Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
Advertisements

Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
The Fermilab Antiproton Source Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab 3 December 2007.
Eric Prebys Representing the “Mu2e Task Force”: Steve Werkema Jim Morgan Vladimir Nagaslaev Chuck Ankenbrandt Vladimir Shiltsev Ioanis Kourbanis *Mu2e-doc-1911.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Muon Campus Controls Update Brian Drendel 8/6/13.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
The Tevatron Collider: A Thirty Year Campaign Fermilab Colloquium March 10, 2010 John Peoples 1.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Antiproton source startup report Bill Ashmanskas Prevault sump water rerouted to Main Ring OTR installation in AP1. (Another OTR will go into.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
Eric Prebys, FNAL HB2012, Beijing, China.  Representing the Mu2e Collaboration  24 Institutions  ~120 Collaborators  This talk has direct contributions.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Anatomy of Accelerators Marty Peters Summer 2006.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Brian Drendel January 24, Mu2e News Beam Delivery and Requirements Beam Intensity & Loss Measurements  DCCT  Toroids  Ion Chambers  Wall Current.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Brian Drendel September 11, Funding and Deadlines Muon Campus Controls  Controls plan for existing buildings  Controls plan for new buildings.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Brian Drendel February 7, Mu2e and g-2 overview Look at controls  Beam Abort Loop  Beam Line Controls  Storage Ring Controls Homework.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
Muon Campus Mary Convery Fermilab Science and Technology Review November 5, 2013.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Status of HESR 18th March Gießen Dieter Prasuhn.
Presentation transcript:

What we have now – the Pbar source 1 1/23/2013 J. Morgan

2 R. Ray - Director's CD-1 ReviewR. Ray - Mu2e Collaboration Meeting Recycler Ring Delivery Ring Muon Campus AP-30 AP-10 AP-50 P1 - P2 - M1 M3 MI-8 Line 1/23/2013 The Muon Campus

Antiproton Source Beam lines A 120 GeV/c proton beam is transported to the Target Station via AP-1 every 2.2 seconds An 8.89 GeV/c negative secondary beam travels down AP-2 and is injected into the Debuncher 8.89 GeV/c antiprotons are bunch rotated and stochastically cooled in the Debuncher, then transferred to the Accumulator via the D/A line Antiprotons are accumulated over hours, then transferred to MI via the AP-3 and AP-1 lines 8.89 GeV/c protons can be “reverse injected” or sent in the reciprocal direction of the antiprotons for tune-up 31/23/2013J. Morgan

Muon Campus Configuration The Accumulator and D/A line are no longer needed and will be used for beamline components M1 is the new name for AP-1, apertures will be improved to accommodate the larger 8.89 GeV/c primary beam AP-2 will be renamed M2 and will be a dedicated beam line for g-2 The M3 line will connect to the Delivery Ring (Debuncher) in the D30 straight section Both the g-2 secondary beam and Mu2e proton beam will be transported to the Ring via M3 M2 and M3 will have a higher quadrupole density than AP-2 did (~4.4 m vs. ~13.0 m) for g-2 Extraction, both single turn for g-2 and resonant for Mu2e, are also in the D30 straight section The old injection region for AP-2 will become an abort for Mu2e and could be used for proton removal for g-2 The new extraction line will be called M4 The M5 line connects M4 to the g-2 Storage Ring 4 1/23/2013 J. Morgan M5

Repurposing Pbar J. Morgan5 Antiproton production Muon Campus 1/23/2013 M5