Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Reliability Risk Assessment
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
Regulatory Body MODIFIED Day 8 – Lecture 3.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Hydraulic Circuits.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Safety - definitions Accident - an unanticipated loss of life, injury, or other cost beyond a pre-determined threshhold.  If you expect it, it’s not.
Quality Assurance.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Diablo Canyon NPP Risk-Informed In-service Inspection
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making System Analysis Workshop Information IAEA Workshop City, Country XX - XX Month,
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Common Cause Failure Analysis Workshop Information IAEA Workshop City, Country.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
Safety Assessment of General Design Aspects of NPPs (Part 1) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making “Overview of Level 2 PSA” Workshop Information IAEA Workshop City, Country.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Version 1.0, July 2015 BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies This material was prepared by the IAEA.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Cross Connection Survey Training
OH&S Plant Obligations make
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Flooding Walkdown Guidance
Training Course on Integrated Management System for Regulatory Body
Air Carrier Continuing Analysis and Surveillance System (CASS)
IAEA International Conference on
Diversity analysis for advanced reactor design
Communication and Consultation with Interested Parties by the RB
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
NRC Event Number – Event Date
Regulatory Oversight of HOF in Finland
Grid Stability and Safety Issues Associated With Nuclear Power Plants
IAEA International Conference on Topical Issues in Nuclear Installation Safety, 6-9 June, 2017 Investigation of performance of Passive heat removal system.
Unit I Module 3 - RCM Terminology and Concepts
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
PSS0 Design & Concept of Operations
TSS System Requirements - TSS CDR1
Preliminary Hazard Analysis of Bunker
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Mikael Olsson Control Engineer
Presentation transcript:

Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Lecturer Lesson III 1_2 Lecturer Lesson III 1_2 City, Country XX - XX Month, Year

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 2 Items for Discussion Review of Single Failure Criterion System Redundancy System Independence System Diversity Concept of Fail-Safe Design System Interactions and Dependencies Conduct of Single Failure Assessments

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 3 Review of Single Failure Criteria “.. protection system shall be designed for high functional reliability and inservice testability commensurate with safety functions performed.” “Redundancy and independence designed into protection system shall be sufficient to assure: “1. No single failure results in the loss of protective function..” “2. Removal from service of any component or channel does not result in loss of required minimum redundancy unless acceptable reliability of operation of protection system can be otherwise demonstrated.”

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 4 Review of Single Failure Criteria “..protection system shall be designed to permit periodic testing of its functioning when reactor is in operation, including a capability to test channels independently to determine failures and losses of redundancy that may have occurred.” Taken from US Title 10 Code of Federal Regulations, Part 50 Appendix A, General Design Criteria 21

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 5 Example of Potential Single Failure

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 9 System Redundancy System redundancy in all critical components is first step to meet single failure criteria. System redundancy reduces system failure probability thus improving reliability. To be redundant requires individual trains have sufficient capacity (Design Margins) to meet functional requirements. 2 redundant trains alone does not meet single failure criteria. Provisions also needed for: periodic on-line testing, and ability to remove a channel from service.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 10 System Redundancy

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 11 System Redundancy To permit on-line testing and maintenance typically use minimum of 3 redundant trains or channels. To prevent spurious safety system operation (also potential safety concern) it is most common to take 2/3 Coincidence in actuation logic. Current reactor protection systems use either 2/3 or 2/4 coincidence logic. IEEE Std. 279 (1971), IEEE Std. 379 (1988) provide conservative guidance

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 12 Example of Too Much Redundancy

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 13 System Independence Single Failure Criteria for redundant systems implies redundant trains (or channels) are physically independent of each other. No common dependencies on power or environmental supports. Cross-connections are isolated to prevent fault in one train failing redundant train. IEEE Std. 384 (1984) provides conservative guidance.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 14 Example of Lack of Independence

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 15 Example of Lack of Independence

