Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN 978-1-40803-213-9 © 2011 Cengage Learning EMEA Cost and Management Accounting:

Slides:



Advertisements
Similar presentations
Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
Advertisements

1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 17 Budgetary Control.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
© John Wiley & Sons, 2005 Chapter 11: Standard Costs and Variance Analysis Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Chapter 11: Standard Costs.
ACTG 321 Agenda for Lecture 14
Standard costing.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 7: Standard Costing and Variance Analysis
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Standard Costing and Variance Analysis
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
23 Performance Evaluation Using Variances from Standard Costs
© Pearson Education Limited 2003 Atrill, McLaney: Accounting and Finance for Non-Specialists, 4th edition OHT 9.1 Budgeting OBJECTIVES You should be able.
Chapter 12 – Standard Costs: Direct Labor and Materials
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
Chapter 17 – Additional Topics in Variance Analysis
Financial and Managerial Accounting
Standard Costs Budget for a single unit
Cost Accounting: Foundations and Evolutions, 8e Kinney ● Raiborn © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Flexible Budgets and Variance Analysis
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 14 Professor Jeff Yu.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Income effects of alternative.
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Variance Analysis. Variance analysis Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity.
An introduction to cost terms and concepts
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Process costing CHAPTER 6.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost assignment CHAPTER 4.
ACC3200 STANDARD COSTING.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Part One: Introduction to Management and Cost Accounting
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
Standard Costing and Variance Analysis
Chapter 9 Introduction to a Standard Cost System.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Amity School of Business Variance Analysis Module VI.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Standard costing.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
20 Monitoring Performance in Cost, Profit and Investment Centers
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Foundations and Evolutions
MANAGEMENT AND COST ACCOUNTING
Part One: Introduction to Management and Cost Accounting
© 2017 by McGraw-Hill Education
Cost accounting Session 7.
Use with Management and Cost Accounting 8e by Colin Drury
AMIS 3300 Chapter 9.
© 2017 by McGraw-Hill Education
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Standard costing and variance analysis CHAPTER 15

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.1a Definition Standard costs are target costs for each operation that can be built up to produce a product standard cost. A budget relates to the cost for the total activity, whereas standard relates to a cost per unit of activity.

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.1b Operation of a standard costing system 1. Most suited to a series of common or repetitive organizations (this can result in the production of many different products).

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.1c Operation of a standard costing system (cont.) 2.Variances are traced to responsibility centres (not products). 3.Actual product costs are not required. 4.Comparisons after the event provide information for corrective action or highlight the need to revise the standards.

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.2 An overview of a standard costing system

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.3a Establishing cost standards 1.Two approaches: (i) past historical records (ii) engineering studies 2.Engineering studies A detailed study of each operation is undertaken: direct material standards (standard quantity × standard prices) direct labour standards (standard quantity × standard prices) overhead standards: cannot be directly observed and studied and traced to units of output; analysed into fixed and variable elements; fixed tend not to be controllable in the short term.

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.3b Standard hours produced 1.Used to measure output where more than one product is produced. Example Standard (target) times: X = 5 hours, Y = 2 hours, Z = 3 hours Output = 100 units of X, 200 units of Y, 300 units of Z Standard hours produced = (100 × 5 hours) + (200 ×2 hours) + (300 ×3 hours) = If actual DLH are less than the department will be efficient, whereas if hours exceed the department will be inefficient. Note: Different activity measures and other factors (besides activity)will influence cost behaviour.

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.4 Purposes of standard costing 1.To provide a prediction of future costs that can be used for decision-making. 2.To provide a challenging target that individuals are motivated to achieve. 3.To assist in setting budgets and evaluating performance. 4.To act as a control device by highlighting those activities that do not conform to plan. 5.To simplify the task of tracing costs to products for inventory valuation. Figure 2 Standard costs for inventory valuation and profit measurement

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.5a Direct material variances 1. Can be analysed by price and quantity. 2. Material price variance (SP – AP) × AQ (£10 – £11) x = £19 000A (Material A) (£15 – £14) x = £10 100F (Material B) Possible causes Should AQ be quantity purchased or quantity used? Example Price variance = units purchased in period 1 at £1 over SP 2000 units per period used. Should £ variance be reported in period 1 or £2 000 per period?

