SLAC Aerial View. SLAC Timing System Specifications Blue Book: (~1968) - Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + / - 400.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
The TIMING System … …as used in the PS accelerators.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
LANSCE Timing Requirements LA-UR Eric Bjorklund.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
EPICS Collaboration Meeting Timing Workshop April 24, 2012.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Outline Introduction to LCLS Some background on SLAC Timing
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
John Dusatko USPAS Fundamentals of Timing & Synchronization January 25, 2008 / Santa Rosa, CA 1 The LCLS Timing & Event System -
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
MicroTCA Development and Status
SLAC I&C Division / EE Department
Outline Introduction to LCLS Some background on SLAC Timing
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
New xTCA Developments at SLAC
SLAC Timing System Overview
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF and Beam-based Longitudinal Feedback Readiness
A Portion of the SCP RF Control System LCLS Related
Fill-pattern Control System for KEKB
Timing and Event System for the LCLS Electron Accelerator
EPICS Meeting March 12 – 14, 2008, Shanghai, China
LCLS RF Stability Requirements
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Linac Coherent Light Source (LCLS) Low Level RF Status
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Breakout Session SC5 – Control Systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Breakout Session: Controls
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Presentation transcript:

SLAC Aerial View

SLAC Timing System Specifications Blue Book: (~1968) - Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + / Volts PEP – II: (~1998) - Resolution: 2.1 nSec - Jitter: 20 pSec - NIM Level Waveform: 0 to –0.7 V into 50 Ohms

Historical MCC Timing Units

Machine Cycle 1 / 360 Second = 2.78 mSec

Timing System Enclosure

Waveforms: 476 MHz with FIDUCIALS LINAC PEP - 2

Waveforms: 119 MHz and NIM Pulse FIDO Output PDU Output

SLAC Landscape

Trigger Generation, simplified

Sector 0 Trigger Generation, oversimplified

Trigger Generation, simplified

Area Three, Rack One

Area One, Rack One CAMAC

Trigger Distribution: Sector 0 and 1

Klystron Gallery

Trigger Distribution: Damping Rings

LINAC Rack, Front

LINAC Rack, Rear

MDL Coupled Output

LINAC Timing Sector TEN

LINAC Timing Diagnostic

Fiber Optic Xmtr

Fiber Optic Link

NLCTA Trigger Distribution

NLCTA Triggers

NLCTA Beam Line

PEP – 2 Timing Generation

PEP – 2 Timing Equipment

PEP – 2 Timing Distribution

PEP – 2 Klystrons

SLC Timing Distribution

Bldg 136 Trigger Distribution

119 MHz Propagation in SLC Sector 30 “Source” Final Focus

Some Timing Modules FIDO PDU (SLC) PDU (PEP – 2) Simple Timing Buffer VDU 476 MHz Distribution 119 MHz Distribution PEP – 2 Timing Phase Lock and Distribution

FIDO Unit

FIDO B. D.

PDU – SLC Style Sixteen channels per PDU; One channel shown

LINAC Timed Crate

PDU, Backplane, and STB

PEP – 2 Timed Crate

Vernier Delay Unit

476 Distribution Unit

476 MHz Distribution B.D.

FIDOs and 119 Distribution

119 MHz Distribution B.D.

TPLD Chassis Front Panel

Timing Phase Lock Distribution B.D. Graphic by E.L.Cisneros

TPLD SCP Diagnostics 1

TPLD SCP Diagnostics 2

Some Triggered Devices Kickers Single Beam Dumper Logic Beam Position Monitors Toroid Charge Monitors Trigger Gate and Synchronizer

Damping Ring Kicker Triggers

Single Beam Dumper Logic Module

Toroid Charge Monitor B.D.

Rocks

Some Common Timing Problems Jitter FIDO – related Failures Connections Bucket Jump Undocumented modifications

280