A proposed solution to basic conveyance and ecosystem restoration problems By Robert Pyke Ph.D., G.E. Robert Pyke, Consulting Engineer Lafayette, CA.

Slides:



Advertisements
Similar presentations
THE REASONABLE USE DOCTRINE & AGRICULTURAL WATER USE EFFICIENCY Craig Wilson Delta Watermaster A Report to the State Water Resources Control Board and.
Advertisements

 1 Stormwater Management and Road Tunnel A “SMART” Solution Transportation Research Board Committee ADC60 Sustainable and Resilient Infrastructure Workshop.
Ted Craddock, DWR 2014 NWHA Conference Oroville Facilities FERC Project No
Stormwater Management Jamie Geils Lock, Project Engineer DuPage County Stormwater Management.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
1 Water Planning & Stewardship Committee Item #6b Summary Subject: Review of Long-Term Delta Actions & Water Supply Planning Implications Purpose:To open.
Floodplains by Design: natural infrastructure for people and for nature Kris Johnson, PhD 5/29/2013.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Long Term Storage Long term storage means to store water during high inflows years for the benefit of low inflows years. Long term storage means to store.
Dealing with Surface Water Discharge in a Sustainable Manner Laura Wilkinson Development and Flood Risk Engineer Sustainable Cities Tuesday 13 April.
Oregon Flood Hazard Data Standard v2.0 Summary of Proposed Amendment Collaborative Effort of: Jed Roberts (DOGAMI), Steve Lucker & Christine Shirley (DLCD)
1 Overview CA Department of Water Resources CCTAG Meeting March 30, 2012.
1 Regional Report San Joaquin River Hydrologic Region.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Urban Water Institute The Delta – Who’s in Charge Craig Wilson Delta Watermaster.
CALFED Finance Planning. Need for Finance Planning Status quo approach to rely so heavily on State bond funds unlikely in the future Existing funding.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Southern California Water Committee March 26, 2010 Ontario KARLA NEMETH, Natural Resources Agency.
To San Francisco The Delta Sacramento River  Stockton San Joaquin River California Aqueduct Clifton Court Forebay California depends on fresh water from.
Urban Water Institute Conference August 22,
Alluvial Fan 8-7 Delta.
Urban Water Institute Annual Water Conference August 27, 2015 S ITES R ESERVOIR P ROJECT
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
Corso di Sistemazione dei Bacini idrografici – a.a /07/08 Ilaria Pretto UPSTREAM FLOOD ATTENUATION PROJECT: SLAD BROOK PILOT.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
T. Beechie, D. Sear, J. Olden, G. Pess, J. Buffington, H. Moir, P. Roni, M. Pollock 2010, BioScience, v. 60.
Restoring Deltaic Functions on the Mississippi Harley S. Winer, Ph.D., P.E. Atkins, Metairie, LA Harley S. Winer, Ph.D.,
Welcome to everybody. Professor DR MD IDRIS ALI Principle Technical Teacher’s Traninig College Tejgaon, Dhaka 1208.
1 Comparing Futures for the Sacramento-San Joaquin Delta Engineers: Jay Lund, UC Davis* William Fleenor, UC Davis Economists: Ellen Hanak, PPIC* Richard.
Streamgaging Task Force Summary Report Advisory Committee on Water Information Herndon, Virginia September 10, 2003.
US Army Corps of Engineers BUILDING STRONG ® Value Engineering the Termination of the Blue River Flood Conveyance Channel Alan Schlindwein, PE US Army.
Project Status South Delta Improvements Program Project Status November 2003.
Sediment Management in Prado Basin and Lower Santa Ana River Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20,
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Sierra Water Workgroup Summit Daniel Schultz State Water Resources Control Board Division of Water Rights June 12, 2014.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
BAY DELTA CONSERVATION PLAN SEPTEMBER SUISUN BAY SACRAMENTO STOCKTON STATE & FEDERAL PUMPING PLANTS Getting Oriented – The Delta.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
Human Modifications (historical, modern) Altered Processes that Stress Ecosystem Function (physical, biological, chemical) Indicators of Poor Ecosystem.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
Marin Greenwood ICF International 1. Chapter 6: Effects Analysis for Delta Smelt Appendix 5.A: CalSim II Modeling and Results Appendix 5.B: DSM2 Modeling.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Salt River Ecosystem Restoration Project Salt River Watershed, Humboldt County Ferndale.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
1 California’s Water Supply: The “Big Fix”, Interim Solutions, and How We Get There CFEE Roundtable Conference October 5-7, 2008 Is There Enough Water?
Floodplain Management using ArcGIS and HEC-RAS
Container Transport Services Containers Transportation
Babcock Basin-Design Phase
Using Models to Explore Options for Middle Oconee River Management
Hazards Planning and Risk Management Flood Frequency Analysis
Zone 7 And WaterFix March 7, 2018
Oklahoma Floodplain Managers Association
Confluence Park Denver, Colorado
Climate Change and Potential Effects on California Water Operations
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Reservoir sedimentation
FLOODS IN ROMANIA IN 2006.
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
The River Nile 5/24/2019.
Vocabulary Square Vocabulary Square
Design and Engineering Services
CBEWP Chino Basin Conjunctive Use Environmental
California Water Commission
Sacramento Environmental Commission January 2019.
Presentation transcript:

A proposed solution to basic conveyance and ecosystem restoration problems By Robert Pyke Ph.D., G.E. Robert Pyke, Consulting Engineer Lafayette, CA

Two basic principles: Allow natural flows to pass through the Delta before any exports are extracted Extract more water during high flows and less or no water during low flows Leads to four physical elements:

1. Re-activate historic floodplain storage upstream of the Delta in order to stretch out the flood hydrograph and allow export pumping for a longer period of time during high flows.

1. Re-activate historic floodplain storage in order to stretch out the flood hydrograph and allow export pumping for a longer period of time during high flows. Has additional ecosystem restoration and flood mangement benefits!

1. Re-activate historic floodplain storage in order to stretch out the flood hydrograph and allow export pumping for a longer period of time during high flows. 2. Extract surplus flows somewhere in the Western Delta and construct much shorter tunnels to the vicinity of the Clifton Court Forebay.

1. Re-activate historic floodplain storage in order to stretch out the flood hydrograph and allow export pumping for a longer period of time during high flows. 2. Extract surplus flows somewhere in the Western Delta and construct much shorter tunnels to the vicinity of the Clifton Court Forebay. 3. Construct additional temporary storage facilities in the vicinity of the Clifton Court Forebay.

1. Re-activate historic floodplain storage in order to stretch out the flood hydrograph and allow export pumping for a longer period of time during high flows. 2. Extract surplus flows somewhere in the Western Delta and construct much shorter tunnels to the vicinity of the Clifton Court Forebay. 3. Construct additional temporary storage facilities in the vicinity of the Clifton Court Forebay. 4. Construct additional South of Delta storage.

Thank you! I’d be happy to address easy questions.