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 16 System Independence Independence is achieved by: Routing cabling in physically separated metal conduits according to electrical design standards, such as IEEE Std. 384 (1984). Cross-connection using qualified electrical isolation devices Use of Optical Isolators NOT resistors Fluid system cross connections isolated via check valves.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 17 System Diversity Reliability of redundant, independent safety system becomes limited by potential for common cause failure. Example: 2/4 train ECCS system will typically have failure probability in 10-4 to 10-5 range. It is difficult to mathematically justify common cause failure probability being significantly lower than this range.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 18 Common Cause Failures include Common design error or inadequate Design Margins Common manufacturing defects Common testing or system restoration errors Environmental degradation (dirt, grit, moisture)

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 19 System Diversity Potential significance of common cause failure warrants thorough consideration in safety assessments. Additional redundancy is NOT way to address common cause failure. Component diversity is acceptable way to address common cause failure.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 20 Diversity Can Be Achieved By Use of different physical operating principles (e.g. : steam and electric driven pumps) Use of different component manufacturers to eliminate common manufacturing defects. Use of different technicians to test, maintain, or restore operating equipment.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 21 Concept of Fail-Safe Design “Fail-safe” concept originated with military concerns over accidental launch of missiles or detonation of weapons. Fail-safe concept requires systematic identification of safe outcome of system failure (e.g. no missile launch!). Central issue of Fail-safe concept typically identification of de-energized state of systems and components.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 22 Application of Fail Safe Concept to NPPs Control Rod Clutches, electrical breakers should be designed to TRIP on loss of control power. Relay logic should TRIP on loss of power. Reactor protection system should be designed to TRIP on loss of power supply. ECCS recirculation valves should typically fail as-is. Pneumatic Valves should be assessed which is safest state for loss of air pressure. Solenoid operated valves should be assessed which is safest state for loss of power.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 23 Systems Dependencies & Systems Interactions Most NPP designs have redundant protection systems supported by redundant support systems (e.g. AC/DC Power, cooling water, HVAC, etc.) Failure of one train of these individual support systems can lead to very complicated transient events involving sudden loss of ½ of all systems. World operating experience has shown these events can be very severe.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 24 Systems Dependencies & Systems Interactions Systems Interactions caused by single failures (steam line rupture in a compartment, inadvertent automatic fire suppression operation) can cause significant components to fail simultaneously. Faults initiated by failed support systems and system interaction events should be considered in Single Failure Assessments.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 25 Conduct of Single Failure Assessment Excellent guidance on performing single failure assessments can be found in: IAEA 50-SP-1, IEEE Std. 352 (1987). Single Failure Assessment is deterministic in nature and documented as FMEA. Probability only considered in dispositioning of “incredible faults”. Purpose: document Single Failure Criteria compliance for safety systems credited in Accident Analysis. Inputs are comparable to those needed for PSA (frequently FMEA conducted in parallel with PSA)

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 26 Conduct of Single Failure Assessment Documentation required: All Electrical Schematics, Piping & Instrument Drawings, Isometrics (fluid systems only). Equivalent Schematics for all Support Systems. All Electrical/Mechanical Specifications. System descriptions. Operating Manuals and Operating Procedures. Test/Maintenance Procedures. Operating History Reports for similar equipment at other NPPs.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 27 Conduct of Single Failure Assessment Systematic identification of PIEs or Postulated Initiating Events. Identification of systems credited (timing, operation mode) in Accident Analysis. Collapse credited systems, support systems into single list of credited functions. Support system FMEA used to identify any systems interaction transients requiring further accident analysis as new PIEs.

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 28 Conduct of Single Failure Assessment Single Failure Assessments are LARGE Independent review by Regulatory Body or other external organizations necessitates systematic, auditable documentation. Typical Format is via: Failure Modes and Effects Analysis Table Content of FMEA Table found in 50-SP-1 or IEEE Std. 352 (1987).

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 29 Documentation of Single Failure Assessment Specific component identification - Component function - Failure mode - Effect of the failure on the system - Methods available to detect/correct the failure - Any relevant further comments - –FMEA Table systematically documents:

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 30 Example of Actual FMEA

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 31

IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making 32 Comments from Personal Experience Single Failure assessments and PSA complement each other as tools to investigate safety. Both tools have identified design weaknesses Single Failure assessment provides a more legal proof of regulatory compliance to Regulatory Body than does a PSA –because no faults are hidden from consideration. Support System FMEAs frequently used as critical input to PSA for identifying Special Initiators.