Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

12-18 September 2005Gueorgui ANTCHEV 1 A data readout module for the TOTEM experiment Anelli G. 1, Antchev G. 1, 2, Aspell P. 1, Chalmet P. 3, Da Silva.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Status of the CSC Track-Finder Darin Acosta University of Florida.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC W.Snoeys – MIC group Collaboration meeting 25/2/2004 TOTEM ELECTRONICS.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
“Medium Term”: VFAT2 + SRS readout system
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
TOTEM Electronics Status
The Totem trigger architecture The LONEG firmware archtecture
Introduction Status before the 2009 run Results from the 2009 run
CSC EMU Muon Port Card (MPC)
T1 Electronic status Conclusions Electronics Cards:
same for both sectors 45 and 56
The digital read-out for the CSC system of the TOTEM experiment at LHC
Regional Cal. Trigger Milestone: Production & Testing Complete
Overview of T1 detector T1 is composed by 2 arms
The digital read-out for the CSC system of the TOTEM experiment at LHC
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Electronics  220m RP station of sector 5-6 brought up and running (only 1 VFAT out of 240 does not respond correctly).  With installation of T2 and RP at 220m significant progress and experience with the overall electronics system  Quite intense cabling activity, also on optical fibers for better protection and flexibility. Cabling in the tunnel complete, gradually moving to final configuration in the counting room  New repeater modules for electrical trigger signals (RP 220m) tested with final cables and signal generator. Now moving to test with real VFAT signals.  Printed circuit boards production problems and detailed detector electronics status: see next slides  Electronics providing interlocks for the machine currently under test after many iterations with the machine

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009  First production had soldering problem, some work, but can fail ‘any day’. CMS has received ~25 boards like this, and TOTEM ~20  After diagnosis new production recovering some of the components. First recovery phase finished and two new batches delivered:  10 5 delivered to TOTEM, 5 to CMS (with visit of Gueorgui and Sylvain to Israel)  24 all delivered to CMS, several with problems (4 defective, other 5 with workaround).  Communication with the company not easy – questions on the components, test results at the company, etc…  Need to speed up production. Host board status

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 DOHM Electronics system TOTEM Roman Pots FEC-CCS Trigger and Timing RP motherboard RP hybrid with VFATs and detector 220 m 147 m Tracking data Trigger data TTC data Trigger Timing Control Counting room Trigger data To DAQ Finished Feb 2009, units for 147 m under test Agreement with Cicorel on relaunch of production OK short cabling finished HOST board: clear soldering problem production relaunched

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Need cabling between motor racks and S1E8 (done) Need electronics box to treat the signals (negotiated simplified scheme with the motor control people) -> just got installed after rearranging of the rack by CMS Get tests done -> to be started Beam Interlock

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 End Switch 1 AND RP_OUT 1 RP_OUT 12 x 12 LVDT Resolver 1 FESA compare Position 1 Position 12 x 12 Limits GMT (SMP) OR CIBU 1 ALL_RP_OUT DEVICE_ALLOWED USER_PERMIT1 (Beam 1) USER_PERMIT1 (Beam 2) Interlock Block Diagramme End Switch 12 LVDT Resolver 12 x 12 compare CIBF 1 INJECTION_PERMIT (Beam 1) CIBF 2 INJECTION_PERMIT (Beam 2) TOTEM Operator OVERRIDE 1 OR STABLE_BEAMBACK_HOME IN MOTOR CONTROL RACK OR CIBU 2 DAQTR_OUT USER_PERMIT2 (Beam 1) USER_PERMIT2 (Beam 2) IN S2E11 (TRIGGER/DAQ) RACK AND x 12 AND ALL_RP_OUT Motor Control DAQTR 1 AND DAQTR_OUT 1 DAQTR_OUT 12 x 4 DAQTR 4 x 4 DAQTR DOWN OVERRIDE 2 MACHINE FLAGS x 12 OR

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009  12 Roman Pots installed, RP MBs received for rest of the pots, need testing  Printed Circuit boards issues HOST board (cfr supra) RP hybrid -> new production launched for 147m after discussion with company CC mezzanine production (delamination) Electronics for electrical repeaters tested, would like to test in tunnel + launch production, cabling for this almost debugged -> needs mechanical adaptation on HOST board Interlock box installed to be tested in situ (pcb already tested separately)  Cabling Lots of progress Local and alcove (maratons) cabling complete Local fibers installed, made support for optical fanouts Optical patch panel in counting room finished Roman Pot Electronics Status

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Gas detector hybrids: 370 destroyed in production (delamination) Hybrids delivered to T1 and T2:  To T1: delaminated, 255 working, need 280 in the experiment  Should look what can be recovered. Should look at ‘incorrect DAC parameters’ (double check limits) !! Issue = tripping effect  To T2: 233 strips 641 pads,  Need 160 and 520 working  Already relaunched 100 pads/100 strips in a small production here at CERN  Strip hybrids should be sufficient to cover immediate T1 need Working with Bice to get reimbursed, and with Cicorel for new production

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Electronics system overview CSC (T1) Anode frontend card with VFATs Cathode frontend card with VFATs Readout Card FEC-CCS TTC data Counting room Tracking data For T1 no on- detector coincidence, trigger formation in counting room only DOHM Trigger and Timing Trigger data To DAQ Raw trigger data Tracking data Raw trigger data OK Detector Hybrids HOST board: clear soldering problem production relaunched

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Lots of progress Detector hybrids + tripping issue Need to work on DCS/DSS box T1 (CSC) Electronics Status

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Electronics system overview GEM (T2) TTC data 11 th card with coincidence chip horseshoe optoTX GOHs DOHM FEC-CCS Rack near detector Tracking data Trigger data Tracking data Detector Counting room Trigger data TTC data Trigger and Timing Trigger data To DAQ DOHM optoTX GOHs OK Detector Hybrids HOST board: clear soldering problem production relaunched

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009  Need T2 DCS box installed to branch DCS but also DSS  Detector hybrids (see previous slide)  CC mezzanine production difficult (spares)  CCUM ok but need more spares T2 (GEM) Electronics Status

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 Printed circuit boards

Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009  Issues:  Host board production  Hybrids  CC mezzanine  T1 tripping  Lots of progress – large effort on cabling/mounting  Still need link between counting room and cavern  Test of interlock box  Need to cable DSS/DCS and finalize counting room USC55  Discussion with CMS for TTC Conclusions