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.5b 3. Material usage variance (SQ – AQ) × SP (9 000 x 2 kg = ) x £10 = £10 000A (Mat.A) (9 000 x 1 kg = ) x £15 = £16 500A (Mat.B) Possible causes Speedy reporting required 4. Joint price/usage variance It could be argued that SQ used to compute price variance and that (SP – AP) × (AQ – SQ) is reported as a joint price/usage variance. 5. Total material variance = SC – AC

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.6a Direct labour and overhead variances 1. Can also be analysed into price and quantity. 2. Wage rate variance (SR – AR) × AH (£9 – £9.60) x = £17 100A Possible causes 3. Labour efficiency variance (SH – AH) × SR (9 000 x 3 hours = SHP AH ) x £9 = A Possible causes

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.6b Direct labour and overhead variances (cont.) 4. Variable overhead expenditure variance Flexed budget allowance (AH × SR) – Actual cost ( x £2 = £57 000) – £52 00 = £5 000F Possible causes 5. Variable overhead efficiency variance (SH – AH) × SR (9 000 x 3 hours = SHP – AH) x £2 = £3 000A Possible causes (note similarity to labour efficiency) 6. Fixed overhead expenditure (spending) variance BFO – AFO (£ /12 = £ ) – £ = £4000F

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.7a Sales variances 1. Variances should be computed in terms of contribution profit margins rather than sales revenues. 2. Example Budgeted sales = units × £11 = £ Standard and actual cost per unit = £7 Actual sales = units ×£10 = £ Variance in terms of sales value = £10 000F Variance in terms of contribution margin = £4 000A (Budgeted contribution margin = × £4 = £ Actual contribution margin = × £3 = £36 000)

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.7b 3. Objective is to maximize profits (not sales value). 4. Total sales margin variance Example Actual sales (9 000 × £90)= £ Standard VC of sales (9 000 × £68)= £ £ Budgeted contribution margin: × £20 £ Variance = £2 000 A

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.8 Sales variances (cont.) 5. Total sales contribution variance can be analysed further: Sales margin price = (AP – BP) × AQ or (AM – BM) × AQ Sales margin volume = (AQ – BQ) × SM Therefore, Sales margin price= (£90 – £88) × = £ F Sales margin volume = (9 000 – )× £20 = £ A £2 000 A Reconciliation of budgeted and actual profit (see slide 9).

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.9 Reconciliation of budgeted and actual profit £££ Budgeted net profit Sales variances: Sales margin price F Sales margin volume A A Direct cost variances: Material: Price A Usage A A Labour: Rate A Efficiency A A Manufacturing overhead variances: Fixed overhead expenditure F Variable overhead expenditure F Variable overhead efficiency A F A Actual profit

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Standard absorption costing 1. For financial accounting (stock valuation) fixed overheads must be allocated to products. This results in a volume variance. 2. Fixed overhead rate = budgeted fixed overhead = £12 per unit budgeted activity ( units) or £ / hours = £4 per standard hour = £12 per unit (3 ×£4). 3. If actual production is different from budgeted production, a volume variance will arise: Actual production = units or SHP Budgeted production = units or SHP Volume variance = units × £12 or (3 000 SHP ×£4) = £12 000A Volume variance = (AP – BP) × SR 15.10a

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 4. Volume variances are not useful for cost control since FC are sunk costs. 5. Sometimes analysed into two sub-variances (capacity and efficiency): (A) Budgeted hours of input and output = (B) Actual hours of input = (C) Actual hours of output = Volume variance = A – C = hours (£12 000) Capacity variance= A – B = hours (£6 000) Efficiency variance = B – C = hours (£6 000) 15.10b

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Reconciliation of budgeted and actual profit (absorption costing) To reconcile the budget and actual profit with an absorption costing system, the sales volume margin variance is measured at the standard profit margin (and not the contribution margin), i.e units × £8 = £ a

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.11b

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Recording standards costs in the accounts 1. Purchase of materials (Material A) Dr Stores ledger control account (AQ × SP) Dr Materials price variance Cr Creditors control Issue of materials (Material A) Dr Work in progress (SQ ×SP) Dr Material usage variance Cr Stores ledger control account (AQ × SP) a

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.12b 3. Recording of wages due Dr Wages control account (actual cost) Cr Wages accrued account The wages control account is cleared as follows: Dr Work in Progress (SQ ×SP) Cr Wages control account Dr Wage rate variance Dr Labour efficiency variance Cr Wages control account

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.12c 4. Manufacturing overhead cost incurred Dr Factory variable overhead control account Dr Factory fixed overhead control account Cr Expense creditors Absorption of fixed manufacturing overhead Dr Work in progress (SQ ×SP) Dr Volume variance Cr Factory fixed overhead control account Dr Factory fixed overhead control account Cr Fixed overhead expenditure variance 4 000

Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA 15.12d 6.Variable manufacturing overhead Dr Work in progress (SQ ×SP) Dr Variable overhead efficiency variance Cr Factory variable overhead control account Dr Factory variable overhead control account Cr Variable overhead expenditure variance account Completion of production Dr Finished stock account Cr Work in progress Note that the variances are transferred to the profit and loss account at the end of the period.