Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
WP4 – Plans for next 6 months
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
MM detector construction One or several modules per sector considerations.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Mechanics: (Tim).
Constructional requirements from ITk-Strips
Database requirements from ITk-Strips for DAQ loads
TK Upgrade report.
LOI Backup Document: R&D
Work packages status in Torino and perspectives
Presentation transcript:

Strip Tracker Costing Analysis Status Carl Haber July 25, 2011

Overview Can mainly derive a costing framework here Only consider CORE Will depend upon eventual layout, and CHF/item Seek a framework which can be easily adapted to layout variations and new assumptions Key inputs include costs and yield estimates – Yields based upon SCT/Pixel experience – Yields based upon present R&D experience – Yields based upon cost = specifications Other options – Industrialization – Number of sites/task: efficiency vs. activity

Costing History See USG 6/2011 presentation from Phil – A.Clark: attempt at bottom-up for Utopia – M. Tyndel: parametric based upon SCT – S.McMahon: rationalized MT analysis – But all were influenced by SCT experience Itemized comparison not possible in general due to differing methodology Similar conclusions for total cost based upon very different internal assumptions

Are there important differences as compared to SCT? ASICs will have (at least) 256 channels and are smaller Much less internal cabling, buses for TTC and power No TPG heat spreaders Hybrids will be panelized for mass production, assembly, and test Barrel support structures will be simpler since we do not need to mount modules nor dress cooling and cables There will be no discs upon which modules are mounted, only support rings/struts for petals Overall cost may dictate that work is broken down by item rather than site – economy of scale advantages (?)

Previous Costings (Core) SCT: 45 MCH M. Tyndel SCT scaled: 150 MCHF S. McMahon: rationalized: 80 MCHF A. Clark analysis: 70 MCHF – Most detailed, but a bit hard to follow – Expresses total module cost rather than breaking out items as they will be procured – ASICs types and counts need to be updated – Mechanical support, stave core not handled

Comparisons from Prior Work Mike T. SCT CoreFactor Cost scale Steve AC Barrel AC Discs Sensors ASICs Modules Opto LMT Offdet LV power HV power Cables DCS Engineering Total SCT

Components Stave Core – Facings: bulk material, cut to shape – Foam: critical patterning and gluing operation – Pipe assembly: forming and pressure certification – Edges: machining? – Bus tapes: commercial order, critical QA aspect to maintain yield of stave Module – Sensor: pre-spec’d from vendor, loss due to handling damage – Hybrid Substrate: commercial mfg, loss in parts mount, test ABCn130 HCC/DCS PPC Discretes End-of-Stave: critical reliability aspect – Substrate: commercial mfg, loss in parts mount, test – ASICS – Discretes – Connectors/cables: potential high cost, critical reliability aspect

chips discrt Complete staves Cores ready to load facings foam pipes edges Bus tapes modules ready for staves sensors hybrids EOS

Inputs Sensor costs (N.Unno): – Strip: 70 KCHF per wafer type and 1100 CHF per piece/wafer Strip ASIC {note: chip numbers in USG 6/11 not correct) (ABCn130) costs (P. Farthouat): 163K good die: 440 wafers = 1.55MUSD, NRE = 0.5 MUSD = 1.64 MCHF = 10 CHF/good ABCn130 (Prototype cost : 2 times NRE = 1 MUSD) HCC, PPC, GBT Hybrids Stave cores and tapes

Stave/Petal Core Mechanical/Tapes CF facing material – K13D2U, 65 grams/m 2., 52 KCHF/22 Kg = 2.36 KCHF/Kg – 1 stave requires 6 x m x 1.3 m x 1.5 (excess) = 1.4m 2 x 65 =.091 Kg – 2.36 x = 215 CHF/stave Foam – 960 CHF ($1200) per 1’x1’x1” block = 2400 cm 3 – X2 loss factor – 1 stave = 714 cm 3 : x 2 = 1430; (1430/2400)*960= 572 CHF Pipe: 3 m/stave Stainless steel negligable Titanium: 61 CHF/m: 184 CHF/stave Edge tube/C-channels: negligable Bus tapes: CHF each = 640 CHF/stave Total: = 1611 CHF/stave 521 staves * 1611 = 840 KCH Petal system area is about 40% of barrel: ~350 KCH

Utopia Barrel

Example Estimate Barrel stave Core only No setup costs, tooling, NRE No engineering, prototyping, pre-production No assembly, inspection, QA, or test equipment

Barrel Staves only, CORE, yield based, preliminary

Global Supports Comments Not included in estimate presented here, but, Barrels for staves, frames for petals Barrel is conceptually similar to SCT so OK to cost by scaling and inflation, but much simpler since no dressing – BNL analysis: 1.8 MCHF – A.Clark analysis: 3 MCHF Forward disc substrate is now gone and replaced by – Petal cores, now costed as part of cores – Support rings/frames, in principle (?) a more complicated fabrication than a thin barrel (?) not clear how to cost this – A. Clark analysis: 4.6 MCHF, seems too high… Parametric (S.M./M.T.) analysis based on SCT concluded that these supports would total 21 MCH! Clearly too large.

Comments Any new numbers presented here are preliminary and need to be checked further Fairly transparent structure for costing in an itemized and yield based manner Will extend to the disc system Need to look critically at the off stave cable and interconnect costs, off detector electronics Mechanical engineering aspects, outside the stave, are clearly a key area for study