Program File Load (PC Programming) Operation1: Program File Transfer You must prepare the program file on your HDD beforehand. c.After you decided the.

Slides:



Advertisements
Similar presentations
Using CrossCheck in Editorial Manager® Prepared by: Adam Nicely.
Advertisements

9.How To Upgrade Title Bar Status Bar 9-1.PC System Requirements
KX-TDA/TDE/NCP System
Taking the Password Test for English Language Schools.
SDReader6 An Overview on Use and Functionality. Initial Setup Open the SDReader6 program from the shortcut placed on the desktop Click on Configuration.
QS: Offline Register To register QS Offline Follow the steps below: 1- Download. 2- Install. 3- Register. Continue = Mouse Click Exit = Key.
O-Ring Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
Android – Application for handheld devices
Rubber Seal Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
SmartPay 2 Travel Card Program for DoD Bulk Account Maintenance with File Upload 1.
The Way to Success … Sta rt Sta rt Ak Technologies Mo | Visit.
REVIEWING AND APPROVING PAYMENT REQUESTS Reviewing and Approving a Payment Request with an exception(problem) Reviewing and Returning to Employee a Payment.
Help Manual for Stage 1,Submit Bid Hash (Bid Preparation) on DAE portal.
NAS-7101 / NAS-7201 TorrentFlux Utility Installation
Adding and Managing Your Classroom Printer Managing your printer refers to controlling who prints what documents, when they can print and deleting documents.
ADDITIONAL INSTRUCTIONS Reserving Books. Initial Notes for reserving books instructions - click here for checking status of reserve - click here NOTE.
Transferring Data from XL-30 PC to Dell PC Using Link Maven.
Steps Of NSAP-CPSMS DBT 1.Registration of beneficiary by getting CPSMS beneficiary Id. 2.Update rejected cases from CPSMS response file. 3.Compute pension.
Controls Toolkit in ADAMS/View
Of 19 1/11/2014Create WNPS Business Cards 1 Create and Order WNPS Business Cards This set of charts describes the process with which you can create and.
Confidential [Offline] Regular Demo installation SOP for ME371MG.
CHAPTER 1 XNA Game Studio 4.0. Your First Project A computer game is not just a program—it is also lots of other bits and pieces that make playing the.
Create / Edit Competence Assessment Role: Employee.
9000U Quick Guide Marketing & RMA Department XELTEK 8/28/2015.
KX-TDA200/100 System (Production Version 2.02)
HUAWEI TECHNOLOGIES CO., LTD. Page 1 Firmware Upgrade & Dashboard Update of Huawei E220 USB Modem HUAWEI TECHNOLOGIES CO., LTD.
WORKSHOP 7 TAPERED PLATE WS7-1 NAS120, Workshop 7, November 2003.
1 Pulley System GUI Familiarity Level Required: Lower Estimated Time Required: 40 minutes MSC.ADAMS 2005 r2.
How do I use my Digital Movie Creator Camera? To record a video, press and hold the record button. The record button must be held all the time you are.
Open SOFTWARE SELECT SYSTEM ADMINISTRATION Click Back up Data Click O.K. Select tasks option One box will appear, in that box default path will be displayed.(Remember.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
How to sit an assessment. Enter the Assessment Number and click the ‘Load’ button.
Confidential1 Panasonic Communications Co., Ltd. Office Network Company Edition th July, 2007 Chapter 2 General Installation Procedure KX-TDE100/200.
Hertz Contact Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
11/25/2015Slide 1 Scripts are short programs that repeat sequences of SPSS commands. SPSS includes a computer language called Sax Basic for the creation.
How To Configure Thunderbird For Your Webspace Account.
WORKSHOP 1 STEADY STATE HEAT TRANSFER WORKSHOP 1 STEADY STATE HEAT TRANSFER.
G-scan PC Utility Viewer Manual. Data Viewer Data Viewer function has been newly added. Data Viewer function includes two sub functions which are Flight.
This is the iInterfolio site: Click on APPLY NOW FOR FREE.
Features : VMAX-MIPI is a pattern generator which supports Full-HD resolution. VMAX-MIPI has one MIPI connector(29Pin), 4 programmable power. PC to USB.
WS Mar120 - Patran Day 1 Overview - Results POST PROCESSING OF STRESS RESULTS.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
ECG INTEGRATION MAC600 SD Card – TPP SystmOne Intelligent Integration GE MAC600 ECG.
Task 2 The Podcasting Task.  Choose an element of Samworth Life (Interview)  PLAN and SCRIPT your work (Include music and other interludes in the script)
1 Installing Java on Your PC. Installing Java To develop Java programs on your PC: Install JDK (Java Development Kit) Add the directory where JDK was.
Unified PC Maintenance Console
ECG INTEGRATION MAC600 SD Card – EMIS WEB Intelligent Integration GE MAC600 ECG.
2016 Academic Year Clinic Session Integrated National Education Information System (iNEIS TM )
CS Program File Load Operation1: CS Program File Transfer You must prepare the CS program file on your HDD beforehand. Step 1. Select “Utility” Step 2.
CS Program File Load Operation1: CS Program File Transfer You must prepare the CS program file on your HDD beforehand. Step 1. Select “Utility” Step 2.
A caution to use authentication key  An introduction of authentication key To install authentication key prior to use program since it is usable only.
Photo Recovery How to Get Back your Lost Photos Easily?
For Adult Education Students Creating myLogin 1.
Workshop 7B-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 7B Structure With Spring Support.
Submitted By: Tarun Tyagi Website- - Enable USB Debugging.
Workshop 4-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 4 Structure Subjected to Enforced Displacement at an incline.
SETTING UP NEW PROJECT IN CUBASE – (I’VE USED CUBASE BEFORE) MUSIC TECH.
How to pay with your credit card IE, CHROME for Windows.
QQ Registration & Usage
KX-TDA/TDE/NCP System
Program File Load (PC Programming)
G-scan PC Utility Viewer Manual
How to create a flip or camera video
Claims.
ALL DEVICES EXCEPT CHROMEBOOKS:
ZXP3 Printer Driver Installation and settings for EPIC Cards
ZXP3 Printer Driver Installation and settings for Aadhaar Cards
This is provided for PERSONAL COMPUTER USE only!
How to Generate a Header File for TAS5805M in PPC3
Presentation transcript:

