May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Permits, RFIs and CEQA, Oh My! When to Approve/Require RFI Amendments and When is CEQA Involved? 8 th LEA/CIWMB Partnership Conference May 11, 2005.
Certification of Compliance By Evita Lagard
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Revised ADC Regulations New text in italics and blue § Beneficial Reuse.
LEA Conference, Autumn 2007 Joseph Mello, Land Disposal Program Manager 1 WATER BOARD FINANCIAL ASSURANCE FOR KRFR.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Icfi.com © 2006 ICF International. All rights reserved. “Study to Identify Potential Long-Term Threats and Financial Assurance Mechanisms for Long-Term.
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
Module 7: Construction Phase
AB 2296 Adopt Regulations by January 1, 2008 that:Adopt Regulations by January 1, 2008 that: –provide for an increase in the closure and PCM cost estimates.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Comprehensive Asset Protection Each school district shall develop, implement, and maintain a comprehensive asset protection plan for every school building,
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1 Agenda Review Morning Session: Purpose of Workshop Roles and Responsibilities Steps in Permitting a Facility Break for Lunch.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Long-Term Postclosure Maintenance and Corrective Action Cost Estimates and Financial Assurance Demonstrations for Landfills General Overview of Regulatory.
Goal: Provide information on the Model Water Efficient Landscape Ordinance (MWELO) and how to implement it on your projects.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Cal/EPA Building Room 550 Financial Assurances Phase II Informal Rulemaking Group Meeting May 12, :00 am to 12:00 pm Financial Assurances Phase II.
Landfill Closure Issues. Stormwater Retention  Florida Regulations - –must collect and detain runoff from first 1” of rainfall (for > 100 acres, 0.5”
California Integrated Waste Management Board August 19, 2008 Item 6 Discussion And Request For Rulemaking Direction To Formally Notice The 45-Day Comment.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Lynne Welsh Massachusetts Department of Environmental Protection.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Transportation Conformity Overview H-GAC Conformity Workshop May 30, 2007.
Congratulations! It’s a Burn Dump. What Do You Do Now? LEA/CIWMB PARTNERSHIP CONFERENCE Anaheim, California May , 2005 California Environmental.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Commercial Project Reviews Information to assist with your project.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Update On Landfill Long-Term Financial Assurances Activities For Postclosure Maintenance And Corrective Action.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
Report On The Status Of The Remediation Of The Sonoma County Waste Tire Sites Board Meeting Agenda Item 4 February 18, 2004.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
August 9 - Agenda PEP Policy (Permit Enforcement Policy ) Workshop Issues PEP Policy Options Panel Next Steps Application Requirements (Laundry List)
December 6, 2004CIWMB P&E Committee Workshop1 Postclosure Maintenance Postclosure Maintenance Beyond the Initial 30 Years and Financial Assurance Demonstrations.
Cal/EPA Building Room 550 Postclosure Maintenance Workshop March 10, :00 am to 12:00 pm Postclosure Maintenance Workshop March 10, :00 am to.
California Integrated Waste Management Board Workshop July 9, 2009 AB 2296 Consulting Group Financial Assurances Phase II Rulemaking AB 2296 Consulting.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
California Integrated Waste Management Board CIWMB Permitting And Enforcement Committee Discussion of Local Enforcement Agency Evaluations Sacramento,
LEA EVALUATIONS Evaluation staff assess LEA performance to ensure LEA: 1)Provides consistent enforcement of statute and regulations. 2)Implements its.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
Jefferson County Planning Commissioners Hearing June 26, 2013
Framework for CSO Control Planning
Strategic Policy Development Committee May 12, 2009
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
MPO School Transportation Working Group
Residential Placement Application 2011
Straight to the Point – Watershed-based Plans Should:
Section 319 Grant Program – writing a proposal that can be funded
Presentation transcript:

May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed

May 11-13, 2005CIWMB/LEA Conference2 Topics General Overview Special Case – Trickling LFs Permit Interaction General Review Process Specific Review Issues

May 11-13, 2005CIWMB/LEA Conference3 Why? Protection of public health and safety and the environment (CIWMB/LEA) Protection of water quality (RWQCB) Legislature Says So CIWMB/LEA - PRC et seq. RWQCB - WC 13172

May 11-13, 2005CIWMB/LEA Conference4 Plan Types Closure Describes closure activities (e.g., final cover, drainage, monitoring systems, etc.) Postclosure Maintenance Describes inspection, maintenance, and monitoring of landfill during PCM period

May 11-13, 2005CIWMB/LEA Conference5 Plan Level/Purpose/Due Dates Preliminary Provide basis for cost estimate for C/PCM Conceptual Closure Design With JTD for review, revision, or new SWFP Final Provide cost estimate, plan, schedule for C/PCM Detailed descriptions of activities CEQA compliance required LTP Required 2 years prior to anticipated closure date

May 11-13, 2005CIWMB/LEA Conference6 Plan Level/Purpose/Due Dates (2) Partial Final Same as final 2 year submittal not necessary PCM Only After site certified closed Minimum every 5 years w/ permit review

May 11-13, 2005CIWMB/LEA Conference7 Topics General Overview Special Case – Trickling LFs Permit Interaction General Review Process Specific Review Issues

May 11-13, 2005CIWMB/LEA Conference8 Trickling Standard - 3 Parts Flow Level (i.e., “Trigger”) Long-term Inactive (12 months) Very Low Flow (2 <30% of 10 yr average) Criteria Capacity/likelihood to receive additional waste Cannot be to avoid or delay closure implementation Implementation LEA approval with CIWMB concurrence Maintain site in environmentally sound manner SWFP review/revised after approval Burden of Proof - Operator

