sextupoles  Main power supplies  Sextupoles: A -> A  CMOS regulation, works to 0.01 A  Study option of using only some sextupoles with higher current  Aperture and lifetime concerns  Correction of large main dipole b 2  Main dipoles: 430 A -> 110 A  Requires testing to check regulation  Will test during Run6 maintenance  Pulsed injection/extraction kickers  May have low-voltage limitations

March 9, 2006T. Satogata - RHIC Low-Energy Operations8 Other Issues for Beam Energies GeV/u  Injector issues (also covered by Nick Tsoupas)  Au at 2.5 GeV/u is above AGS injection energy (1.0 GeV/u)  AGS Au transition energy is 8 GeV/u  AGS/ATR extraction aperture dominated by G10 kicker  IBS growth rates (from Alexei Fedotov)  Consistent with 30-minute stores at 5 GeV/u  Lower energies likely require cooling or lattice modifications Beam Energy [GeV/u] IBS growth time [s] (horizontal) 2300 (longitudinal)

March 9, 2006T. Satogata - RHIC Low-Energy Operations9 Beam Studies for Low-Energy Injection  ~1 day of studies required in run before low-energy operations  Initial studies  Trivially scale nominal injection to lower energies  Provides reality check of power supplies, optics  Test injection, establish circulating beam, optimize lifetime  Initial global optics measurements, field quality, tune scan, energy resolution/momentum aperture  IBS growth time study require 3-6 hours extra time All but IBS growth evaluation can be done with Run6 p  Later studies  IBS modification lattice development  Field quality and detailed optics measurement/correction

March 9, 2006T. Satogata - RHIC Low-Energy Operations10 Issues for Beam Energies GeV/u  Raising RHIC injection energy  Limited by injection kicker performance, ~20% increase feasible with 55 bunches  Higher energies than ~12 GeV/u require RHIC ramping  Squeeze  * with acceleration to maintain constant aperture  2-3 days of setup per energy is probably sufficient  Optimize operations for length of stores/ramping time  Nominal RHIC transition energy:    21.3 for Au  Operation at  near   is infeasible  Lattice modifications using   -jump power supplies Successful in Run 6, lowered   by ~1 unit

March 9, 2006T. Satogata - RHIC Low-Energy Operations11 Transition Energy Modification  For Run 6, transition energy was successfully modified  Lowering polarized proton injection energy for spin matching  Nominal    23.5, modified    22.8  Primarily changes horizontal dispersion, momentum aperture  No effort to tune dispersion matching, limit triplet dispersion Modified Nominal

March 9, 2006T. Satogata - RHIC Low-Energy Operations12 Cooling at Low Energies  Stochastic cooling is feasible but requires development  Different mixing regime than high-energy stochastic cooling  Cannot use filter cooling, as Schottky bands overlap  Higher cooling rates at lower energies, but requires different method Cooling rate estimates under development  Palmer cooling  Under active development at C-AD as frontier of cooling Will test cutting chord from pickup to kicker in Run 7  Requires new cold pickup in arc (high dispersion, low beta)  Concerns about 10 Hz coherenct signal rejection  Electron cooling discussed in Alexei’s talk

March 9, 2006T. Satogata - RHIC Low-Energy Operations13 SummarySummary  No apparent show-stoppers for RHIC collisions at  s=5-50 GeV/u  Lattice modifications to suppress IBS should be studied  For beam energies GeV/u, luminosity scaling is uncertain  Field quality at very low currents should be measured/modeled   *=10m likely required for reasonable lifetime/aperture  IBS drives very short store times (<30 min) below 4-5 GeV/u  A ~1 day study period in preceding run will be very beneficial Identify power supply, lifetime, tuning issues/limitations  Above GeV/u, luminosity scales as  2 with constant aperture  Study transition energy changes Required to avoid ~3 GeV transition “hole” around GeV/u  Very similar to normal heavy ion operations, 2-3 days setup/energy  Low-energy cooling  Stochastic Palmer cooling under development, unknown cooling time  Electron cooling is quite promising (see A. Fedotov’s talk)