RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June 2009 1.

Slides:



Advertisements
Similar presentations
Anders Vinger, University of Oslo Personal Data Recovery The pain of laptops.
Advertisements

UCL HEP Computing Status HEPSYSMAN, RAL,
RAL Particle Physics Dept. Site Report. Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental.
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Alastair Dewhurst, Dimitrios Zilaskos RAL Tier1 Acknowledgements: RAL Tier1 team, especially John Kelly and James Adams Maximising job throughput using.
Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
Cambridge Site Report Cambridge Site Report HEP SYSMAN, RAL th June 2010 Santanu Das Cavendish Laboratory, Cambridge Santanu.
SouthGrid Status Pete Gronbech: 4 th September 2008 GridPP 21 Swansea.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Server Types Different servers do different jobs. Proxy Servers Mail Servers Web Servers Applications Servers FTP Servers Telnet Servers List Servers Video/Image.
RAL Site Report HEPiX Fall 2013, Ann Arbor, MI 28 Oct – 1 Nov Martin Bly, STFC-RAL.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
RAL Tier1 Report Martin Bly HEPSysMan, RAL, June
27/04/05Sabah Salih Particle Physics Group The School of Physics and Astronomy The University of Manchester
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
RAL PPD Site Update and other odds and ends Chris Brew.
Southgrid Technical Meeting Pete Gronbech: 16 th March 2006 Birmingham.
David Hutchcroft on behalf of John Bland Rob Fay Steve Jones And Mike Houlden [ret.] * /.\ /..‘\ /'.‘\ /.''.'\ /.'.'.\ /'.''.'.\ ^^^[_]^^^ * /.\ /..‘\
Group Computing Strategy Introduction and BaBar Roger Barlow June 28 th 2005.
SouthGrid Status Pete Gronbech: 2 nd April 2009 GridPP22 UCL.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPIX 2009 Umea, Sweden 26 th May 2009.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN RAL 30 th June 2009.
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
RAL PPD Computing A tier 2, a tier 3 and a load of other stuff Rob Harper, June 2011.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
UKI-SouthGrid Update Hepix Pete Gronbech SouthGrid Technical Coordinator April 2012.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
IHEP(Beijing LCG2) Site Report Fazhi.Qi, Gang Chen Computing Center,IHEP.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN – RAL 10 th June 2010.
Alessandro Cardoso, Microsoft MVP Creating your own “Private Cloud” with Windows 10 Hyper- V WIN443.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
RAL Site Report Martin Bly HEPiX Spring 2009, Umeå, Sweden.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
Scientific Computing in PPD and other odds and ends Chris Brew.
RALPP Site Report HEP Sys Man, 11 th May 2012 Rob Harper.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Explain the purpose of Microsoft virtualization. Objective Course Weight 2%
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
Cambridge Site Report John Hill 20 June 20131SouthGrid Face to Face.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
RAL Site Report HEP SYSMAN June 2016 – RAL Gareth Smith, STFC-RAL With thanks to Martin Bly, STFC-RAL.
Royal Holloway site report Simon George RAL Jun 2010.
WLCG IPv6 deployment strategy
Title of the Poster Supervised By: Prof.*********
Bob Ball/University of Michigan
The Beijing Tier 2: status and plans
HEPiX Spring 2014 Annecy-le Vieux May Martin Bly, STFC-RAL
Andrea Chierici On behalf of INFN-T1 staff
Glasgow Site Report (Group Computing)
Luca dell’Agnello INFN-CNAF
Oxford Site Report HEPSYSMAN
Статус ГРИД-кластера ИЯФ СО РАН.
NTC 324 RANK Education for Service-- ntc324rank.com.
ETHZ, Zürich September 1st , 2016
RHUL Site Report Govind Songara, Antonio Perez,
What is an operating system An operating system is the most important software that runs on a computer. It manages the computer's memory and processes,
Presentation transcript:

RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June

2 Steve Dallison

3 Outline The last year –Things we did and stuff we bought Where we are now The next year –What is coming up Some non *nix stuff

4 Over the last year Performance Hardware Other stuff Issues

5 Performance 1,382,736 jobs in year to –Cluster has been underutilised much of the time Availability 93% over last 6 months –Lower than we had hoped But not entirely our fault!

6 Jobs Run

7 Hardware Most purchasing was for GridPP 70 new SuperMicro twins (1120 cpu cores)‏ 25 new 20TB Viglen storage nodes (about 450TB of usable space)‏ Assorted new hardware for service nodes, etc. Not all new kit is yet fully commissioned

8 Other Stuff Tested SL5 WN Logging with rsyslog (to 2 hosts)‏ Setting up machines and services for assorted projects Desktop Linux –Talked to users –One test (SL5) box set up

9 Issues Air conditioning –Several failures, including twice in one week after Xmas Site power –Big power cut –Planned work (on short notice) The Sun Building Management System R89 delays and movement schedules

10 Where We Are Now ~613 TB Storage –dCache version CPU cores –2740 kSI2k Ahead of 2009 GridPP pledges

11 The next year Consolidate storage in R1, CPU in lab R27 Replacing RGMA and BDII hosts with virtual machines Local private network for IPMI, RAID, APC, etc. New machines to host VO software. An SL5 CE –Getting ready to move to all SL5 some time. –CREAM for added yumminess. Desktop Linux (again!)‏ LHC data? Networking...

12 Networking: now Nortel 55xx stack in R1 Similar switches installed in R27 but not yet stacked Interconnected through RAL site networking –2 * 1GB links to R27 –1 * 10GB to R1

13 Networking: planned Establish stack in R27 Connect machine rooms with direct 10GB fibre link Hopefully add second 10GB link later

14 Not just *nix… Windows Macs Other services

15 Windows Moving to Windows 2008 domain (as I speak!) Recent desktop machines running Vista Business VMs for some legacy software Laptops running Vista Ultimate with Bitlocker encryption (older laptops encrypted with Pointsec) Remote reporting/updating to our own WSUS (Windows Updates) service and Sophos Enterprise server

16 Mac An increasing number of Apple computers in the department Support still not “official” but provided on a best efforts basis Sophos antivirus –if you want to heckle this, wait for next year when we announce this for Linux! –Pointsec encryption

17 Some General Stuff Visitors’ network –Authenticated wireless access coming up... Promoting the use of WebDAV for remote file access, rather than PPTP (CERN already use this)

18 So… We have the technology… We’re doing pretty well, but are underutilised Now we need to work on –Reliability –Getting everything commissioned promptly –Improving our infrastructure