May 11-13, 2005CIWMB/LEA Conference9 Trickling Calculation YearTonnageYearTonnage year average (minus max and min) = year average (last 2 years) = /4700 = 9.6% TRICKLING Note 30% of 4700 = 1410

May 11-13, 2005CIWMB/LEA Conference10 Trickling Approval Timelines Operator - Request to LEA (>120 days) LEA - Respond w/in 60 days CIWMB - Respond to LEA approval w/in 60 days Effective Feb 2003 Sites in violation as of 2/03 Only 2 sites approved

May 11-13, 2005CIWMB/LEA Conference11 Topics General Overview Special Case – Trickling LFs Permit Interaction General Review Process Specific Review Issues

May 11-13, 2005CIWMB/LEA Conference12 Permit Action Complete Plans Needed for permit application New, revised, permit review Consistent w/ SMS Needed for SWFP concurrence Effective Feb 03

May 11-13, 2005CIWMB/LEA Conference13 SWFP for PCM Effective Feb 03 LFs which did not initiate closure FCPMP incorporated into SWFP Permit revision not necessary at that time SWFP revised to reflect closed LF By time of certification of closure Ministerial action

May 11-13, 2005CIWMB/LEA Conference14 Topics General Overview Special Case – Trickling LFs Permit Interaction General Review Process Specific Review Issues

May 11-13, 2005CIWMB/LEA Conference15 Review/Approval Process CIWMB coordinates review LEA/RWB case-by-case basis CIWMB/LEA/RWB review for completeness (30-day limit) Agencies review for approvable (120- day limit, includes 30-day completeness time)

May 11-13, 2005CIWMB/LEA Conference16 Approval Levels Complete - all areas are addressed although not necessarily adequately (i.e., “in the parking lot”) Consistent w/SMS – all areas are addressed appropriately but not necessarily to an approvable level ( i.e., “in the ballpark”) Approvable - all areas are addressed adequately (i.e., “in the correct seat”) Financial Assurance CEQA/LTP – Final Only

May 11-13, 2005CIWMB/LEA Conference17 Here in Parking Lot In the Ball Park Correct Seat in Section 101

May 11-13, 2005CIWMB/LEA Conference18 Approval Levels Complete - all areas are addressed although not necessarily adequately (i.e., “in the parking lot”) Consistent w/SMS – all areas are addressed appropriately but not necessarily to an approvable level ( i.e., “in the ballpark”) Approvable - all areas are addressed adequately (i.e., “in the correct seat”) Financial Assurance CEQA/LTP – Final Only

May 11-13, 2005CIWMB/LEA Conference19 Review Responsibilities PRC (b) RWQCB - portions of plans related to protection of the waters of the State LEA/CIWMB - remaining portions of the plans Use JTD Index to determine shared topics

May 11-13, 2005CIWMB/LEA Conference20 Shared Responsibility RWQCB – Water Quality CIWMB/LEA – Non Water Quality Cover Design Drainage and Erosion Control Gas Monitoring and Control Postclosure Land Use Slope Stability Construction Quality Assurance

May 11-13, 2005CIWMB/LEA Conference21 Responsibility Sole Responsibility RWQCB Ground and Surface Water Monitoring CIWMB/LEA Site Security Structure Removal Gas Monitoring in Structures

May 11-13, 2005CIWMB/LEA Conference22 Topics General Overview Special Case – Trickling LFs Permit Interaction General Review Process Specific Review Issues

May 11-13, 2005CIWMB/LEA Conference23 Checklists Complete Preliminary Final Adequate/Approvable Preliminary Final On web page

May 11-13, 2005CIWMB/LEA Conference24 General Areas Math Engineering Calculations Design Assumptions Cost Estimates

May 11-13, 2005CIWMB/LEA Conference25 Cost Estimates Spreadsheet On web page Detailed Not every item needed for every site

May 11-13, 2005CIWMB/LEA Conference26 Cost Estimates (2) Closure Everything included If not built yet include in estimate 3 rd party 20% contingency Phased Closure Closure area PLUS open area

May 11-13, 2005CIWMB/LEA Conference27 Cost Estimates (3) Postclosure Maintenance Annualized cost x 30 Prorate for frequency <1/yr No pre-discounting (i.e., less in future) Can have options in PCM plan E.g., frequency table Revise estimate at that time Covers entire site – even if phased closure

May 11-13, 2005CIWMB/LEA Conference28 Phased Closure

May 11-13, 2005CIWMB/LEA Conference29 Gas Monitoring Triple completion if >30 ft At permitted boundary or closer Maximum 1000 ft ALONG perimeter Structure monitoring Control necessary?

May 11-13, 2005CIWMB/LEA Conference30 Gas Probe Placement

May 11-13, 2005CIWMB/LEA Conference31 Final Cover Minimum 3 ft (ET Covers) Interim Cover ≠ Foundation Layer Can under certain conditions Grading Slopes ≤ 1.75:1 (h:v) Bench – 15 ft wide every 50 ft elevation

May 11-13, 2005CIWMB/LEA Conference32 Drainage Design Storm Amount used Return frequency Whence data Old DWR report good but out-of-date Caltrans DWR Local Flood District

May 11-13, 2005CIWMB/LEA Conference33 Slope Stability Assumptions used ≥ 3:1 slopes Earthquake area

May 11-13, 2005CIWMB/LEA Conference34 Postclosure Land Use Included in Plan Transfer Station IS postclosure land use

May 11-13, 2005CIWMB/LEA Conference35 Timelines Reasonable

May 11-13, 2005CIWMB/LEA Conference36 Questions???? Michael Wochnick CIWMB - Closure and Technical Services