1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.

Slides:



Advertisements
Similar presentations
® Flats Track for Periodicals, Catalogs & Printers Automating Flat Mail Preparation in the Future Anita Pursley – Worldcolor Brent Raney - USPS National.
Advertisements

® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
CO-PALLETIZATION AND CO-MAILING UPDATE Mailers’ Technical Advisory Committee (MTAC), May 17, Update on Co-Palletization and Co-Mailing May 17, 2006.
Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
1 OneCode Solution (4-State Barcode) Implementation 6060 PRIMACY PKWY STE 201 MEMPHIS TN John Doe 6449 AMBERVIEW CV MEMPHIS TN #BWNGKVN.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion.
FSS / DPP PROGRAM OVERVIEW Flats Sequencing System & Delivery Point Packaging Status Update February 2005.
Postal Automated Redirection System (PARS) John Keegan Manager, Automation Equipment Engineering Mailers´ Technical Advisory Committee (MTAC) November.
1 Catalog Industry Update Tom Foti David Mastervich April 14, 2010.
® Flats Track for Periodicals, Catalogs & Printers Steve Forte Senior Vice President Operations, USPS Rosa Fulton Executive Director, FSS National Postal.
Background on USPS mail forwarding operations Overview of PARS
MTAC Workgroup 114 Establish Service Standards and Measurement First-Class Mail Measurement July 24, 2007 FCM Subgroup Meeting.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
Southern Area Operational Window Change Effective January 5, 2015 August 21, 2014.
National Postal Forum April 12, 2010 National Postal Forum ®
Greater New York Postal Customer Council
Status of NDC Activations MTAC Briefing August 12, 2009.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Northeast Area Mailing Industry Focus Group February 25, 2015 New York, NY.
Moving the Mail. NETWORK FACILITES NDC NETWORK RE-EGGINEERING HOW YOUR MAIL MOVES IMPROVING THE PARNTERSHIP.
MTAC Meeting February 23, 2005 Integrated Mail Management.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
Improving the Drop Shipment Process MTAC #87 Update Washington, D.C. November 2, 2006.
TECHNOLOGY IN THE U.S. POSTAL SERVICE Tom Day Vice President, Engineering.
1 Gary Reblin and Jan Caldwell Intelligent Mail & Address Quality Intelligent MAIL ™ in the U. S. Postal Service MTAC February 5, 2004.
POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)
® Letter Automation History Bill Galligan Senior Vice President, Operations MTAC Meeting January 31, 2008.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009.
® Flats Sequencing System (FSS) November 20, 2008 Rosa Fulton Phil Fabrizio.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
® FSS Update Rosa Fulton Executive Director, FSS MTAC General Session November 18, 2009.
Confirm/PLANET Codes  MTAC Summary Confirm Program Office
® FSS Update Rosa Fulton Executive Director, FSS MTAC May 20, 2010.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
1 Postal Operations John Rapp Senior Vice President, Operations.
MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.
® Flats Sequencing System (FSS) February 2009 Cathy MoonPhil Fabrizio FSS Project Office MTAC Meeting.
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report May 6, 2004.
1 Operations’ Update Fall and Holiday Periods 2002 Mailers Technical Advisory Committee Meeting August 7, 2002.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
® Network Distribution Center (NDC) Update Frank Neri Manager, Processing Operations.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Workgroup # 96 Developing An Interface To The AFSM 100 Automatic Induction Process POSTAL CO-CHAIR DAVE WILLIAMS INDUSTRY CO-CHAIR MIKE WINN.
Military Postal Service Agency FOUO 1 DoD Mail Acceptance & Delivery Solutions.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
MTAC – November 2006 Mailers’ Technical Advisory Committee Address Location for FSS Work Group #101 November 1 st, 2006.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
Mailing & Industry Focus Group
… January 14 – 16, 2014 Wanda Senne NAAD Meeting, February 28, 2014
USPS Pricing October 24, 2011 | 12:30 – 1:30 pm Eastern Time
Mailing and Industry Focus Group
NAAD/Mailers Hug Legislative Affairs Conference
Panel 2: Flats Containerization
Mail Prep & Entry Pre-MTAC Webinar
Network Rationalization
Presentation transcript:

