Development of the magnet power supplies at The Australian Synchrotron Sean Murphy POCPA - 2012.

Slides:



Advertisements
Similar presentations
Proton Driver Magnet Power Supply System Cezary Jach BD/EE Support April 19, 2000.
Advertisements

During fault behavior of circuit breaker
IRS2980 Buck LED Driver Peter Green Under embargo until 10/25/11.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
L.
EE136 Project Subject:Soft start & E.M.I. Prof. D Zhou Student: Dan Lee Date:Dec. 6 th,2003.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
POWER SUPPILES LECTURE 20.
AccuMax Multi-Point Injection Mechanics
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Chapter 2 Transformers.
Power Electronics and Drives (Version ) Dr. Zainal Salam, UTM-JB 1 Chapter 3 DC to DC CONVERTER (CHOPPER) General Buck converter Boost converter.
EMMA Electrical Engineering July 06 EE & PS Group EE & PS Group – EMMA 06
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Industrial Electrical Engineering and Automation Structures of the Energy flow system Mechatronics 2007.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
APPED A Confidential Part 4…Isolated DC/DC (types, operations, sales guide, etc.) Application information Power supply unit (PSU) ©2010. Renesas.
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
National Synchrotron Radiation Research Center YS Wong, KB Liu (Team Leader) 2011/06/16 Quadrupole & Sextupole Magnet Power Supply of TPS (Taiwan Photon.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Simple Solutions to Simple Problems Global Trigger of a Post Mortem Event Don McGilvery Australian Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Grounding.
Introduction to DC-DC Conversion – Cont.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Operational experience of high-power RF at Diamond Light Source
Principals of fast injection and extraction R. Apsimon.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Electromagnetic Blood Flow Meters Measures instantaneous pulsatile flow of blood Works based on the principle of electromagnetic induction The voltage.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
DC Machine & Transformer
Different Types of Voltage Regulators with Working Principle.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
Introduction to Motors, servos and steppers
Status of the FAIR Project
What they are What they do How to apply
The Survey of the Power Supply Reliability at SSRF
Machine operation and daily maintenance management in SOLEIL
Grounding.
Minimum Hardware Commissioning – Disclaimer
Snr Power Supply Engineer
Fault detection Lecture (3).
Coupling Correction at the Australian Synchrotron
DC MOTOR SPEED CONTROL 1. Introduction
Development of new power supplies for J-PARC MR upgrade
Klystron Power Supplies for ILC
Chapter 6: Voltage Regulator
Power Electronics Introduction Bipolar Transistor Power Amplifiers
Presentation transcript:

Development of the magnet power supplies at The Australian Synchrotron Sean Murphy POCPA

Introduction Upgrading storage ring magnet power supplies to Danfysik 9100 series modules Upgrade of the dipole power supply controller Shielding of the dipole cables Development of pulsed power supplies for top-up operation

Introduction The Australian Synchrotron (AS) is a 3GeV light source built in Melbourne, Victoria and opened on 31 July Storage ring 216m circumference, 14 sectors 200mA stored current Entered top-up mode on 22/05/2012!!

SR Magnet Power Supply Upgrade Poor reliability of the 9000 series DC power supplies since commissioning of The Australian Synchrotron. These are in use on all of the storage ring multi-pole magnets (up to 200A). Most of these faults occur during start-up and machine studies when the magnets are cycled. MagnetQFQDSFSD Total number of power supplies Total yearly failures

SR Magnet Power Supply Upgrade The fault levels for 2011 were greatly reduced by lessening the diagnosed fault mechanisms. This included reducing the number and magnitude of the magnet cycles during start up and machine studies. MagnetQFQDSFSD Total number of power supplies Total yearly failures8854

SR Magnet Power Supply Upgrade The 9000 series power supplies contain up to 4 separate modules, each capable of 50A, enabling up to 200A. Each module is a full wave DC/AC/DC 100kHz converter utilising two parallel H-bridges (8 MOSFETs). TI UCC3895 controller Common faults include: –MOSFET failure due to asymmetric switching –Gate driver IC failure –Snubber circuit failure

SR Magnet Power Supply Upgrade Improved reliability of the newer 9100 series Danfysik power supply was proven after extensive testing. The 9100 series modules include key design changes including: –Galvanic isolation using gate drive transformers –Separate ground for control electronics –Relocated control circuit and rerouted PCB, shortened signal paths –Heavy duty snubber circuit

SR Magnet Power Supply Upgrade One of the upgraded 200A units was tested at AS under laboratory conditions to evaluate its reliability during repetitive magnet degauss cycles. A total of 18,000 degauss cycles were completed successfully without failure, this is equivalent to >40 years of normal operation for a power converters.

