Workshop decisions Helge Meinhard / CERN-EP Atlas software workshop 08 May 1998.

Slides:



Advertisements
Similar presentations
Requirements Specification and Management
Advertisements

Simulation Project Major achievements (past 6 months 2007)
GEANT4 Introduction, History Geant4 User’s Workshop February 2002.
Configuration Management
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Software Configuration Management
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Chapter 6– Artifacts of the process
Argonne National Laboratory ATLAS Core Database Software U.S. ATLAS Collaboration Meeting New York 22 July 1999 David Malon
SPI Software Process & Infrastructure EGEE France - 11 June 2004 Yannick Patois
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
UK LOM Core How and why it came about Charles Duncan, Intrallect
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
1 G4MICE Design Iteration Malcolm Ellis MICE Video Conference 21 st April 2004.
Chris Onions Getting started with CVS in ATLAS 11 Getting started with CVS in ATLAS Chris Onions (Tutorial based on that of Raúl Ramos Pollán CERN / IT.
Software workshop summary Helge Meinhard / CERN-EP Atlas software workshop 21 May 1999.
ILDG Middleware Status Chip Watson ILDG-6 Workshop May 12, 2005.
Study for Migration from CVS to SubVersion (SVN) Gunter Folger CERN/PH/SFT.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
MINER A Software The Goals Software being developed have to be portable maintainable over the expected lifetime of the experiment extensible accessible.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Fabiola Gianotti, 31/8/’99 PHYSICS and SOFTWARE ATLAS Software Week 31/8/’99 Fabiola Gianotti Software requirements of physics groups What should Detector.
Naming and Code Conventions for ALICE DCS (1st thoughts)
R.T. Jones, Newport News, May The GlueX Simulation Framework GEANT4 Tutorial Workshop Newport News, May 22-26, 2006 R.T. Jones, UConn Monte Carlo.
9 November 98 1 Jürgen Knobloch ATLAS Computing Overview of ATLAS Computing Jürgen Knobloch Slides also on:
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
Software workshop summary Helge Meinhard / CERN-EP Atlas software workshop 03 September 1999.
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
9-13/9/03 Atlas Overview WeekPeter Sherwood 1 Atlfast, Artemis and Atlantis What, Where and How.
SEAL Core Libraries and Services CLHEP Workshop 28 January 2003 P. Mato / CERN Shared Environment for Applications at LHC.
Ties Behnke: Simulation and Tools 1 Simulation and Tools Ties Behnke, DESY Summary of the simulation sessions At this conference: 4 sessions (one combined.
Atlas CHEP‘2000 Padova, ITALY February 2000 Implementation of an Object Oriented Track Reconstruction Model into Multiple LHC Experiments.
Marco Cattaneo - DTF - 28th February 2001 File sharing requirements of the physics community  Background  General requirements  Visitors  Laptops 
Introduction What is detector simulation? A detector simulation program must provide the possibility of describing accurately an experimental setup (both.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
Atlas Computing Planning Helge Meinhard / CERN-EP Atlas Software Workshop Berkeley, 11 May 2000.
GLAST LAT Offline SoftwareCore review, Jan. 17, 2001 Review of the “Core” software: Introduction Environment: THB, Thomas, Ian, Heather Geometry: Joanne.
J.P. Wellisch, CERN/EP/SFT SCRAM Information on SCRAM J.P. Wellisch, C. Williams, S. Ashby.
Status of the LAr OO Reconstruction Srini Rajagopalan ATLAS Larg Week December 7, 1999.
Status of the ATLAS Detector description Stan Bentvelsen Berkeley software week May 2000.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
Overview of ATLAS C++ PACKAGES David Candlin 15 June 1999.
Atlas Software Workshop Summary Helge Meinhard CERN-EP 03 December 1999.
ATLAS Database Access Library Local Area LCG3D Meeting Fermilab, Batavia, USA October 21, 2004 Alexandre Vaniachine (ANL)
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ACOS Report ATLAS Software Workshop December 1998 Jürgen Knobloch Slides also on:
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
J. Knobloch, SW meeting ACOS Agenda Corrections to the Minutes, Matters arising. 2.Discussion and decisions arising from the Software.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Software workshop summary
Supporting quality devices
Status of Brunel team and next steps
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
US ATLAS Physics & Computing
Simulation Framework Subproject cern
Simulation and Physics
Java Analysis Studio and the hep.lcd classes
Use of GEANT4 in CMS The OSCAR Project
Presentation transcript:

Workshop decisions Helge Meinhard / CERN-EP Atlas software workshop 08 May 1998

DIG 04/05/98 Reviews: SRT waiting for updated documentation; Astra design, muon code, graphics code: review process being started Access to DIG minutes will be made easier Discussion about units launched. Implications wrt G4 to be understood. Aim for decision at next workshop Tools: CodeCheck received, will be integrated) in SRT (‘make CodeCheck’); StP 2.4 for HP still pending; Logiscope, Insure++ available

Repository policy and structure Distinction between official (ASP compliant or aiming at it) and external software, category of contributed software can be added later Access restrictions will be put in place Creation of top-level packages needs DIG approval, subpackages the one of the respective package coordinator (DIG advises on request) One responsible per package

Repository (cont’d) Package responsible can grant commit access to (few) more developers Periodic reviews of repository by DIG Logging of changes: ChangeLog file at package level Subpackages should contain the (abbreviated) superpackage name as prefix (unique naming)

Repository (cont’d) Directory structure: $CVSROOT/srt /offline/p1/p11 /p2 /external/... [/contrib] ? Public.h files in subdirectory with package name (eg. arve/arve/Arve.h) MS Studio files not compulsory

Round of domains B field: Map implemented in Objy ID: Pixel clustering being rewritten in C++ Simulation: Setting G4 up for cal. test beam as prototype, similar projects for Datcha and TRT test beam. May want to use Arve. Geometry data base to be clarified Event: optimised access to ID digis, working on muons, then calo. Aim to have events in Objy by August workshop

Round of domains (cont’d) Graphics: Can read ID events. New version of Atlantis soon. Wired being changed to use XML. Reconstruction: xKalman++ well advanced, will treat non-constant B next. iPatRec being polished to make full use of SRT, design documents of iPatRec being prepared. MC with non-constant B required. Track class exists.

Workshop decisions Fortran MC consolidation continues with limited scope Finish migration to cvs asap Finalise ‘April 98’ Arve release Start collecting criteria for 1 TB milestone of end 1998 Start collecting requirements for outside users of Windows NT Operating systems: Linux, NT, >= 1 commercial Unix (not necessarily HP-UX)

Workshop decisions (cont’d) ASP: Make user-friendly, shorten, rephrase, cautiously update; try rules for external software with CLHEP; keep C++ rules unchanged Naming conventions: proposal adopted (note TRT_Layer), units to be decided next time Next workshop: Ann Arbor, August 1998 Coding rules for Java to be drafted (but main implementation language remains C++!)

Workshop decisions (cont’d) DIG to look at Track class Java package name prefix: ch.cern.atlas XML adopted by graphics domain for exchange of ASCII like files; need to study this more widely Go ahead with testing team Atlas appreciating RD55 PAP, recommendation to EB to approve

Informative topics Status of Fortran software, 98_2 release SDE working group, role of IPT group Arve demonstration LHC++ status: Linux on the road Magnetic field LHCC computing workshop Barcelona

Next cycle(s) Domain descriptions Criteria for 1TB milestone Events into Objectivity Arve release ASP editorial work Web spring cleanup B field implementation Detailed schedule, milestones Geant4 for testbeams MC production Geometry database Physics analysis strategy, Atlfast++ and LHC++ More people doing OO Work on units decision Port software to Linux MC consolidation Migration to cvs, SRT consolidation Requirements for NT Sort out CLHEP problems Tile TB data into Objy