The BDP planning cycle. Components 4 Project long-listing 3 Strategy formulation 5Shortlisting: Classification & ranking Implementation Development, promotion.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

1 EU Strategy for the Baltic Sea Region Evaluation: Setting Outcome Indicators and Targets Seminar: 15 March 2011, La Hulpe Veronica Gaffey Acting Director.
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Environmental Impact Assessment (EIA): Overview
Guidelines for Drafting Local Action Plans for Thessaloniki October 2013.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Planning with floods in the Lower Mekong Basin. 1/28 The agenda Regulation.
GEF Expanded Constituency Workshop Apia, Samoa 15 to 17 October 2013 Cross-Cutting Capacity Development Strategy – GEF 5.
PP 5.1: IWRM Planning Framework
Application Form Part 1, Sections 4-9 How to Apply Seminar 16 th September 2010 – Copenhagen Kirsti Mijnhijmer.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Using the DSF to assess scenarios Some things it will do for you - and some things it won’t.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
Guidelines for Impact and Adaptation Assessment Design versus Implementation Issues RICHARD J.T. KLEIN POTSDAM INSTITUTE FOR CLIMATE IMPACT RESEARCH (PIK)
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Delivering sustainable solutions in a more competitive world Application of Strategic Environmental Assessment (SEA) to the BDP Environmental Resources.
1 Policy Analysis for RISPO II National Workshop XXXXX 2006.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
LOCAL ENVIRONMENTAL ACTION PROGRAMMES (LEAPs) Succesfull SEA for local planning.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First Regional Workshop, Tunis January Cross-cutting issues to.
Resource allocation and optimisation model RAOM October 2003.
1 Stakeholders involvement in BDP. 2 ContentsContents MRC & Public Participation History, Policy and Strategy BDP & Stakeholder Involvement – Stakeholders:
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
EXPERIENCES OF THE MEKONG RIVER COMMISSION IN FLOOD MANAGEMENT AND MITIGATION IN THE LOWER MEKONG BASIN Petrina Rowcroft Development Economist Basin Development.
NAPA Experiences First thoughts for the ECBI Workshop Naivasha, September 2006 Balgis Osman Elasha Tom Downing.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 2 APPLICATION OF BASIN PLANNING PRINCIPLES Phnom Penh January 2003.
BDP Transboundary Process: Contribution to flood mediation Annual Flood Forum 7-8 April 2005.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
Module 6 Using Indicators to Measure Progress and Performance.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Presenter:- Mrs. Josette Maxwell-Dalsou Chief Economist Economic Planning Ministry of Finance, Economic Affairs and National Development.
Seite 1 GTZ Independent Evaluation in the Thematic Priority Area “Decentralization” (2008) Overview of Results and Recommendations Implications.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Environmental Safeguards
Num Dum Case Study.
Template Contents of the Low Carbon Development Strategy (LCDS)
Human Resource Management
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
Consultation & Participation
Supporting Cities and Regions through Projects and Programmes
Evaluation plans for programming period in Poland
EIA- Concept and Practice
Addressing the challenge of water scarcity and droughts
1.
ECONOMICS IN THE WFD PROCESS
SCREENING SCOPING SEA QUALITY CONTROL DECISION
THE WATER FRAMEWORK DIRECTIVE (WFD)
Assessment scales and aggregation
Presentation transcript:

The BDP planning cycle

Components 4 Project long-listing 3 Strategy formulation 5Shortlisting: Classification & ranking Implementation Development, promotion 1-2Analysis (and, later on, monitoring) Knowledge-base and tools (DSF, etc.) Knowledge-base and tools (DSF, SEA, etc.) External contributions

Analysis Baseline description: Geography, population, trends, resources, environment; assets, ‘hot spots’ Development agenda (social, economic, environmental): ‘Opportunities & constraints’ Scenario analysis (DSF-based) Stakeholders & dialogue Contributions to a strategy Project ideas

An LMB Strategy...should cover sectors & themes relevant for BDP...should reflect important assets, opportunities, priorities, concerns and inter-sector linkages...should provide criteria for shortlisting & ranking, and justification during promotion

An LMB Strategy...should observe national plans...should observe agreed regional plans + WUP rules...should be basinwide, holistic, and practical...should support added value (of integrated, basinwide planning, as comparted with national sector planning)...should support consistency of planned interventions

Origin of an LMB Strategy LMB Strategy (draft + final) Project ideas  The 1995 Mekong Agreement  The Water Utilization Rules  National policies & plans  National contributions  Dialogue partners and stakeholders  BDP sector reviews & sub-area studies  MRC sector plans: FMM, Navigation, etc.  Agreed regional policies & plans  Literature, research (WCD etc.)

MRC sector programmesMRCS Development banks, regional organisations, NGOs, others National agenciesNMCS Long-list From ideas to long-list

From long-list to shortlist Decision prepared by BDT Team in collaboration with national BDP organisations (possibly involving workshops) Decision made by JC or MRC Council

From long-list to shortlist Criteria 1 Compliance with LMB Strategy 2Basinwide significance 3 National priority 4 Value, side effects, risks 5 Completeness of decision basis 6 Implementation aspects Rating A - E

From long-list to shortlist Criteria 1 Compliance with BDP strategies 2Basinwide significance 3 National priority 4 Value, side effects, risks 5 Completeness of decision basis 6 Implementation aspects Rating A - E No shortlisting if 'no' to one of these criteria!

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate Uncontroversial, obvious benefits, no risks, obvious implementation

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate Proven benefits: Decision-basis in place (feasibility, benefits, impacts)

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate Apparently attractive, but need of preparatory studies (feasibility, benefits, impacts)

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate Less attractive; uncertain assumptions, benefits or risks; or attractive, but controversial projects

From long-list to shortlist 5 classes: AFast-track BPromote shortlist CDevelop DWait EReformulate Out of scope of BDP; small benefits, large risks, adverse side effects; or controversial

From long-list to shortlist 5 Completeness of decision basis 6Implementation aspects AFast-trackBPromoteCDevelopDWaitEReformulate 1Compliance with BDP strategies 2Basinwide significance 3National priority 4Value, side effects, risks

Thank you very much for your attention!

Analysis (1) Project ideas Strategy Planning basis Scenario analysis DSF, RAOM

Implementation Analysis (2) Shortlist Longlist Project ideas Exploratory analysis DSF, RAOM Rapid appraisal DSF, RAOM, SEA Detailed analysis DSF, EIA