SR Magnet Power Supply Upgrade A typical magnet cycle program would be: The power supply goes to 160A for 5 seconds. The power supply starts at 0A for 5 seconds. The power supply goes to 160A for 5 seconds. The power supply starts at 0A for 5 seconds. The power supply goes to 160A for 5 seconds. The power supply goes to 118A for 30 seconds and repeats.

SR Magnet Power Supply Upgrade Five upgraded power converters which consist of 4 x 200A units and 1 x 100A unit were installed in the storage ring and tested. 7,500 degauss cycles were completed with the actual storage ring magnets, operating from different initial conditions - OFF state, nominal output current and zero output current. No failures of the 5 power converters were recorded.

SR Magnet Power Supply Upgrade It was decided to install the 9100 series modules in the 9000 series chassis. The power converter fault statistics generated in December 2010 recommended an upgrade priority order as follows: –SR F Quads – 56 converters –SR F & D Sextupoles – 98 converters (These are high priority due to impact on the storage ring) –SR D Quads – 26 converters (Originally intended to be done with F Quads upgrade) –LINAC, LTB and BTS – 49 converters (Increased priority due to Top-up but won’t affect beam availability statistics) MagnetQFQDSFSD Total number of power modules

SR Magnet Power Supply Upgrade The final production version from Danfysik would contain different MOSFETs and magnetic components sourced from different suppliers. It was therefore decided to test and verify these production versions with the same degauss cycling at Dankysik:

SR Magnet Power Supply Upgrade These new units were thoroughly tested against an agreed test procedure including 1000 degauss cycles without failure.

SR Magnet Power Supply Upgrade All 56 SR Focus Quadrupole power converters were upgraded in January Each unit was degauss cycled a minimum of 100 times. They have since been operational to present without a failure. Phase 2: Sept 2012 – Upgrade approximately 49 Sextupole and 14 D Quadrupole magnet power converters and procure enough power modules to hold adequate stock of spares.

Dipole Power Supply Shielding 50Hz interference on the stored beam has been a problem. There is a significant current flowing through the cable ladder that supports the storage ring dipole power supply AC cables. It is being induced in to the parallel conductors that make up the cable ladder supports. MinMaxAvg AIrms BIrms

Dipole Power Supply Shielding Galvanised mild steel cable duct installed offset from the cable ladder and earthed at one end: MinMaxAvg AIrms BIrms

Dipole Power Supply Shielding Due to the adequate shielding capabilities of the steel conduit, and the ease with which it can be installed on the dipole power supply AC cables, it is strongly recommended to fully shield these cables from the power supply, to the cable gantry. This will reduce the EMF radiated from these cables and the subsequent induced 50Hz noise by at least 75%. Relocation of the dipole power supply with only the output DC cables running across the machine to the dipole magnets would reduce the induced current significantly; the only changing magnetic field would be due to the ripple on the output current. This would require a suitable location to be found, and suitable cabling and plumbing for cooling water to be installed to this new location.

Dipole Power Supply Controller The existing dipole power supply controller has not been sufficient due to controller lock up and dropping of communication. It was decided to replace the controller with a voltage and current loop controller and a separate PLC for interlocks. There are approximately 27 interlocks. An Ethernet Power Supply Controller from SLAC was purchased and evaluated

Calibrate septum board between open and closed loop operation The Australian Synchrotron is moving to top up mode which requires repeatable single pulses every two minutes of the septum magnets in addition to continuous 1Hz operation (8000A in 600us). The solution to this is to operate the septum magnet in closed loop for 1Hz, and open loop for single pulses. During 1Hz ‘full fill’ the system needs to be in closed loop due to temperature drift of the magnet (significantly reduced by a new heatsink) and open loop during ‘top-up’ pulses due to the duration of time between pulses. The septum had to be calibrated to bring closed loop operation to within approximately 200ppm of the open loop single pulses. The power supplies were originally rated to ±500ppm. A trim pot was used to bring the closed-loop output current to within calibration of the open loop by biasing the error

Calibrate septum board between open and closed loop operation Automatic Open-Loop to Closed-Loop change over board was designed and installed. This allows level operation at 1Hz followed by level operation with single pulses with automatic change-over.

