Beam Delivery system design and plans Andrei Seryi SLAC on behalf of BDS design team ILC08 and LCWS08 17 November 2008 Illustration of beam dump with double.

Slides:



Advertisements
Similar presentations
Lau Gatignon / CERN for MDI team. MDI is very different between ILC and CLIC:  Organization wise (ILC in experiments, CLIC on machine side)  QD0 technology.
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
International Linear Collider Gamma-Gamma Options Tohru Takahashi Hiroshima University Mar LCWS2005  /e  e-e- Physics and Technology.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Machine Detector Interface Andrei Seryi SLAC ILC PAC Review 20 October 2008.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Date Event Global Design Effort 1 Overview of Mechanical Engineering Design Progress for LC 18MW Beam Dump CLIC08 10/16/08 (From left) Dieter Walz, Ray.
Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
IR Interface Document Draft Andrei Seryi SLAC for BDS design team and MDI-D representatives of Detector Concepts May 25-30, 2008, Budker INP, Novosibirsk,
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
ILC Beam Delivery System and ATF2 design Andrei Seryi SLAC for BDS design team May 25-30, 2008, Budker INP, Novosibirsk, Russia.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
March 3-6, 2008 Global Design Effort 1 BDS way forward summary for GDE-BDS Andrei Seryi, SLAC Thanks to all participants of GDE-BDS and ACFA-MDI sessions.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Global Design Effort Beam Delivery System Summary Andrei Seryi, SLAC ALCPG/GDE meeting October 25, 2007.
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Beam delivery and ATF2 Andrei Seryi SLAC October 1, 2008.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
BDS Andrei Seryi, SLAC DOE ART review April 29, 2009.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
Near IR FF design including FD and longer L* issues
DOE/NSF FY08 Americas Regional Team Review
Beam Delivery update Andrei Seryi December 12, 2005
CLIC Study Aim Conceptual design report in 2010
CLIC-ILC BDS & MDI work.
Updates on IR and FF for super-B factory
Andrei Seryi, SLAC for the Beam Delivery team TILC09 April 19, 2009
Beam Delivery System Schedule at ILC2010
Andrei Seryi Materials for discussion TILC-08
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Beam Delivery system design and plans Andrei Seryi SLAC on behalf of BDS design team ILC08 and LCWS08 17 November 2008 Illustration of beam dump with double header is from Satyamurthy Polepalle et al (BARC-SLAC)

A.Seryi, November 17, 2008 BDS: 2 Beam Delivery Systems strategy in TDP Three critical directions: –General BDS design –Test facilities, ATF2 –Interaction Region optimization In TDP I & II plan, the scope of work changed, and the focus is shifted Focus on a few critical directions. Selection criteria: –Critical impact on performance versus cost; –Advanced ideas promising breakthrough in performance; –Broad impact and synergy with other worldwide projects  beam dump photon collider crystal collimation crab cavity MDI diagnostics …  IR interface document & design SC FD prototyping and vibration test ILC-like FD for ATF2 … ATF2 commissioning & operation Develop methods to achieve small beam size Diagnostics, Laser Wires, Feedbacks …

A.Seryi, November 17, 2008 BDS: 3 FY09 FY10 FY11 FY12FY13 Beam delivery overall design IR Integration Final Doublet SC prototype Vibration & stability study SC FD tests at ATF2 IR and FD design for the specific ILC configuration BDS design for specific chosen configuration of ILC Collimation, beam dump, crab cavity … BDS subsystems studies at FACET ATF2 BDS prototype commissioning & accelerator physics study tests & studies of subsystems designed for specific configuration TDP ITDP II BDS five year plan

A.Seryi, November 17, 2008 BDS: 4 BDS in GDE Technical Design Phase plan

A.Seryi, November 17, 2008 BDS: 5 deputy for cost & docs. Detector concept liaison ILD: K.Buesser, T.Tauchi SiD: P.Burrows, M.Oriunno 4th : B.Ashmanskas, A.Mikhailichenko in some cases TBC BSD TDP structure Detector liaison S.Yamada, RD, (KEK) Project managers sub-WP shown are examples and not a complete list

A.Seryi, November 17, 2008 BDS: 6 BDS RDR design 14mr IR Final Focus E-collimator  -collimator Diagnostics Tune-up dump Beam Switch Yard Sacrificial collimators Extraction grid: 100m*1m Main dump Muon wall Tune-up & emergency Extraction IR Integration Crab cavity Final Doublet 1TeV CM, single IR, two detectors, push-pull

A.Seryi, November 17, 2008 BDS: 7 IR integration (old location) Challenges: Optimize IR and detector design ensuring efficient push-pull operation Agree on Machine- Detector division of responsibility for space, parameters and devices

