2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.

Slides:



Advertisements
Similar presentations
1 Possibilities of ILC parameters optimization with crossing angle SLAC, June 27, 2006 P. Raimondi, M.Pivi, A.Seryi.
Advertisements

SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
July 24, 2008Super-B Mini-MAC MeetingPage 1 Super-B Overview John Seeman Accelerator Systems Division SLAC.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
Linear Super-B Factory Progress John T. Seeman FPCP Workshop Vancouver BC April 9, 2006.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
3 rd workshop on SuperB 06.14,2006 SLAC Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Overview and goals 3rd Workshop on SuperB.
Status on SuperB effort SLAC, June 14, 2006 P. Raimondi.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
Status on SuperB effort Frascati, March 16, 2006 P. Raimondi.
SuperB Design Progress Paris, Jan 27, 2007 P. Raimondi for the SuperB Team.
New Ideas for a Super B Factory Steve Playfer University of Edinburgh ILC Forum, Cosener’s House, May 2006.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
ITEP Meeting 07.25,2006 Moscow Marcello A Giorgi1 ITEP Meeting on the future of heavy flavour physics July 24-25,2006 Marcello A. Giorgi Università di.
Status on SuperB effort Daresbury, April 26, 2006 P. Raimondi.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
2 nd workshop on SuperB 16.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Status of the art 2nd Workshop on SuperB.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
A.Variola B. What is the ‘crab waist’ scheme? And why does it make a high luminosity factory possible? Machine parameters ILC & SuperB.
Prospect for an high energy factory at LNF P. Raimondi LNF Apr-10,2008.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Design and Parameters for a linearly colliding Super B-FACTORY
M. Sullivan International Review Committee November 12-13, 2007
Update on B and Phi Factories
Crab Waist Collision Studies for e+e- Factories
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
Report on ILC and SuperB work at LNF
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
The PEP-II Interaction e+e- Factories Workshop
3rd Workshop on SuperB SLAC June , 2006
SuperB project. Injection scheme design status
BINP Tau-Charm Project
Marcello A. Giorgi Università di Pisa & INFN Pisa
SuperB Accelerator Overview and Status
Comparison of the final focus design
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Beam-beam simulations with crossing anlge + crab-waist
Accelerator R&D Results from the B-factory
V SuperB Workshop ENS May 9-11, 2007
AC Power for a Super-B Factory
Summary of Washington DOE Review
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
Super-B Factory in a “4400m” Tunnel
Cost Algorithm for a Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
J. Seeman Perugia Super-B Meeting June 2009
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Beam-beam simulations
Presentation transcript:

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI March 2006

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi2 OUTLINE More on physics case at Super Flavour Factory Status of the art Goals of the workshop From my opening talk

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi3 From Physics presentation M.Ciuchini

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi4 Olympic medals Beam Polarization Run at 4.0 GeV M.Ciuchini

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi5 ON THE MACHINE Pantaleo has presented the results of simulations on various possible designs. John has presented a solution possibly making use of he present PEPII setup and components (including the tunnel)

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi6 Machine design under discussion USE of ILC DR + ILC FF Requires virtually no R&D -Uses all the work done for ILC -Ring and ff layouts virtually done, 3km circunference rings -100% Synergy with ILC -IR extremely simplified m straight line -Beam stay clear about 30sigmas with 1cm radius beam pipe -Currents around 1.5Amps -Background better than PEP and KEKB -Possibly to operate at the tau with L=10^35 -Polarization of one beam considered -UNDER STUDY the possibility to run down to the phi with lumi< 10^34 -Total cost about half of the ILC e+ DRs (2 e+ 6km rings in ILC) -Power around 40MW, still to be further optimized (goal 25MW) -Possible to reuse PEP RF system, power supplies, Vacuum pumps, etc., further reducing the overall cost -Needs the standard injector system, probably a C-band 7GeV linac like in KEKB upgrade (already designed)

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi7 RoundFlat (1)Flat (2)Flat (3) Sigx*  m (1 betatron) 2.67 Etax mm Sigy nm Betx mm Bety mm Sigz_IP mm Sige_IP1.0e-32.0e-2 1.0e-3 Sige_Lum0.7e-31.0e-3 0.7e-3 Emix nm Emiy nm Emiz  m Cross_angle mradOptional 2*25 Sigz_DR mm Sige_DR1.0e-30.5e-3 1.0e-3 Np 10e Nbunches DR_length km Damping_time msec10 Nturns_betwe_coll50 11 Collision freq MHz L singleturn 1e L multiturn 1e

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi8 IP FF ILC ring & ILC FF Simplified layout in the Small Disruption Regime Collisions every Turn Uncompressed bunches Crossing angle = 2*25 mrad Crabbed Y-Waist

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi9 John Seeman idea: 4400m collider (2 rings in the 2200m tunnel of PEPII)

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi10 Compressor Decompressor IP FF ILC ring with ILC FF ILC Compressor Colliding every turn crossing angle optional Raimondi Feb 2006 C = 6000 m

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi11 Layout of One Ring: Other Ring is the Reverse! IP And Detector Final Focus Reverse Final Focus Damping ring = 2200 m Bunch expander Bunch compressor Linac injector

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi12 Super-B-Factory in a 4400 m Tunnel 0.4 mm

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi13 2 most popular solutions John and Pantaleo designs seems so far the closest to a possible baseline choice. We need from now and next workshop a lot and well coordinated work to arrive to a satisfactory decision before the summer.

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi14 First meeting of the steering Committee Yesterday, we will meet again tomorrow morning at 9.0 Next workshop on june 14,15,16 (To be confirmed) at SLAC. Decision on the baseline design for the machine. Start writing the first conceptual document.

2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi15 Toward the CDR A final workshop is needed in October (beginning of) to be able to write a reasonable CDR before the end of the current year. A theory workshop will be held contiguous to ours and devoted to the preparation of the physics chapter of the CDR