Calibrate septum board between open and closed loop operation The septum was run in continuous 1Hz closed-loop operation for 10 minutes, and then one open-loop single pulse every two minutes for 20 minutes (10 single pulses). The calibration difference between open and closed loop was adjusted to a maximum difference of 212ppm.

Heat sink on the septum magnet yoke Due to the thermal drift of the septum magnet, it was decided to install a heat sink on the yoke of the magnet. This reduced the long term drift from a 35A drift over six hours to a 16A drift over 45 minutes

Heat sink on the septum magnet yoke

Shielding of the Septum Magnet controller Due to the interference cause by KE-2 operating, the output current could deliver false read back and could vary by up to 5000ppm during 1Hz operation. The calibration difference between open and closed loop was up to 4000ppm.

Shielding of the Septum Magnet controller The interference was caused by radiated high frequency noise from the nearby kicker (600A in 200ns) being picked up by the SEE-2 controller board PCB and associated cabling. The current feedback had the following high frequency spike observable when the kicker was operating: The electrical noise has a peak of approximately 8V above the DC offset at approximately 30MHz

Shielding of the Septum Magnet controller The nature of the noise was determined to be radiated high frequency EMI from KE-2, to mitigate the interference on SEE-2 it was decided to install shielding on the SEE-2 control board and cables.

Shielding of the Septum Magnet controller Due to the shielding, the noise on the sample and hold reduced from approximately 8Vpeak to 0.476Vpeak.

Shielding of the Septum Magnet controller The maximum calibration difference between open and closed loop, with KE-2 operating and shielding installed, is approximately ±250ppm. However, it is typically ±100ppm between open and closed loop operation

Septum Magnet induced currents A significant current was being induced in to the vacuum vessel by the septum magnets. There was no defined return path for this current creating peak currents of over 30A in the surrounding conductors. This created problems with diagnostic equipment such as the fast current transformers (FCTs)

Septum Magnet induced currents With a copper braid installed from the vacuum vessel to the aluminium yoke support, the current through the new braid was in excess of 400A peak

Septum Magnet induced currents Results: With two septum magnets running (SEP-3 and SEI-3) the currents through four FCTs positioned around the injection system were measured: LTB FCT (green), Booster FCT (yellow), BTS FCT1 upstream (pink) and BTS FCT2 downstream (purple). Both before and after installation of the braids to the vacuum vessel. Before After

Kicker Magnet return path Originally by design, the return current passed down vacuum vessel. There were other parallel return paths (earth loops) which caused current to flow throughout the earthing system and vacuum vessel. A better design would be a single connection to earth and a dual feed through design to keep the magnet conductor floating. The HV is at 18kV and 4kV across the vacuum vessel was measured. Thyratron pulse at 1Hz, 600A peak for 200ns; total time 500ns

Kicker Magnet shielding Existing enclosure:

Kicker Magnet shielding A new kicker enclosure was constructed: –3mm aluminium –Alodine finish for conductivity / surface passivation

Kicker Magnet shielding RF gaskets and fingers installed on all openings

Kicker Magnet shielding Shielding and RF fingers around the vacuum vessel:

Kicker Magnet shielding Completed and installed enclosure:

Kicker Magnet shielding Completed and installed enclosure around the vacuum vessel: Before After

Kicker Magnet shielding Results: The peak to peak magnitude of the noise is approximately 40% of what it was with the old enclosure. Before After

New Development – Fast Global Feedback Looking at developing in-house low current linear power supplies with analogue control for the purpose of fast global feedback. FGF has the aim of reducing noise and taking the 50Hz out of the beam. The sextupole yokes may have additional windings added for the purposes of FGF, so as not to effect the existing correctors. This is still being investigated.

Acknowledgements Steve Griffiths Wes Hoffman Brian Jensen Adam Michalczyk Noel Basten And the rest of the electrical team