1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.

Slides:



Advertisements
Similar presentations
G2P Target installation and Beyond. Schedule Pivot before.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Major items from field affected component list MICE Magnetic shielding review C.Macwaters 23/9/13.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
MICE - UK Project Progress Roy Preece 30 th April 2013.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Electronics Spares for StepIV Operations MICE CM39 C.Macwaters 25/6/14.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Magnetic Shielding for Tracker components Craig Macwaters – STFC MICE CM33 Glasgow.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
Magnetic Field Engineering Update CM36 IIT Craig Macwaters 17/6/13 1.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
LKr status R. Fantechi.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
BA6 – crab cavity activities in EYETS
Project Manager’s Report + DC/MoM Report
MICE AFEIIt Timing and Triggering
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
SuperB Integration Summary of previous integration sessions.
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Presentation transcript:

1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac valve – Alan & Me Service ITC503’s and MKS937’s? - Me Service CCG’s - Me Service turbos – Dave Hands ex DL Repairs and maintenance of cryostats and compressors before hall installation

Cryo, Electronics and other installation issues Computers, interfaces & VME crate topology – Caen VME x2 Which computers in what racks Another Vesda and commissioning – Fire suppression Ltd New Dry pumps instead of oil based backing pumps – Alan/Me 4 x new Turbo controllers - Me Magnetic shielding for turbos and ??? – Mike C. Helium bottle & pipework for cassettes Chilled water for compressors – sorted? Rack smoke detectors like old system? 2

Cable and fibre installation plans Ruggedised fibres from 3 PC’s in MLCR to 3x VME Crates in hall Slow controls crate in Tr1 rack holds both 1553, 10M cable to Tr2 VLSB readout crates in both Tr1&Tr2 racks Tracker1 rack already has 3 fibres laid in place Tracker2 needs doing Timing/triggering cables – Speak to Paul, uses few VME modules VLSB cables limited to 9.8 metres in length (AFE’s to VME crate) Get latest rack positions from Ian – needs minor update 3

4 Rack layout for ground floor by Q7,8,9,

5 Rack layout for North Mezz extension platform

6 Hall – Ground floor

7 Hall – Mezz level