A.Seryi, November 17, 2008 BDS: 8 Alain Herve, CERN, et al Optimization of Push-Pull design IRENG07 Optimized IR hall and motion system with auxiliary interface platform that provide clear interface and reduce detector distortion during push-pull operation ( IR Eng. workshop, IRENG07, September 2007)

A.Seryi, November 17, 2008 BDS: 9 IR integration Machine – Detector work on Interface issues and integration design is a critical area and a focus of efforts IR integration timescale –EPAC08 & Warsaw-08 Interface document, draft –LCWS 2008 Interface doc., updated draft –LOI, April 2009 Interface document, completed –Apr.2009 to ~May 2010 design according to Interface doc. –~May 2010: LHC & start of TDP-II design according to Interf. doc and adjust to specific configuration of ILC EPAC08

A.Seryi, November 17, 2008 BDS: 10 Hot MDI issues, examples < 50nm for QD0 stability compact movers for QD0 support ~3t LHCAL mass such that it does not adversely affect the QD0 dynamics May need pump close to IP Do not rely on QD0 cold bore cryo-pumping High Order Modes Support and alignment of IR chamber and VX Assembly, flanges…

A.Seryi, November 17, 2008 BDS: 11 Hot MDI issues, examples CMS platform – proof of principle for ILC Detector motion system with or without an intermediate platform Working assumption: use platform As detector design develops, a feasible and cost effective solution without a platform might be found

A.Seryi, November 17, 2008 BDS: 12 SC FD modified plans and ATF2 tests In TDP, has adjusted the plans for SC FD prototype at BNL –reduce efforts on ILC-like FD prototype; make only long cold mass and perform its field & stability tests –enhance efforts on ILC-technology-like SC Final Doublet for ATF2 upgrade Earlier plan was to prototype ILC-like QD0 magnet with cryostat & study its stability

A.Seryi, November 17, 2008 BDS: 13 Support search for optimal IP parameters for min machine The “low power” option may be a machine “cost saving” set The RDR “Low P” is not a favorite set for detectors: Improved version of Low Power may require tighter IP focusing, and use of “travelling focus” [V.Balakin, 1990]

A.Seryi, November 17, 2008 BDS: 14 '' Dieter Walz, Ray Arnold, Satyamurthy Polepalle (BARC, India), John Amann, at SLAC beam dump area (February 2008) Beam dump design New collaboration with BARC, India, on 18MW beam dump design SLAC/BARC critical expertise for beam dump project: Satyamurthy Polepalle - expert in CFD and thermal hydraulic analysis with numerous successful projects in nuclear physics and power; large technical resources at BARC. Dieter Walz - expert in beam dump design, materials performance and engineering for particle accelerator applications. SLAC-BARC Dump Group J. Amann, R. Arnold, D. Walz Stanford Linear Accelerator Center Stanford CA P. Satyamurthy, S.Pal, P. Rai, V. Tiwari Bhabha Atomic Research Centre Mumbai, India Beam dump is MDI issue via neutrons coming back to IP which affect lifetime of VX detector

A.Seryi, November 17, 2008 BDS: 15 R&D plan for  RING (Recirculation Injection by Nonlinear Gating) Cavity LLNL Pulse Stacking Cavity (R&D for Positron source KEK-LAL- Hiroshima-Waseda-Kyoto-IHEP) enhancement: , tight motion tolerances recirculation of a pulse ~50 times compensation of circulated pulse decay Developed R&D plan based on step- wise approach and large natural synergies with e+ laser cavities R&D

A.Seryi, November 17, 2008 BDS: 16 Exploration of ideas & tests for more performing machine Minimal machine may require tighter focusing at IP CERN/CLIC colleagues suggested to study squeezed y-beta* at ATF2 (0.025 mm instead of 0.1 mm nominal) Squeezed beta* study at ATF2 is one of example of strong synergy and mutual benefits of ILC-CLIC collaboration Such study may support –Test of high chromaticity FF, as in CLIC FF design –Smaller   for “New Low P” parameters of ILC –Lengthening L* for easier MDI Also evaluating if can test travelling focus at ATF2 (single beam) Exploring Volume Reflection radiation in bent crystals as a phenomena to improve the collimation system of linear collider

A.Seryi, November 17, 2008 BDS: 17 Study prompted by the CLIC FD stability challenge (< 0.2nm) Double the L* and place FD on a stable floor Initial study show that L*=8m optics is possible (CLIC08 workshop) »Some (maybe tolerable) impact on luminosity is still unavoidable CLIC08 Longer L*

A.Seryi, November 17, 2008 BDS: 18 Conclusion The BDS group, in TDP phase, will focus on several key areas Planned work expected to make significant contribution to TDP efforts on reduction of cost, risk and increase of machine performance Discussion, how to make our work more efficient, supposed to follow…