1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update

2 Agenda  Overview of Flats Strategy Automate piece & bundle distribution of all flat mail Reduce non-value added work Improve existing processes / standardization  Future Flats Technology AFSM 100 enhancements Flats sequencing Flats bundle prep

3 Automating Piece / Bundle Distribution  Sequence all flats for delivery Flats sequencing phase 1 Beyond phase 1  Move flat mail up-the-ladder AFSM 100 efficiencies – non FSS zones Reduce manual processing  Finalize all bundles requiring distribution APPS, APBS & SPBS

4 Sequencing Flats  FSS Phase 1 – deploy 100 machines 37 sites on-line with FSS 85 operational machines  Ready for sequencing 96 machines 43 sites 100 th FSS machine Installed – April 2011 Operational – June 2011

5  Sequencing Operations - Delivery FSS Sequencing Operations Over 28,000 carriers are receiving sequenced flats 960 delivery unit on- line with FSS 1,351 zones on-line

6  CR-RT all flats for non-FSS zones AFSM 100 efficiency Merge classes at destination sorts  Reduce manual flat processing Originating FCM cancellations Periodicals processing policy Eliminate Hot 2C practices Process mail efficiently on automation Move Flats Up-the-Ladder

7  Equipment utilization Facility optimization & equipment consolidations Lean Six Sigma projects to streamline operations & increase productivities  Container density and transportation utilization Sort plan optimization Flat mail on the right network (surface / air) Process Improvements & Standardization

8 Agenda  Continuous Improvement of AFSM 100  Sequence More Flats  Increase Delivery Point capability of current FSS  Deploy new equipment to handle remaining flats volume  Automate Flats Bundle Prep Operations

9 AFSM100 Enhancements  Technology advancements Doubles detection Doubles reduction Flats Forwarding Bring Letter PARS capability to Flats

10 Manual Sequencing Automated Sequencing Reduces cost by 70% Flat Sequencing Costs

Flat Volume Trend FY 2005 –10 Flat volume decline 31% 17 billion fewer flats FY 2005 –10 Flat volume decline 31% 17 billion fewer flats Remaining Flats Sequencing Opportunity FSS Deployment FSS Design & Program Planning Future Flats Expectations Annual Volume (Billion) Saturation FSS Phase 1 Future Target 1.2 pcs per delivery point

Flat Volume Trend 10B additional sequenced flats are worth $1B annual savings for Function 2 Remaining Flats Sequencing Opportunity Future Flats Expectations Annual Volume (Billion) Saturation FSS Phase 1 Future Target ~.8 pcs per delivery point

13 FSS Challenges  Challenge Flat volume has declined 31% since 2005 Delivery points continue to rise  Technology solution Feeder that will feed 2X the speed of the current feeder Doubles delivery points per sort-plan

14 New Sequencing Technology  Desired Attributes / Functionality Significantly Less Floor space Volume Dependent vs. Delivery Point Dependent Lower Cost Demo – August 2011 Location: Lancaster, PA Floor Space Volume Delivery Points Cost

15 Flat Handling Process Today Mailers Bundle DistributionBundle PrepPiece DistributionDelivery

16 Eliminate Non-Value Added Work Mailers Bundle DistributionBundle PrepPiece DistributionDelivery

17 Flats Process Future Mailers Flats Sequencing Delivery Automated Bundle Preparation

18 Flat Prep Technology Eliminating Flats Prep  Evaluating additional solutions to seamlessly integrate mailer and USPS processes  Continuous; output of printers production equipment—input to USPS processing equipment  Concepts and designs are under development

19