Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment

Slides:



Advertisements
Similar presentations
Step 1: Set the desired flow rate for each pipe. Step 2: Click on the stream which you wish to size the pipe. Select Sizing from the menu, then select.
Advertisements

System and Component Efficiency with Refrigerant R410a A. T. Setiawan 1, A. Olsson 2, H. Hager 2 1 Department of Energy Technology, Div. Of Applied Thermodynamics.
Numbers
> >
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Detector Cooling Project Thermosiphon Project Status Report
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Plumbing Introduction 2009 Plumbing.
ipno.in2p3.fr Badesi - Sardinia - May 2006IPNO-RDD-Jean Peyré1 1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré Badesi - May.
CDC 2000 / CDC 3000 Dust Collector System
1 Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services.
Nuclear Thermal Hydraulic System Experiment
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
ME 414: Project #1 Design Team Members: Andy Cash Kyle Bredehoeft Alan Koers Brent Miller Presentation Date: May 5, 2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Modeling and simulation of cryogenic processes using EcosimPro
ATLAS thermosiphon project Piping design and seismic analysis framework Délio Ramos EN/MME,
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Cooling System Solutions
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Sample Dimensions 17mm x 6.5mm x 1mm Inlet Outlet Moving posts Fixed posts Direction of linear motion.
High School Teachers Programme 2012 July 16 th, 2012, CERN 1 CERN Mini Expo The subatomic adventure.
GNSSN Workshop on National Nuclear Regulatory Portals 04–06 July 2011, Bonn National Nuclear Regulatory Portal of the Republic of Belarus Arthur V. Kuvshinnikov.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Comparison of 5 MW fires in UXC with different geometries Michael Plagge Physics Department Compact Muon Solenoid Experiment Group European Organization.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Kirill Egorov Indiana University 20 October, th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit”
Euromet-meeting in Thessaloniki - March FORCE Technology Building up a high-pressure loop in FORCE Technology Historic: The investment.
Manifolds optimization and pressure drops in the ATLAS TRT CO 2 cooling system Joël Grognuz.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Albert Riego, Guillem Cortes, Francisco Calviño July 22 th, 2015 Universitat Politecnica de Catalunya, Barcelona (Spain) Third BRIKEN WORKSHOP – IFIC (Valencia,
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
The reading is 7.38 mm. The reading is 7.72 mm.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Procurement, Measurement and Installation of 2 Octupoles for ATF
new straw end plug: D=10.6 mm straws support frame Levan option
GEOMETRY CREATION METHODOLOGIES FOR LHC POINT 4
Integration issues at IHEP
Yahoo Mail Customer Support Number
Website: Contact No: ID:
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
مراقبت خانواده محور در NICU
Generic Cryo HX Options
دانشگاه شهیدرجایی تهران
National Information Resources of the Republic of Belarus
تعهدات مشتری در کنوانسیون بیع بین المللی
THANK YOU!.
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Head Loss in storm water systems Check valves
Action TR1201: Indicative pipeline specs/multiparty use
Thank you.
Thank you.
Around the room Orders of operations.
J. García, F. Toral (CIEMAT) P. Fessia (CERN)
Presentation transcript:

Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment Home institute: Department of Physics and Astronomy University of Glasgow Thermo-Siphon Workshop 6th of July EDMS Id:

ATLAS Cavern

USA15 / 3105 (Compressor Room) USA15 / 3105 (Compressor Room)

Pipes could be fixed to the ceiling with special supports

Critical Area Routing of pipes must be checked in place, to avoid sharp bending.

Level change From A1 to A2

Total Length of Pipes: ~185m ~177m Outer Diameter of Pipes: Inlet Line: 65mm Outlet Line: 65mm

Thank You For Your Attention A.BITADZE