1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.

Slides:



Advertisements
Similar presentations
Richard Young Optronic Laboratories Kathleen Muray INPHORA
Advertisements

SCIAMACHY Calibration Review, ESTEC, 11 September 2002 Tilstra, De Graaf, Stammes First verification of SCIAMACHY’s polarisation measurements Gijs Tilstra,
Draft Recommendations subtitle here. Recommendation 1 The study groups from this workshop continue to collaborate with the goal of reporting progress.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b Spectral Calibration analysis.
Validation of SCIAMACHY using POLDER as a reference 25 April 2006.
Measuring the height of Lunar Mountains using data from the Liverpool Telescope.
Page 1 SCIAMACHY Pointing Meeting Bremen – 30 November 2006 MIPAS Pointing Error Status Gaétan Perron ABB Bomem Inc.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Cluster Angewandte Fernerkundung DLR Oberpfaffenhofen Figure 2 shows all sun mean reference spectra of GOME from July 1995 to June 2006.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b General Product Quality.
Results from the OMPS Nadir Instruments on Suomi NPP Satellite
Just how good is a L1 spectrum? An overview of SCIAMACHY calibration quality Ralph Snel, SSAG Calibration Subgroup and SQWG SADDU meeting June 16/17, 2008.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Cal State Northridge  320 Ainsworth Sampling Distributions and Hypothesis Testing.
Atmospheric, Oceanic & Planetary Physics, University of Oxford A Dudhia MIPAS ST5 Granada Jan 2007 Page 1 AE Mode Dec06 Anu Dudhia University of.
Institutes Royal Observatory of Belgium (Brussels, BE) Principal Investigator, overall design, onboard software specification, science operations PMOD/WRC.
“Pinhole Measurement” Approach to K Measurements using Spontaneous Radiation November 14, 2005 J. Welch, R. Bionta, S. Reiche.
KNMI, The Netherlands * SCIAMACHY validation workshop, Bremen, 6 Dec ‘04 Large scale validation of SCIAMACHY nadir reflectance Gijs van.
GOME-2 Polarisation Study First results L.G. Tilstra (1,2), I. Aben (1), P. Stammes (2) (1) SRON; (2) KNMI EUMETSAT, Darmstadt,
0. To first order, the instrument is working very well ! 1.Evolution of the IR detector with time 2.Stability of the L channel 3.Saturation 4.Linearity.
SCILOV10 FP Meeting SCIAMACHY irradiance validation SCILOV10 FP, Frascati, 26/27 February, 2014 M. Weber and S.Noël Institute of Environmental Physics.
Blue: Histogram of normalised deviation from “true” value; Red: Gaussian fit to histogram Presented at ESA Hyperspectral Workshop 2010, March 16-19, Frascati,
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
S1 File Principal component analysis for contiguous U.S. regional temperatures Contiguous U.S. regional atmospheric temperatures , 13-year moving.
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
Page 1 Validation Workshop, , IfE Bremen, G. Lichtenberg:Calibration status National Institute for Space Research SCIAMACHY Calibration status November.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Sun mean reference (SMR)
Validation workshop, Frascati, 13 December 2002Page 1 SCIAMACHY products quality and recommendations Based on presentations and discussions during this.
1 Atmospheric Radiation – Lecture 9 PHY Lecture 10 Infrared radiation in a cloudy atmosphere: approximations.
Page 1Validation by Satellite Intercomparison - ESRIN 9–13 December 2002 National Institute for Space Research Preliminary validation of the first SCIAMACHY.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
Hypothesis Testing An understanding of the method of hypothesis testing is essential for understanding how both the natural and social sciences advance.
PPF “C-shape” Method B implementation results.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
Intercomparison of OMI NO 2 and HCHO air mass factor calculations: recommendations and best practices A. Lorente, S. Döerner, A. Hilboll, H. Yu and K.
MONITOR OF SOLAR EUV/XUV IRRADIATION PHOKA A. Kochemasov Astrophysics institute at Moscow engineering-physics institute.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Analysis of Nonlinearity Correction for CrIS SDR April 25, 2012 Chunming Wang NGAS Comparisons Between V32 and V33 Engineering Packets.
Kinetic Temperature Retrievals from MGS TES Bolometer Measurements: Current Status and Future Plans A.A. Kutepov, A.G. Feofilov, L.Rezac July 28, 2009,
How to describe Accuracy And why does it matter Jon Proctor, PhotoTopo GIS In The Rockies: October 10, 2013.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
NGAS ATMS Cal/Val Activities and Findings Degui Gu, Alex Foo and Chunming Wang Jan 13, 2012.
LWC C ALIBRATION The Long Wavelength Channel calibration procedure is currently on its version 4The Long Wavelength Channel calibration procedure is currently.
Status of PREMOS data SOLID Workshop 14th October 2013 G. Cessateur for the PREMOS team PMOD/WRC, Switzerland.
GERB in-flight calibration Monitoring Instrument Gain.
TOMS Ozone Retrieval Sensitivity to Assumption of Lambertian Cloud Surface Part 2. In-cloud Multiple Scattering Xiong Liu, 1 Mike Newchurch, 1,2 Robert.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
ESA Living Planet - Begen – June B. Christophe, J-P. Marque, B. Foulon ESA LIVING PLANET SYMPOSIUM June 28 th -July 2 nd 2010 Bergen (Norway)
Interannual Variability and Decadal Change of Solar Reflectance Spectra Zhonghai Jin Costy Loukachine Bruce Wielicki (NASA Langley research Center / SSAI,
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: Initial trade-off: Height-resolved.
HBD Transmission Monitor Update III: Noise Analysis B. Azmoun & S. Stoll BNL HBD Working Group Meeting 10/10/06.
COSMIC Ionospheric measurements Jiuhou Lei NCAR ASP/HAO Research review, Boulder, March 8, 2007.
MEx and VEx DATA WORKSHOP - PFS and SOIR experiments - 27 June - 1st July 2011, ESA/ESAC,Spain.
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
MODEL DIAGNOSTICS By Eni Sumarminingsih, Ssi, MM.
New PoLArization ALgorithm
LHC Wire Scanner Calibration
Paper under review for JGR-Atmospheres …
Calibration Status for the GOME Instrument
Lunar data preparation for FY-2
Activity 4: GOME2 Matthijs Krijger Ralph Snel Pieter van der Meer
MODIS Characterization and Support Team Presented By Truman Wilson
Calibration, Validation and Status of OSI SAF ScatSat-1 products
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Validating CERES calibration and ADMs Using Data from East Antarctica
Problems with the Run4 Preliminary Phi->KK Analysis
Presentation transcript:

1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis

Content Related Verification Tasks What has been looked at so far Orbit and State specifics First results Conclusions

Related Verification Tasks L : Number of orbital regions for leakage current correction (and L ) L : Verification of deep space assumption L : Number of different dark current states sufficient to determine LC param. L : Range checking of newly calculated leakage current parameter

What has been looked at so far (1) L : Number of orbital regions for leakage current correction (and L ) L : Verification of deep space assumption L : Number of different dark current states sufficient to determine LC param. Has to be seen as “investigation started”!!

What has been looked at so far (2) L : Range checking of newly calculated leakage current parameter ADS 1 Start time first state Attachment flag Start time last state Orbit phase Temperatures (OBM, Science Channels, PMD) FPN Error FPN Leakage current channel 1 to 8 Error on leakage current channel 1 to 8 Mean noise per detector element PMD dark offset Error on PMD offset ADS 2 Start time of state Attachment flag Average dark measurement Standard deviation of average dark PMD dark offset Error on PMD offset Solar straylight from azimuth (science channels) Error on solar straylight Straylight for PMD Error on straylight for PMD

Orbit and state specifics States: State ID 46, 63, 67 beta flight states, I.e. no aperture, no ND filter Orbits 1614, 1657 Both orbits contain some measurements in the South Atlantic Anomaly which has not filtered out (yet) Input values for following orbital positions (0.5 = sunrise) 1614: S1S6 S2S7 S3S8 S4 S5 1657: S1S6 S2S7 S3S8 S4S9 S5

First Results (1) FPN of orbit All orbital positions (series 1 to 8) do show identical results. Results for orbit 1657 are not shown for similarity.

First Results (2) All orbital positions (series 1 to 8) have identical FPN!

First Results (3) Average of all 8 plots of the previous type. All this proves that the FPN is (as expected) independent of orbital position.

First Results (4) Channels 1 to 5 show a significant amount of atmospheric contribution to the leakage signal. Dark space (at 150 km tangent height) assumption could not be confirmed. Record 2 (as from eclipse) gives best results for all channels. Amount of “straylight” overestimated because only first, but not first 10 readouts has been disregarded from analysis.

First Results (5) Channels 6 behaves somewhat strange. Lower wavelength part (6) shows atmospheric variation, 6+ does not!

First Results (6) Channels 7 & 8 seem to have no atmospheric straylight (no obvious differences for all regions) Dark space (at 150 km tangent height) assumption can be confirmed. Orbital dependence almost as expected.

Conclusions FPN behaves as expected Leakage current shows large atmospheric contributions (much larger than expected) This holds only for channels 1 to 5 and partly 6. Channels 7 & 8 are apparently less effected. But they might not see it due to the ice (contamination). Proposal for 1 st LC auxiliary data set from in-flight data: Take orbit 1614 or 1657 and take the one data set from eclipse being representative for all orbital regions. Errors due to that approach are in the order of 0.5 in channel 7 & 8 For channels 1 to 6 this number still needs to be assessed because the “memory” Effect was not correctly considered.

Points for Discussion Different Leakage current for nadir and limb (last scan) Straylight handling Is harmonic analysis really necessary? Shall we try and find a better tangent height (with less stray light)? How many readouts shall be rejected from analysis (and why)? Don’t we see atmospheric contribution in 6+, 7 and 8 due to contamination? Do we have other explanations for this?