CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.

Slides:



Advertisements
Similar presentations
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
Advertisements

OPTIMISATION OF BEAM INJECTION INTO THE FIRST ACCELERATING MODULE AT TTF2 WITH CAVITY DIPOLE MODE SIGNALS N. Baboi, H. Schlarb, M. Wendt, G. Kreps, DESY,
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Chris Adolphsen Main Linac Integration. CAVITY VESSEL T4CM QUAD/Correctors T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Task 12.4: SRF HOM Beam Diagnostics R.M. Jones, U. van Rienen, T. Flisgen, N. Baboi (UMAN, UROS, DESY)
N. Baboi, DESY EuCARD WP10 Kick-off Meeting, 24 Mar HOM-couplers (pick-ups) HOMBPM - Overview Purpose: on-line measuring device for 1. beam.
Status of the ILC Main Linac BPM R&D Thibaut Lefevre CERN Claire Simon CEA Sacley Sebastien Vilalte LAPP Manfred Wendt Fermilab 11/19/20081ILC08 Main Linac.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
2 nd ILC Accelerator Workshop (Personal Impressions of a Beam Instrumentalist) Manfred Wendt Sept. 7, 2005 Seminar on Beam Instrumentation Techniques and.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
TTC Meeting Frascati Dec 5-7 Bernd Petersen WG3: Module Test-Stand Summary Charge of the working group: Define scope of module test-stand activities with.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
CARE JRA1 SRF COUPLERS TUNERS LOW LEVEL RF CRYOSTAT INTEGRATION TESTS BEAM DIAGNOSTICS Treated in highlight talks by P. Sekalski and S. Simrock Work-packages.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Wake Fest 07 - ILC wakefield workshop at SLAC Dec , 2007 Shilun Pei with Chris Adolphsen, Zenghai Li, Karl L. Bane, et al. SLAC, Dec. 12, 2007 TTF.
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
Beam Test status and Plans of the ILC Main LINAC BPM
Cavity Alignment Using Beam Induced Higher Order Mode Signals in the TTF LINAC Olivier Napoly, Rita Paparella CEA/DSM/DAPNIA, Gif-sur-Yvette Marc Ross,
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
JRA1 – SRF report CARE Steering Committee meeting,
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
PACMAN : technical objectives Hélène Mainaud Durand.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
ILC Program discussion M. Ross TTF2 - long term schedule Modul status Plans for production (Hans Weise and Bernd Petersen – TESLA Coll. Technical.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
HOMs in the TESLA 9-cell cavity HOMs in the XFEL and ILC Rainer Wanzenberg SPL HOM workshop CERN, June 25 – 26, 2009.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Status of SCRF Accelerator Activities at CEA-Saclay
S1G Experiment Schedule Plan
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Chris Adolphsen Sergei Nagaitsev
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
S1-G Webex meeting Global Design Effort
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Overview Multi Bunch Beam Dynamics at XFEL
HIE-LINAC status report
RF modes for plasma processing
Electron Source Configuration
Beam Position Measurements in TTF Cavities
HOM Based Beam Diagnostics in TESLA Superconducting Cavities at FLASH
High Precision SC Cavity Alignment Diagnostics with HOM Measurements
Presentation transcript:

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis 2.2 Improved component design 2.3 EB welding 3 Seamless Cavity Production 3.1 Seamless cavity production by spinning 3.2 Seamless cavity production by hydroforming 4 Thin Film Cavity Production 4.1 Linear arc cathode 4.2 Planar arc cathode 5 Surface Preparation 5.1 Electro-Polishing on single cells 5.2 Electro-Polishing on multicells 5.3 Automated EP 5.4 Dry ice cleaning 6 Material Analysis 6.1 Squid scanning 6.2 Flux gate magnetometry 6.3 DC field emission studies of Nb samples 7 Couplers 7.1 New proto-types 7.2 Titanium-nitride coating system 7.3 Conditioning studies 8 Tuners 8.1 Actuators and sensor characterisation 8.2 Control electronics 8.3 Piezo-electric tuners 8.4 Magneto-strictive tuner 9 Low Level RF 9.1 Operability and Technical performance 9.2 Cost and reliabilty 9.3 Hardware technolgy 9.4 Software technology 10 Cryostat Integration Tests 11 Beam Diagnostics 11.1 Emittance monitor 11.2 Beam position monitor 11.3 HOM beam position monitor

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 2 Accelerating RF Cavity HOM  BPM Naturally narrow band cavity : Q L ≈ 10 4,  ~1 µs  single bunch, but not bunch to bunch BPM polarization directions x y Centering accuracy and ‘BPM’ resolution better than 50 µm (TTF, 2004)

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 3 Measuring the Cavity misalignment in Cryomodule –Experiment performed last week at TTF module 4 (ACC4) (N. Baboi, J. Frisch, L. Hendrikson, R. Paparella, et al.) –Accelerating gradients set to zero in all 8 cavities –Reference straight trajectory across the module set by 2 BPMs on both sides of the module –Modes used : TE111 6, TE111 7, TM110 5, TM110 6 –PRELIMINARY RESULTS ( problems of reproducibilty of HOM center reconstruction w.r.t. steering ranges !! ) 1) Measurement of cavity alignment in the cryomodule

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 4 PRELIMINARY RESULTS ( problems of reproducibilty of HOM center reconstruction w.r.t. steering ranges !! ) 1) Monitor cavity alignment in the cryomodule

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 5 2) Inta-cavity Bean Position Monitor Angular scan resolution and accuracy < 50 µrad Relative position resolution ~ 4 µm (cf. M. Ross and J. Frisch).