Program File Load (PC Programming) Operation1: Program File Transfer You must prepare the program file on your HDD beforehand. c.After you decided the program file, this dialogue box appears. Program file transfer takes a few minutes by USB. When transfer finished, “completed” message appears, and program file name is registered automatically into the memory. (See Operation3) b.Select “File Transfer PC to PBX” Then file select dialogue box appears, you can select target program file. a. Select “Utility”

Program File Load (PC Programming) Operation2: Card status change to out of service Program file load is available only for out of service status card. Open “Configuration-SLOT” screen and change the status. b.Click “OUS” button for change the status. a.Click status cell of target card. Then, Command dialogue box appears.

Program File Load (PC Programming) Operation3: Program File View and Load (1/4) It shows the file which is available for download. b. Select “SD Card File View and Load” Then following screen appears. c.This screen gives an information as kind of files that the memory card has. The first character of the program file is “P”. For example, PDHLC is DHLC/DLC card’s program. a. Select “Utility”

Program File Load (PC Programming) Operation3: Program File View and Load (2/4) You must select target program file from the memory. d.Select target program file. PDHLC: DHLC / DLC PSLC: SLC PT1: T1 PE1: E1 PBRI: BRI PPRI23: PRI23 PPRI30: PRI30 PEM: E&M PIPGW: IP-GW PCTILINK: CTI-LINK PCSINF: CSINF POPB3: OPB3 e.Click the Button. [Detail]: When you load the card program, click this button. Then program file details is shown. Except for program file, this button is invalid. [Cancel]: Close this screen.

Program File Load (PC Programming) Operation3: Program File View and Load (3/4) It shows program file header information. f.Program file header information of the memory. g.Select target card. It shows current available card number and name. [All]: Load to all available card. h.Click the [View] Button. Program file header information of the target card is shown.

Program File Load (PC Programming) Operation3: Program File View and Load (4/4) You should compare header information of card and memory. i.Click the [Load] Button. Program file load is started. The load takes a few minutes. When loading finished, “completed” message appears, and target card will change in service status automatically. j.Click the [Cancel] Button. This screen disappears.