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 6 3) Trapped modes HOM measurements of beam excited trapped mode was successfully applied to 1. 1.The detection of the 2.6 GHz dipole mode (Qext = 10 6 ) 2. 2.The qualification of superstructures It will be necessary if for the qualification of ‘Low Loss’ and ‘Reentrant’ cavity types at SMTF and STF.

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 7 Two Challenges for HOM-BPM last 2 columns reversed !! Systematic center position offset ~100 µm (M. Dohlus) I) Mode to mode systematics : em. centre and polarisation Mode center spread ~100 µm (TTF measurements, 2004)

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 8 Two Challenges for HOM-BPM II) Measuring the Pitch of the fondamental mode The pitch angle between the 1.3 GHz accelerating mode and the beam trajectory (~200 µrad) is the main cause of songle bunch emittance growth in the linac. Can one measure it through the HOM couplers ? other monopole modes of the 1st passband through the 2 ports ?? other monopole modes of the 1st passband through the 2 ports ?? systmetics of the dipole mode vs. 1.3 GHz mode pitchs ?? systmetics of the dipole mode vs. 1.3 GHz mode pitchs ??

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 9 HOM-BPM Programme 1. 1.Thesis of Rita Paparella (Saclay-DESY) at Orsay University (Oct – Sept. 2006) 2. 2.The 40 cavities of TTF will be equipped with the SLAC electronics Use for the ILC : much debatted question #36, Cost vs. Performance ? The association to CARE will allow: months extension of Rita’s PhD contract (6 month delay in the thesis program) 2. 2.Participation of Claire Simon (CARE/SRF temp stall on WP11/BPM) to the test and commissioning of the SLAC electronics at SLAC (1 month) and at DESY 3. 3.Scientific cross-benefit CARE-ILC to the debate on HOM monitors

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 10 HOM-BPM Programme 1. 1.The 40 cavities of TTF will be equipped with the SLAC electronics. Project Cost and Schedule Table 1: TTF VUV-FEL HOM BPM electronics cost. CategoryCost (K$ / 2.5 K$ per person-week) Engineering and Installation labor67.5 K$ (27 pw) Engineering and Installation cost (incl. travel)10 K$ Production cost M/S144 K$ Production labor cost37.5 K$ (15 pw) Total181.5 K$ production K$ engineer. 20% contingency51.8K $ Total310.8 K$ The system will be delivered before October 31, At that time, the group will work at DESY to commission the system using the TTF beam. The prototype cycle will be complete July 31, 2005.

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 11 HOM-BPM Programme 1. 1.The 40 cavities of TTF will be equipped with the SLAC electronics.

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 12 New BPM mechanics New BPM F (GHz) QR/Q at 5mm of the center of cavity R/Q at 10mm of the center of cavity Monopole Mode Dipole Mode   Resonant modes with the new design (simulated with HFSS) 31.5 mm   New design of the cavity BPM ( For the cleaning, 12 holes of diameter 5mm have to be added)

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 13 Voltage Δ/Σ [a.u] Position of the beam (mm) Linearity and Centering Accuracy Voltage Δ/Σ [a.u] Position of the beam (mm) Cold Re-entrant BPM Old design New design 40 µm

CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 14 SRF/WP1/BPM Planning Sept Dec. 05: Fabrication of the 1st BPM cavity (TTF room temperature). Oct.05 : Test and commisioning of the old type BPM in ACC1 Oct Jan. 06: Fabrication of the 2nd BPM cavity (TTF cryogenic temperature). Jan. 06: RF tests with beam at DESY (installation of the BPM cavity + need an oscilloscope with a bandwidth >2 GHz). Feb.06 - Apr. 06: Validation of the RF board + Programming and validation of the digital electronics. May 06 - June 06: Tests at DESY (2 weeks) on the cavity which is at room temperature with its electronics but without control-command interface. The tests will be done with displacement of the beam to know the noise, the dynamic range and do the calibration of this system. Feb Sept. 06: Installation and preparation of the cold BPM cavity. Oct. 06: Tests of the cold cavity with the beam and electronics without the control- command interface. Nov Feb. 07: Programming of the control-command interface. March 07: Tests of the cold cavity and its electronics.